1. Choosing components for a cantilever gate

2. Frequently asked questions and answers:

1. Can a cantilever gate be built on a slope?
2. Do the carriages or the inside of the C-profile need to be lubricated to ensure the gate runs smoothly?
3. Why choose a cantilever gate? What are the advantages?
4. Why do you recommend carriages with pivoting and adjustment? What are they used for?
5. Which components do customers most often buy in addition to the KIT?
6. What ground clearance does a cantilever gate have?
7. Where should the toothed rack be mounted on the gate?
8. At what height should a NICE operator be installed?
9. What size of rectangular hollow section should be used to build the cantilever gate?
10. Which cables should be used to power a NICE operator?

3. Description of the basic components of a cantilever gate

Carriage with bearing rollers Gate catch Electromechanical operator
C-profile Top/side guide Remote control
Bottom guide roller Profile end cap Photocells

 


Choosing components for a cantilever gate

Universal component kits

To make choosing easier, we have put together COMPONENT KITS for cantilever gates.

We can tailor the KIT contents to your requirements. If you have a specific request or would like advice, email [email protected].

Note: the clear opening is the distance between the posts that remains unobstructed when the gate is open.

Choosing a C-profile

Choose the C-profile based on the total weight and length of the gate leaf, the clear opening, the frame construction, the type of infill and the wind load. The following guidelines are intended as a rough guide:

These figures are indicative only. If only one limit is exceeded—for example, if the gate weighs less than 400 kg but the clear opening is wider than 4.5 m—the choice should be checked against the complete design. The overall load capacity is also affected by the reinforcing profile above the C-profile, the other frame materials, the infill and local wind conditions.

Example:
Standard dimensions of a cantilever gate with a clear opening of 400 cm and a height of 150 cm, using a 70 × 70 × 4 mm C-profile, an 80 × 40 × 2 mm reinforcing profile, and all other structural steel gate components made from 60 × 40 × 2 mm material, the following values apply:

Gate weight (excluding the visible infill): approx. 120 kg
Load per 1m: 0.9 kN/m (90kg/1m)
Tension/compression reactions: 18.49 kN / 10.81 kN
Total load capacity: 480 kg

 

For the example above, a 70 × 70 × 4 mm C-profile and matching carriages with five bearing rollers, i.e. components from the SADA-01 or SADA-03-RBS. The frame itself weighs approximately 120 kg; the remaining capacity for the infill is indicative and must be verified against the specific design before manufacturing.

Contact us: we’ll check your gate specifications and recommend suitable components. Email: [email protected].

Complete range of C-profiles

Black steel C-profilesBlack C-profiles Galvanised C-profilesGalvanised C-profiles Stainless steel C-profilesStainless steel C-profiles

All C-profile sizes and finishes »

Choosing support carriages

Most common carriage types

Carriage with 3 bearing rollers3-roller carriage Carriage with 5 bearing rollers5-roller carriage Carriage with 8 bearing rollers8-roller carriage

All types of sliding gate carriages »

This guide is indicative for standard gates. Carriage suitability should be assessed alongside the weight, overall gate leaf length, infill type and wind load. If you’re unsure which to choose, contact us.

Anchoring support carriages to a concrete foundation

Support carriages can be:

For detailed information about anchoring a sliding gate you can find out HERE. We’ll also be happy to advise you on the dimensions of the concrete foundation.

Concrete foundation dimensions for a cantilever gate

Detailed concrete foundation dimensions for various cantilever gate sizes can be found HERE: concrete foundation dimensions.
Please note:

  • the foundation must extend below the frost line, as determined by local conditions; the required depth may vary from one area to another,
  • before pouring the concrete, remember to provide an electricity supply and cable routes for the operator. Even if you’re planning a manually operated gate, it’s a good idea to install conduits in advance. You can then operator install it at any time in the future.

Concrete foundation for a sliding gate
A description of dimension “X” and further details can be found HERE: concrete foundation dimensions.

Choosing the gate guide system

Top guide is suitable when the gate infill does not extend above its frame. It is fixed to an existing fence or to a separate alignment post. Side guide is suitable when the infill needs to extend above the gate frame; the guide rollers are fitted to a post on the inside and run in a U-profile or L-profile on the gate leaf.

The choice of guide system depends on the space around the gate, the available fixing points, and whether the infill needs to extend above the top frame rail. If so, a side guide is generally the better option. Individual guide rollers can be used with a custom-made guide system.

Sliding gate side guideSide guide Sliding gate top guideTop guide Individual guide rollersIndividual rollers

Complete range of sliding gate guide systems »

Example of use side guide (BR-43G):
You can use an L-profile or U-profile for the side guide to run in. Ideally, use two of these guides side by side: one “pushes” the gate outwards, while the other “pushes” it inwards, keeping the gate properly centred.

