A stop defines the end position, a drop bolt secures the gate leaf, and a suitable lock locks it. Choose them to suit the frame, the finished driveway surface, and the operating method. On an automated gate, the locking mechanism must work with the operator; a standard manual drop bolt must be released before the operator starts.
| Swing Gates: Choose a Topic | |
|---|---|
| Measuring and Procedure | |
| Space and Slope | Frame, Hinges and Infill |
| Operator and Brackets | Stops and Accessories |
Check the Complete Assembly Before Ordering
| You choose | What goes with it |
|---|---|
| Manual drop bolt | Matching keeper or socket, frame mounting, and the required bolt reach. If the socket has no stop face, a separate stop must define the leaf position. |
| Lock | Keeper, suitable mounting position, and access to the key. For electric locking also ensure the correct power supply and controls, plus an emergency release. |
| Operator kit | Check the number of motors, the specific control unit, and the package contents. Brackets, receiver, remotes, photocells, and warning light may vary between kits. Check separately extended brackets, stops, cables, and anchors. |
How a manual setup works, viewed from the yard. Hinges and infill are sized separately; open leaves need their own hold-open devices. Click to enlarge.
What Stops the Gate and What Holds It in Place
| What | Why | Type and Selection |
|---|---|---|
| Closing stop | Defines the final position of the closed leaves. | Ground stop Choose one to suit the frame clearance above the finished surface and the anchoring method. |
| Opening stop | Stops the leaf at the end of its opening travel. | External or built-in mechanical stop, depending on the specific operator. Check the position and opening angle. |
| Open-leaf retainer | Also holds a manual gate leaf so it cannot swing back freely. | Choose the retaining mechanism and how it is released. A fixed stop alone does not provide this function. |
| Drop bolt | For example, secures the passive leaf of a manual gate. | Bolt and suitable keeper; compare the diameter, travel, and mounting height. |
| Lock | Locks the gate. | Manual locking or electric locking depending on how the gate is operated. |
When automating a gate, choose stops according to the operator manual. A learned run time is not a general substitute for a mechanical stop. A fixed open-leaf retainer must not remain engaged when the motor starts closing the gate.
Install the stop to suit the finished paving
Before drilling, check contact with the frame, clearance beneath the car, and the travel path of both leaves. Paving installed later can change both the clearance beneath the frame and the drop bolt reach required. Choose anchors suitable for the structural substrate; the thin paving slab alone may not be sufficient.
For a low-clearance car, also check that it can pass over the stop. Make sure gravel, leaves, and snow can be cleared from the drop bolt and its socket. Keep the water outlet clear; a drainage hole alone does not guarantee protection against freezing.
Example: Finished Paving and a Low-Clearance Car
You are choosing a central stop and a ground-mounted drop bolt. The key factors are the height of the frame’s bottom edge, the car’s path, and the structural substrate beneath the paving.
- Close and align the leaves. Measure the gap from the finished surface to the frame at the stop location, and where the drop bolt will reach.
- Compare the stop height with its contact point on the frame and the car’s actual clearance. Where the slope changes, the vehicle’s published ground clearance alone is not enough.
- If you choose an EGS recessed socket, use a separate stop to define the final position. With SABO, assess the stop face, bolt opening, anchoring, and cleaning access together.
Related parts and guides: stops, EGS and SABO, choosing a drop bolt.
How to Choose a Drop Bolt and the Right Keeper
On a manual double-leaf gate, the passive leaf is often secured with a ground-mounted drop bolt. Choose one only after determining the closed frame position and the finished surface height.
- Measure the reach: the distance between the drop bolt mounting point and the keeper. Compare both the overall length and usable travel of the product.
- Compare the bolt and opening: their diameter, position and required insertion depth as shown in the product drawing.
- Check operation: allow space for the handle and its movement, and ensure the raised bolt is held in place so it does not scrape the ground when the gate opens.
- Choose the keeper: a recessed socket or a stop with an opening. Determine how it will be anchored and drained, and how it can be accessed for cleaning.
Measure both the engaged and raised positions. When opening, the pin must not catch on a higher point in the driveway. Click to enlarge.
EGS socket or SABO stop?
EGS is a recessed socket for the pin, with water drainage. It has no stop plate, so it does not determine the gate leaf’s end position by itself. SABO combines a bottom stop with an opening for the gate latch. Choose it based on the gap between the finished ground and the bottom edge of the leaf, the pin size, and the installation instructions.
| Sockets and stops in our range | |
|---|---|
![]() |
Locinox EGS – gate latch socket Recessed socket for the pin, with water drainage. It has no stop plate; arrange the leaf’s end position separately. |
![]() |
Locinox SABO – stop with opening Bottom stop with an opening for the gate latch. Choose based on the gap above the finished paving and the pin size. |
Two examples of securing a manual gate
| Situation | Parts and checks before ordering |
|---|---|
| You already have a stop but need an opening for the gate latch | Gate latch + recessed EGS socket. EGS is for pins up to Ø 20 mm and has no stop plate. Measure the pin’s reach, the height of the finished paving, and the space available for installation with drainage. |
| You need both a stop and a surface-mounted socket | Compatible gate latch + SABO. Check that the pin is up to Ø 20 mm and that the gap between the surface and the bottom of the gate is 20–45 mm. For VSA, VSF and KEYDROP, the manufacturer specifies a 40–60 mm profile; this is not a universal combination for every gate latch. |
For both solutions, check that the raised pin is clear of the entire travel path and that each open leaf has suitable securing of its own. If you plan to add an operator later, manual locking must be adapted for automatic operation.
