Swing Gate Operator: Brackets and Structural Preparation

Plan the operator together with the gate. Before manufacturing and pouring the concrete, compare the leaf length and estimated weight, infill, wind exposure, and number of openings. Check the space available for the brackets and prepare the wiring. For an existing gate, measure these dimensions and check the mechanics. Install the operator only after the completed leaf has passed a successful manual test.

Swing gate: choose a topic
Measuring and procedure
Space and slope Frame, hinges, and infill
Operator and brackets Stops and accessories
In this article
Operator type 24 V or 230 V
Models and their limits Wingo: bracket dimensions
HOPP and underground operators Wiring and preparation
Safety and testing Frequently asked questions
Maintenance and faults Help choosing
Example: retrofitting an operator Example: masonry pillar
Example: before paving Power failure with no other access
Example: length and weight on the graph

When choosing, carry out these three checks: the leaf meets the combined length and weight limit, the brackets fit within the installation diagram, and the system can handle the required duty cycle. Meeting just one maximum is not enough.

How to choose a swing-gate operator

Start with the length of one leaf, measured from the hinge axis, and the weight of the frame, including infill and hardware. For a new gate, use the figures from the manufacturing drawing and material specifications, then check them again once the gate is complete. Record the usual number of openings and the busiest hour. The rating “up to 2 m / 400 kg” does not mean that both maximums apply at the same time.

Operator type When to consider it
Wingo / Toona linear operator For standard pillars, if the installation dimensions and stroke are suitable.
HOPP articulated operator The pillar requires a different mounting arrangement; check the full clearance needed for the arm.
S-Fab / M-Fab underground operator When the operator should not be visible; a enclosure and drainage must be prepared.

Example: adding an operator to an existing gate

You currently open two approximately two-metre leaves on steel pillars manually. When choosing, don’t rely solely on the rating “operator for gates up to 4 m”—each leaf is assessed individually.

  1. With the infill in place, check the full manual movement. If you need to lift a leaf or force it past a sticking point, repair the mechanics first.
  2. Measure the length from the hinge axis, determine the weight, and note the opening angle. Take photos of the hinge axis, pillar, and frame from the yard; for a linear operator, also note its specific installation dimensions.
  3. Compare a suitable motor with the complete kit. Check the control unit, brackets, stops, safety devices, and access to the release key during a power failure.

Related parts and procedures: manual test, operator models, Wingo measurements, kit contents.

24 V or 230 V motor?

What you’re comparing 24 V DC motor 230 V AC motor
Power supply The motor is powered by the corresponding control unit. A standard system has a 230 V mains supply. The motor runs on 230 V AC via a compatible control unit.
Backup battery Possible only with a supported control unit and the correct battery module. Not included as standard in the kit. A standard 24 V backup module cannot be connected here. Plan for emergency access based on the specific system.
Slowing and safety Features depend on the motor, control unit, and any encoder fitted. Features also depend on the control unit and motor; voltage alone does not determine the features.
Which one to choose Choose according to the leaf limits, geometry, number of cycles, and required features. The same criteria apply. Higher voltage alone does not mean a more powerful or suitable operator.

For a typical home driveway, first decide whether you want battery backup, how often you will open the gate, and how many cycles will occur consecutively. Then compare specific models. Confirm the cycle count, safety features, and compatibility in the relevant manuals.

Overview of models by leaf length

The table shows the maximum leaf length for each model. Then check the graph for the selected operator to confirm the permitted weight at your leaf length.

Model Length of one leaf, up to* Motor power supply / manual
WG2024 2 m 24 V DC
Operator manual (PDF)
WG3524 3.5 m 24 V DC
Operator manual (PDF)
TO4024 3 m 24 V DC
Operator manual online
Operator manual (PDF)
TO5024 5 m 24 V DC
Operator manual online
Operator manual (PDF)
TO7024 7 m 24 V DC
Operator manual (PDF)
HO7124 / HO7224 2.4 m 24 V DC
HOPP manual online
Operator manual (PDF)
SFAB2024 2.3 m 24 V DC
Operator manual (PDF)
Graph and manual online
MFAB3024 3 m* 24 V DC
Operator manual (PDF)
Graph and manual online
WG4000 2 m 230 V AC
Drive manual (PDF)
WG5000 3.5 m 230 V AC
Drive manual (PDF)
TO4005 3 m 230 V AC
Drive manual (PDF)
MFAB3000 3 m* 230 V AC
Drive manual (PDF)
Chart and manual on the website

* For M-Fab MFAB3000 and MFAB3024, use the 3 m limit as the basis for a new installation. Have the older name or a document listing 3.5 m confirmed for the specific drive version; do not assume it applies automatically.