Example of using a side guide

Recommended top guide (VVR-3-G):
For standard applications, we recommend the universal top guide VVR-3-G with a length of approximately 25 cm. The roller position and clearance between the gate and fence can be adjusted to suit the installation. If you need a wider adjustment range, an extended version is also available: extended VVR-3-G-300 guide with an overall length of 30 cm.

VVR-3-G top guide – standard 25 cm version

 

Choosing a gate operator

When choosing a gate operator, consider not only the gate’s weight but also the leaf length, frequency of use, required speed, and wind load. For standard use, here are the current NICE models:

Current NICE gate operators and manuals

Gate weight up toCurrent gate operatorDocumentation
400 kgNICE RBS400Official NICE documentation
600 kgNICE RBS600Official NICE documentation
1000 kgNICE RB1000Official NICE documentation

Estimating the gate’s weight

For example, a standard cantilever gate measuring 400 × 150 cm, with a 70 × 70 × 4 mm C-profile, with a frame welded from 60 × 40 × 2 mm box section weighs approximately 125 kg. The table also shows weights for other opening widths, using the same box-section material (S235JRH structural steel, size 60 × 40 × 2 mm):

300 × 150 cm gate approx. 90 kg
350 × 150 cm gate approx. 110 kg
400 × 150 cm gate approx. 130 kg
450 × 150 cm gate approx. 170 kg
500 × 150 cm gate approx. 190 kg
550 × 150 cm gate approx. 210 kg
600 × 150 cm gate approx. 230 kg
650 × 150 cm gate approx. 260 kg

 

The weights shown are approximate and apply only to the frame configuration described. Add the infill, fittings, and other components to the total weight; when designing the gate, also take the leaf length and wind load into account.

You’ll also need to add the infill you plan to fit to the gate to its total weight. If you’re unsure which gate operator to choose, email us at [email protected].

We stock operators from several brands; this overview includes examples from NICE. We sell, recommend, and use NICE gate operators ourselves. In our experience, problems and warranty claims with this brand are almost nonexistent.

Cantilever gate construction

The gate frame is made from hollow steel sections. The section sizes are selected according to the gate’s overall length, weight, infill, and wind load. As a rough guide, estimate the total gate length as the opening width × 1.4 + approximately 0.2 m for the guide. For a 4 m opening, that works out to approximately 5.8 m. This is only a rough calculation; larger or heavier gates may require a greater tail section.

For a lightweight gate, the tail section may be shortened after checking the dimensions and load capacity of the selected system. If you have enough room, we recommend keeping the full tail length; a longer tail generally reduces the load on the support carriages and improves gate movement.

Gate tail section is the part of the gate leaf that extends beyond the clear opening width. It transfers forces to the support carriages, so its length must be appropriate for the gate’s length, weight, and construction.

Telescopic cantilever gate

Telescopic system for a cantilever gate

If there isn’t enough room alongside the fence to slide a standard cantilever gate open, a two- or three-panel telescopic cantilever gate may be the solution.

Components and more information about telescopic cantilever gates »


 

Some questions and answers about cantilever gates:

1. Can a cantilever gate be installed on a slope?

For an automatic cantilever gate, we recommend that the gate leaf move horizontally. The ground beneath the gate may slope, but the C-profile, carriages, and travel path should remain level. A gate that moves on a slope requires a bespoke design, a safety assessment, and suitable protection against unintended movement.

The simplest solution is to adapt the bottom edge and infill of the gate leaf to the slope while keeping the support system and operator level. Other solutions need to be designed individually to suit the specific slope and gate operator.

2. Do the carriages or the inside of the C-profile need lubricating?

No. The bearing carriages and the inside of the C-profile do not normally need lubricating. Remove any dirt that has entered the profile during storage, transport, or operation.

3. Why choose a cantilever sliding gate? What are the benefits?

  • » low maintenance requirements
  • » no track across the opening that needs clearing of snow and debris
  • » does not intrude into the roadway
  • » the gate leaf slides along the fence; the safe clearance behind the gate depends on the specific design
  • » the cantilever sliding gate moves above the ground, so it can also be installed on uneven terrain
  • » simpler groundwork: no need to pour a long concrete foundation for a track (which must be level)
  • » there is no track or other obstacle across the opening to impede the gate’s passage. In winter, you won’t have to worry about clearing snow and debris from the track.
  • » more about the differences between cantilever and track sliding gates »

4. Why do you recommend adjustable, pivoting carriages?

The pivoting action helps distribute the load evenly across the bearing rollers as the gate moves. Height adjustment makes it easier to install and level the gate, and to set its clearance above the ground.

5. Which components do customers most often buy in addition to the kit?

For a manually operated gate, it’s mainly hook lock. It is also often supplemented with an upper stop or a second pair of lower stops and a receiver at the open end. This solution must be adapted to the design, weight and operating conditions of the specific gate.