Lockable gate latch or installation inside the frame
A stop alone, or a standard non-locking gate latch, will not lock the gate. Choose a lock or a lockable gate latch, such as KEYDROP. For concealed SUBY installation, first check the profile’s internal space and wall thickness; prepare the mounting hole according to the product drawing.
| Locking and installation inside a profile | |
|---|---|
![]() |
Locinox KEYDROP – lockable gate latch Gate latch that locks with a key. Check the available space on the profile, the required lift, and the position of the socket. |
![]() |
Locinox SUBY – in-profile gate latch Gate latch fitted inside the gate leaf profile. Before cutting the hole, check the profile, wall thickness, and installation drawing. |
Locinox VSF has a different arrangement: its handle may be blocked by the second leaf when the gate is closed. Do not confuse this locking method with installing SUBY inside the profile. Find more sizes and versions among our swing-gate latches.
The electric lock must be compatible with the operator
Check the lock requirements before preparing the wiring. For M-Fab, the manufacturer recommends an electric lock for leaves wider than 2.5 m; this is not a threshold that applies to all operators. For other operators, follow the instructions for that specific model.
NICE PLA10 is a vertical lock, while PLA11 is a horizontal lock; both use 12 V AC. Check the output and control method in the manual for the control unit actually installed. The motor voltage does not determine the lock’s power supply.
An electrically operated bottom latch is another option. It must be fully released before the leaf moves and engage only when the leaf is in the correct position. Check the required power supply, control signal, socket, and emergency release method.
In the event of a power failure, depending on the design, the electric lock may remain locked or release. Check the exact model’s behavior and access to the key. Releasing the latch does not release a locked motor; also see manual operator release and backup power.
The overlap determines the opening sequence
If one leaf has a cover strip that overlaps the other, it must be released first when opening and close last when shutting the gate. Test this movement manually first. Then set the correct sequence and delay in the specific control unit; do not guess the motor numbers based on the left and right sides.
In this example, the left-hand leaf A carries the strip; with the overlap reversed, the roles are reversed. Refer to the control unit manual for motor numbers and delay settings. Click to enlarge.
For a manual setup, first close and secure the passive leaf, then close the active leaf. The stop and socket must align in this position. The lock or gate latch must not be forced to compensate for a sagging or twisted frame. For unequal-width leaves, assess each operator and its travel path separately.
How will you operate the gate every day?
Check what is included in the operator kit before ordering. A receiver, remote controls, photocells, or a warning light may already be included. Choose accessories based on the exact control unit model and who will use the gate.
Position the button or keypad so the user stands clear of the moving leaf and operator arm when entering a command. An electric key switch sends a command to the control unit; it does not replace the mechanical release key in the event of a power failure.
| What | Why | Type and checks |
|---|---|---|
| Key switch | Operate the gate at the entrance without a remote control. | Switches: contact and wiring must match the control unit input. An electrical command is not a mechanical emergency release. |
| Keypad | Code-based access for household members or approved visitors. | Check the wired, bus, or radio interface and any decoder in the control system. |
| Mobile control | Open the gate and manage access according to the module’s capabilities. | GSM or Wi-Fi solution: signal, power supply, connection to the control unit, and any SIM/service. An open command may not confirm the gate’s actual position. |
| Backup power | Operation during a mains failure in a supported setup. | Backup for the specific control unit. Check the connector, charging, and accessories; it is not universal for all 24 V operators. |
| Remote control | An additional user or control for multiple devices. | Check the receiver, encoding, and frequency. The same frequency alone does not confirm compatibility. |
Choose safety devices according to the location
Photo cells monitor their own beam path. They do not replace an assessment of areas around the hinges, between the leaves, and by the fence. Choose the interface for photo cells, safety edges, and their monitoring according to the control unit and the gate's risk areas. Select the beacon's power supply according to the control unit output.
Frequently asked questions about choosing parts
Do I also need a gate stop for a motorised gate?
Follow the instructions for the specific motor: it may use an external or built-in mechanical stop for that direction. Teaching the travel limits does not mean you can omit the specified stop. Check both the open and closed positions.
Is a spring-loaded bolt automatic?
A spring alone does not mean electrically operated release. With a standard manual bolt, the operator must release the gate leaf before starting the drive. For automatic locking, choose a device that works with the control unit.
Will a wheel help if the gate leaf is sagging?
First find the cause: hinges, frame, anchoring, or post. Support wheel can support a gate designed for it; it is not a general fix for its mechanics.
What to check before ordering
- Profile dimensions and a secure mounting point for the part.
- The finished clearance beneath the gate leaf, the pin diameter and travel, and the matching socket.
- Opening direction, overlap, and access to the handle or key.
- For an electrical component, the exact control unit model, power supply, interface, and behaviour during a power failure.
- Kit contents, anchoring, cables, and parts that need to be ordered separately.
Send us a photo of where the gate leaves meet, the stop location, and the profile and ground-clearance dimensions. For an automatic gate, include the drive label and control unit model. We'll help you choose parts that are compatible.
| Continue based on what you need to solve |
|---|
| Measuring and choosing an approach · All situations and examples |