* The stated length is the model’s upper limit, not a guarantee that the drive can also handle the maximum weight at that length. Also check the gate infill, wind load and mounting options.

The links in the table lead to the manuals for the individual drives. For electrical wiring, use the control unit wiring diagram supplied with the kit; 24 V and 230 V motors have different wiring.

Chart showing the suitability of NICE Wingo WG2024 and WG4000 drives by gate leaf length and weight.

NICE Wingo WG2024/WG4000 chart: the permissible weight decreases as the gate leaf gets longer; at 2 m it is approximately 200 kg. Click to enlarge.

Example: how to read the drive limit

  1. Find the length of one gate leaf, measured from the hinge axis, on the horizontal axis. The weight of the completed gate leaf is shown on the vertical axis.
  2. For Wingo WG2024/WG4000, the limit at 2 m is approximately 200 kg. Therefore, the standalone figure of 400 kg is not the capacity for a two-metre gate leaf.
  3. If the point falls above the limit, the model is unsuitable. If it falls within the permitted area, also check the infill and wind load, mounting dimensions and number of operating cycles. Only these checks together determine the right choice.

Example for our gate: for two leaves approximately two metres long, the deciding factors are their actual length from the axis, weight, infill and mounting dimensions. The length/weight point on the chart, together with wind load and geometry, will show whether WG2024 or another kit is suitable.

Full range of swing gate drives »

When there is limited opening space

Consider opening the gate outward when space on the property is limited. Check the entire swing area in front of the entrance, the property boundary and the drive mounting position. With Wingo and Toona linear drives, you will generally need a NICE PLA6 extended rear bracket; the mounting diagram for the specific model will confirm whether it is needed and where it should be positioned. See how to measure the space and slope. In a short driveway, a folding mechanismmay help; its joints, drive and anti-trap protection must be designed as one assembly.

Back to article contents

Check drive geometry before welding on the brackets

Wide masonry pier or recessed hinge

Measure the position of the hinge axis relative to the edge of the pier and the finished mounting surface. Also note the space behind the pier and the required opening angle. Then compare the linear drive’s mounting diagram with the space required for an articulated arm. HOPP is not an automatic solution for every wide pier; the arm must complete its full travel without colliding with anything.

Wingo WG2024 and WG3524: where to measure A, B and C from

The following plan view is Figure 4 from the NICE Wingo manual. Use it together with the chart for your model: WG2024 and WG3524 have different mounting charts. The drawing shows the gate opening inward; do not use its values for Toona or HOPP.

Original NICE Wingo plan view showing the hinge axis, drive pins and dimensions A, B, C and D.

The solid line indicates the closed gate; the dashed line indicates the open position. Click to enlarge the drawing.

Dimension Where to measure from and to in the plan view
C Measure perpendicular from the hinge axis to the pier surface where the rear bracket will be mounted. In the drawing, this is the lower edge of the pier. Allow for the finished cladding.
A In the direction of the closed gate leaf, measure from the hinge axis to the perpendicular projection of the centre of the drive’s rear pin. In the drawing, this is the horizontal dimension above the pier.
B Measure perpendicular to the closed gate leaf, between the hinge axis and the centre of the drive’s rear pin. In the drawing, this is the vertical dimension on the left.

Measure to the centres of the axes, not to the edge of the motor. A square or perpendicular guide lines on a sketch can help. The diagonal distance directly between the hinge and the rear pin is neither A nor B.

From measured C to the bracket position

  1. Choose the chart for your model. Find your measured C on the left. At the same height, read off B; A is shown on the chart’s horizontal axis.
  2. Take the required angle into account. A horizontal line from C will intersect the recommended installation line, d.i.l. Read off A below the intersection. Check which angle range the point falls within.
  3. Recheck the result on the pier. The bracket must position the centre of the rear pin at the selected A and B coordinates. If the required angle cannot be achieved, adjust the position within the permitted area of the chart; according to the manual, dimensions A and B should be similar.
  4. Determine the position of the front bracket. Select the D/E position for the model from Table 1 in the Wingo manual. Then check the specified height difference between the brackets, full travel, free movement and access to the key.

Wingo WG2024 and WG4000 mounting chart with angle ranges and A, B and C axes.

Mounting chart for the long Wingo models WG3524, WG5000 and WG3524HS.

Click to enlarge the chart. These mounting charts determine the bracket positions; they do not replace the separate chart for gate leaf length and weight.

Mounting charts in the Wingo manual (PDF)

If the bracket position does not work, do not simply move the pin to the nearest convenient spot. Check whether a suitable NICE PLA6 extended bracket, modification in accordance with the manual, or a different type of drive would be suitable. The front bracket must transfer force to the frame or a reinforcing member, not just to a thin slat. Assess the final position and anchoring together.