6. What ground clearance does a cantilever gate have?

The supplied carriages are height-adjustable. If the bottom edge of the carriage is installed level with the surrounding ground, the following table shows the approximate minimum and maximum clearance.

Clear opening / C-section 70x70x4 mm C-section
C-section cross-section
80x80x5 mm C-section
C-section cross-section

up to 2.8 mCarriage with 3 bearing rollers
carriage with 3 bearing rollers

V-06-3

Hmin: 78 mm
Hmax: 98 mm

V-06-1

Hmin: 73 mm
Hmax: 93 mm

up to 4.5 mCarriage with 5 bearing rollers
carriage with 5 bearing rollers

V-02-3

Hmin: 95 mm
Hmax: 115 mm

V-02-1

Hmin: 90 mm
Hmax: 110 mm

up to 6.5 mCarriage with 8 bearing rollers
carriage with 8 bearing rollers

V-07-3

Hmin: 90 mm
Hmax: 110 mm

V-07-1

Hmin: 85 mm
Hmax: 105 mm

You can also adjust the gate's ground clearance by changing the installation height of the support carriages. When designing the gate, allow a safe margin for uneven ground, snow and movement of the structure.

7. Where should the rack be mounted on the gate?

Rack is usually mounted on the reinforcing section above the C-section. However, its position must match the installation dimensions of the specific drive and ensure proper engagement with the pinion throughout the gate's entire travel.

8. At what height should a NICE drive be installed?

Determine the drive height based on the position of the rack and the dimensions specified in the installation instructions for the specific model. The specified clearance must be maintained between the rack and pinion; the drive must not support the weight of the gate.

  • use the original base plate and anchoring hardware supplied with the drive, following the installation instructions,
  • use a suitable steel base or threaded rods designed for the specific drive and anchoring method,
  • prepare the base height so that the drive can be precisely adjusted and remains accessible for servicing.

9. Which steel sections should be used to build a cantilever gate?

The most commonly used material is structural steel. The dimensions depend on the overall length, weight, infill and wind load. For typical smaller gates, 60 × 40 × 2 mm sections are often used, with an 80 × 40 × 2 mm section as the lower reinforcing member; however, this is not a universal structural design.

Other section sizes can also be used for the frame. For a larger, heavier or solid gate, we recommend having the design checked by a structural calculation or a qualified professional.

For hot-dip galvanizing, the design must also account for vent and drainage holes, the galvanizing plant's process requirements and the risk of heat-induced distortion. A thicker section wall can reduce the risk of distortion, but it does not eliminate it. Confirm the specific design with the galvanizing plant in advance.

Box-section steel kit for making a sliding gate, 40x40x2 mm
Clear opening Kit name Kit includes:
3.0 m JOKL-01 2× 40×40×2 section – length 6 m
1× 80×40×2 section – length 6 m
4.5 m JOKL-02 3× 40×40×2 section – length 6 m
1× 80×40×2 section – length 6 m
Box-section steel kit for making a sliding gate, 60x40x2 mm
Clear opening Kit name Kit includes:
3.0 m JOKL-03 2× 60×40×2 section – length 6 m
1× 80×40×2 section – length 6 m
4.5 m JOKL-04 3× 60×40×2 section – length 6 m
1× 80×40×2 section – length 6 m
5.5 m JOKL-05 4× 60×40×2 section – length 6 m
2× 80×40×2 section – length 6 m
6.5 m JOKL-06 4× 60×40×2 section – length 6 m
3× 80×40×2 section – length 6 m
Box-section steel kit for making a sliding gate, 80x40x2 mm
Clear opening Kit name Kit includes:
3.0 m JOKL-07 3 × 80 × 40 × 2 profile – 6 m long
4.5 m JOKL-08 4 × 80 × 40 × 2 profile – 6 m long
5.5 m JOKL-09 6 × 80 × 40 × 2 profile – 6 m long
6.5 m JOKL-10 7 × 80 × 40 × 2 profile – 6 m long

We offer customers the convenience of buying everything in one place, including the steel materials needed to make a gate. Together with the component kit we will also send you the recommended installation procedure.

Gate infill: The infill can be matched to the style of the fence and house, for example using wooden slats, steel, aluminium or plastic profiles, polycarbonate, or expanded metal mesh. For solid infill, wind load must be taken into account in particular.

10. Which cables should I use for NICE operators?

NICE ROAD 400 (RD400)

For NICE ROAD 400 with relay photocells prepare the following cables. Two cores are sufficient for the TX transmitter; for the RX receiver, we recommend a four-core cable for the power supply and relay contact. This is not a two-wire BlueBUS connection.

ConnectionCable typeMaximum length
Operator power supply (230 V)1 pc. 3 × 1.5 mm230 m *
Photocell TX (transmitter)1 pc. 2 × 0.25 mm230 m
Photocell RX (receiver)1 pc. 4 × 0.25 mm230 m
Warning light1 pc. 2 × 0.5 mm220 m
Antenna1 pc. shielded RG58 coaxial cable20 m; less than 5 m is recommended
Key switch2 pcs. 2 × 0.5 mm2 or 1 pc. 4 × 0.5 mm250 m
Fixed safety edge1 pc. 2 × 0.5 mm230 m
Moving safety edge1 pc. 2 × 0.5 mm230 m **

* For power cables longer than 30 m, a larger cross-section is required, for example 3 × 2.5 mm2. An electrician must assess the required conductor cross-section and protective earthing based on the installation.
** A moving safety edge requires a device that maintains the connection while the gate leaf is moving. Connect multiple safety edges according to the instructions for the specific operator and safety edges.

Cables must be suitable for the environment and installation method. Have the wiring and commissioning carried out by a qualified professional. For details, see the NICE ROAD 400 manual.

NICE RBS400, RBS600 and RB1000

The following indicative wiring information applies to NICE RBS400, NICE RBS600 and NICE RB1000. Always check it against the latest manual for the specific model and accessories before carrying out the installation.

 

Indicative wiring:

ConnectionCable typeMaximum permitted length
A: Power supply (230 V) 1 pc. 3 × 1.5 mm2 30 m (note 1)
B: Warning light with antenna

1 pc. 2 × 0.5 mm2
1 pc. shielded RG58 coaxial cable

20 m
less than 5 m is recommended

C: Photocells 1 pc. 2 × 0.5 mm2 30 m (note 2)
D: Key switch 2 pcs. 2 × 0.5 mm2 (note 3) 50 m
E: Fixed safety edges 1 pc. 2 × 0.5 mm2 (note 4) 30 m
F: Moving safety edges 1 pc. 2 × 0.5 mm2(note 5) 30 m (note 5)

Note 1: A power cable longer than 30 m may be used, but it must have a larger cross-section, for example 3x2.5 mm2. Near the device,
a ground connection must be provided.
Note 2: If the BlueBUS cable is 30–50 m long, use a 2x1mm2 cable.
Note 3: Instead of two 2x0.5 mm2 cables, you can use one 4x0.5 mm2 cable.
Note 4: If you want to use more than one safety edge, see the connection-type information in chapter 7.3.2, “STOP input”, which is
recommended by the manufacturer.
Note 5: Special devices must be used to connect safety edges on moving gate leaves; these allow the connection to remain in place while the leaf is
moving.

 


 

Description of the main components of a cantilever sliding gate

Bearing roller carriages

The carriages run inside the C-profile and support the gate leaf. The rocking action helps distribute the load evenly across the rollers as the gate moves. Keep the bearings protected from dirt and install them according to the manufacturer's instructions.

C-profile

The thick-walled, bent structural steel profile supports the gate leaf above the ground and guides it along the supporting carriages. The frame is welded to it according to the design.

Bottom guide roller

The bottom guide roller is fitted to the end of the C-profile. When the gate closes, it rolls into the receiving pocket, helping to support and stabilize the gate.

Receiving pocket

The bottom stop catches the guide roller when the gate closes, supports the leaf and helps stabilize it against lateral forces.

Top and side guide

The guide keeps the upper part of the gate on its designated track. Adjust the rollers to guide the gate reliably without unnecessary friction.

C-profile end cap

The end cap closes the open end of the C-profile on the side without the bottom guide roller.

Electromechanical operator

The drive unit and control electronics automate the movement of the gate. Choose the model according to the gate's specifications and intended use.

Remote control

The radio transmitter sends the operator's receiver a command to open or close the gate, or to perform another programmed function.

Photocells

Photocells are a safety device. If the beam is interrupted, the control unit will stop the gate, prevent it from starting, or reverse its direction, depending on the wiring and programming.

Warning light with antenna

The warning light indicates gate movement and, with compatible operators, its flashing can help with diagnostics. The integrated antenna improves radio signal reception; it is not a radio receiver.


 

Where to go next:

» Ask us anything

Email [email protected], and ask us any technical questions about your gate.

» Use the form “Get advice from a salesperson"

Once you have filled in the basic details of the gate you are planning, we will send you a quotation listing the recommended components for a cantilever sliding gate. Find the form HERE.

» View the photo gallery

Photos of DIY installations, where people built their gates themselves using our components. Find the photo galleries HERE.

» Why shop with us?

See the benefits of shopping in our store and customer reviews, from customers who have already shopped with us components for a cantilever sliding gate.

 

If you couldn't find the information you need, get in touch and we'll be happy to help with your project.

You may also like: I have limited space for a cantilever sliding gate. What are my options?

Author: Ing. Ján Kubíček