Wingo opening outward

Opening outward requires a different bracket arrangement. The Wingo manual for the setup shown in Figure 7 specifies the extended PLA6 bracket. Use the relevant drawing and table, and check for clear passage and the motor’s full range of movement. Figure 4 above is not a template for reverse mounting.

HOPP needs room for its arm

For HOPP, we are considering inward opening. Measure the space required for the unit and the arm’s movement using the HOPP’s own mounting drawing. At least 400 mm of clear space is required in the direction indicated in the drawing; this measurement is not the width of the pier. Check the arm’s full travel, hinge position and secure bracket mounting.

Clearance required between the HOPP drive and a fixed obstruction.

For the HOPP drive, leave at least 400 mm of clear space in the direction shown in the drawing. Click to enlarge.

Example: the hinge is set deep inside a masonry pier

A wide post alone does not determine which operator is suitable for it. The position of the hinge and rear bracket, and the clearance for the operator body or arm, are what matter.

  1. Measure the dimensions according to the drawing for the selected linear actuator. If the bracket cannot be positioned within the permitted range on the graph, do not simply move it to a position where it can be screwed on.
  2. Check whether an extended bracket is available for that model, or choose an operator with an articulated arm. With the HOPP, check the arm’s full inward movement; the solution needs both clearance and a solid mounting surface.
  3. Mark the edge of the cladding, the hinge axis and the position of the load-bearing core in the photo. The bracket must be anchored to the load-bearing section, with suitable distances between the anchors and the edges.

Related parts and procedures: Wingo geometry, HOPP geometry, Post and anchoring.

Underground operator: axis and water drainage

Determine the position and dimensions of the housing before pouring the concrete, using the specifications for the specific operator. Its output shaft must be aligned with the upper hinge. Before ordering, check where water will drain from the housing and how you will access the cover and manual release. For the M-Fab, also check the recommendation for an electric lock based on the gate-leaf width.

S-Fab SFAB2024 is the version without an encoder for the MC424 range. SFAB2124 has an encoder and uses the MC824H; these designations are not interchangeable. M-Fab MFAB3024 is 24 V, while MFAB3000 is 230 V.

Back to article contents

Prepare the wiring before paving and pouring concrete

Wiring selection starts with the motor and the specific control unit. The 230 V supply to the control unit and the motor voltage are two different things. With the current Wingo WG2024/WG3524 kit with MC424LR30, the motors operate on 24 V DC. The HOPP HO7124 has the control unit in the main operator; the HO7224 is the second motor.

Route / component What to prepare
Power supply A separately designed supply line, protective devices and power isolation. Electrical installation must be carried out by a qualified professional.
Both operators Passage between the posts and cable outlets at the brackets. The number of cores and the cross-section are determined by the motor and control unit.
Photocells Routes to both sides and, if necessary, to additional locations as determined by the risk assessment. Relay-type EPM and BlueBUS EPMB are not electrically interchangeable.
Flashing light and antenna Cable outlet in a visible location. The lamp voltage depends on the output of the specific control unit.
Lock, safety edges, controls Spare conduit and accessible connection points. The control unit manual specifies the particular interface and power supply.

Example: paving is not finished yet

First, determine the locations of the control unit, both motors, photocells and controls. It is easier to install a passage beneath the driveway now than to take up the paving later. With the HOPP, the control unit is in the main operator, so do not base the cable routes on a setup with a separate control cabinet.

Site plan showing the routes from a separate control cabinet to the motors and to the other side of the driveway.

The diagram shows the building work to be prepared. The electrical design for the specific setup determines the number of conduits, separation of cables and dimensions. Click to enlarge.

  1. Before excavation: mark the finished paving level, exact cable outlets and any additional components, such as a keypad or electric lock, on the sketch.
  2. Before covering the routes: check that the conduits are clear, install draw wires and photograph the routes with measurements from fixed reference points.
  3. For future additions: consider installing a spare conduit. Keep both ends accessible and protected from debris and water.

Have an electrician handle the mains supply, circuit protection, protective devices and cable installation. Connect the terminals and observe polarity according to the exact control board and accessories; the site plan is not a substitute for this.

Wiring example for MC424LR30

The following cable cross-sections and lengths apply to the Wingo setup with the MC424LR30. For a different control board, use its own manual. An electrician should assess longer cable runs, voltage drop, cable type and installation conditions.

Connection Cable type specified in the table Maximum
Supply to the control unit 3 × 1.5 mm² 30 m
Motor M1 / motor M2 3 × 1.5 mm² to each motor 10 m
Flashing light 2 × 1 mm² 10 m
Antenna Shielded RG58 cable 20 m; less than 3 m recommended

See the MC424LR30 wiring diagram including photocells. With a single-leaf gate, the M1 motor output is unused; for a different control unit, follow its own wiring diagram.

Before laying the paving, also decide on the location of the keypad, key switch or mobile control. The lock, sensors and controls may each require a separate route and a different power supply.

Back to article contents

Where to check for crush hazards

Safety depends on the entire system: the gate’s design, its surroundings, the operator, the control system and correct adjustment. A photocell monitors only its own beam. It may not detect a person near the hinge or in the space between an open gate leaf and a fixed fence.

Plan view showing crush points on an automatic double-leaf gate.

Solid line: closed position. Dashed line: open position of the same leaves. The diagram marks locations to check; it does not specify safe distances.

Location What to check during testing
1. At the hinge and post Whether the gap closes during movement in a way that could trap a hand or foot.
2. Between the leaves The movement sequence, overlap and final position against the central stop.
3. Near a fixed obstacle The entire swing path of the open leaf in relation to the fence, wall, car and sidewalk.
4. In the passageway The photocell positions, control system response and areas outside their beams.

Choose protection based on the actual gaps and gate movement: covers, safety edges, suitable sensors or force limitation. Have a qualified installer commission the automation system. If protection relies on force limitation, its effectiveness must be verified using the appropriate measuring device, in accordance with applicable requirements and the manual. A manual test or the installation of photocells alone does not replace this verification.

Back to article contents

Installation and initial testing

  1. Confirm that the gate moves smoothly by hand, the hinges are secure and the stops work properly.
  2. Before drilling or welding, check the dimensions and travel in the manual for the exact operator, including the bracket when opening outward.
  3. Connect the motors, safety devices and controls according to the wiring diagram for the control unit actually supplied. Mains connection must be carried out by a qualified professional.
  4. Set the direction, leaf sequence, travel, forces and safety input responses according to the manual.
  5. Run repeated cycles and test the safety functions, manual release and behavior after a power failure.

If a leaf sticks or stops in the wind, check the mechanics, infill and suitability of the selected model. Simply increasing the force is no substitute for fixing the cause.

Back to article contents

Frequently asked questions before ordering

Can an operator be added to an existing gate?

Yes, if the gate is suitable for automation. Check that it moves smoothly by hand, inspect the hinges and frame strength, then measure the space for the brackets. If the gate leaf catches, sags or twists, repair the mechanism first.

Can I install the operator later?

Yes. However, choose a suitable type while building and check its installation dimensions. Prepare solid mounting points for the brackets and conduits for the motors and accessories. For an underground operator, you also need to plan the enclosures and drainage in advance.

How do I open the gate during a power outage?

Following the instructions, release the operator with the key and open the gate manually; if it has a lock, unlock that too. Test access to the manual release in advance, especially if you don’t have a separate pedestrian gate. For this type of entrance, choose an emergency access method before installation.

If the gate is the only entrance to the property: before buying, check how you will access the motor release and the lock during a power outage. A key kept inside the house won’t help if you’re locked out. Consider a second entrance or an exterior release approved for the system; a supported battery backup has limited capacity.

Battery backup is an option only for a setup that supports it. If you have an electric lock, also check its status after a power outage. Automatic bolt release will not, by itself, release a jammed operator.

Back to the article contents

Maintenance and common problems

Symptom What to check first
Gate leaf has sagged Hinges and their fastening, anchoring, frame deformation and movement of the post.

Choosing and inspecting hinges

Catches only along part of its travel Ground conditions and obstructions, hinge alignment and bracket geometry.
Stops in windy conditions Gate infill and wind, operator suitability and the mechanism. Increasing the force alone won’t solve the problem.
The leaves collide when closing The closing sequence of the leaves, overlap, stops and settings of the specific control unit.

Closing sequence of the leaves

Water in the underground enclosure Drainage, a clear drain and the condition of the enclosure.

Measuring the ground

Gate does not respond Power status, indicator signals and diagnostics for the exact control unit model. Safety inputs remain part of the wiring.

Regularly checking the fasteners, hinges, stops, corrosion, free movement, safety devices and manual release will keep the gate in good condition. The inspection interval depends on the manufacturer’s recommendation and frequency of use. Carry out maintenance with the power disconnected, including the backup supply, and with the leaves secured; use a lubrication method suitable for the specific hardware.

Back to the article contents

We’ll help you choose a setup for your entrance

Send us the length and approximate weight of each leaf, the type of infill, the hinge axis relative to the post, the required opening angle and photos of the site. We can advise you on choosing an operator and accessories; compatibility is confirmed by the installation diagram for the exact model and the installation conditions.

Continue based on what you need to solve
Stops, drop bolts and accessories · All situations and examples