NICE M-Fab MFAB3024 - standalone underground operator for a swing gate leaf up to 3.5 m/600 kg
| Product availability: | within 3 days | We usually dispatch goods within 3 days. |
|---|
within 3 days
€347.91 including VAT
| Weight |
|---|
| 11 kg |
Description of NICE M-Fab MFAB3024 - standalone underground operator for a swing gate leaf up to 3.5 m/600 kg
NICE M-FAB MFAB3024 is a standalone underground irreversible drive with a 24 V DC motor and magnetic encoder for one gate leaf. It does not include a control unit; for a new setup, use NICE MC824HR30. For two leaves, you need two motors and one compatible control unit.
The motor is concealed beneath the hinge axis, so it does not affect the gate’s appearance. It is also suitable where there is no room beside the leaf for a linear actuator or articulated arm actuator. The box itself forms the lower support for the gate leaf. 24 V is the motor voltage; the MC824HR30 has a 230 V AC mains supply.
Controls and compatible accessories
Both 24 V M-FAB motors use the MC824H control unit with encoder inputs. The MC824L is not a replacement for this motor. For an older MC824HR10, follow the procedure for the board actually installed; do not apply MC824HR30 settings to a different generation.
| What | Why | Type |
|---|---|---|
| Control unit | Controls one or two motors. Wiring. |
|
| Warning light | Indicates movement. The control unit determines the supply and permitted current draw; output specifications. |
Other warning lights select according to the voltage and maximum current draw of the FLASH output on the control unit actually installed. |
| Photocells | Protect the passage area according to the positioning and operating mode. Wiring and setup. |
Connect wired BlueBUS pairs to BLUEBUS. EPMOW require the radio interface NICE IBW connected to BlueBUS; they do not connect directly by wire like EPMB. With FT210B, the transmitter on the gate leaf is battery-powered, while the receiver connects to BlueBUS with two wires. FT210B also transmits the safety-edge status. Relay photocells connect to contact inputs, not to BlueBUS. |
| Transmitter | Remote control. The coding type must match the receiver installed. ON3ELR is for OXILR; ON3EBD is for OXIBD. Pairing remote controls. | |
| Receiver | Receiver for the SM control unit connector. OXIBD and OXILR use different radio systems; choose transmitters according to the receiver. |
|
| Antenna | Improved remote control reception. Connect the antenna to the installed receiver; for OXIBD, connect it directly to its antenna terminals. | |
| Keypad | Access by code. EDSWG must match the radio receiver; EDSB uses BlueBUS and requires device learning afterward. | |
| Key switch | Key-operated control via a volt-free NO contact connected to the step-by-step, open, or close input. | |
| Electric locks | Recommended for securing a gate leaf longer than 2.5 m; lock output. |
|
| Card readers | Access by chip or card. ETPB connects to BlueBUS; perform device learning after installation. |
|
| Backup power supply | Operation during a power outage. Choose the battery according to the control unit generation and connector. |
For MC824HR30 NICE PSS324. The older PS324 on the MC824HR30 requires Standby to be disabled (L4 = OFF) and the CABLA11 and the corresponding setting; backup connection. |
Motor, foundation box and release mechanism
| Assembly component | What you need |
|---|---|
| MFAB3024 motor | One 24 V motor with a magnetic encoder, a 2 m power cable, a connecting lever and a mechanical closing stop. |
| Foundation box | MFABBOX made of case-hardened steel or stainless steel MFABBOXI. The box includes an opening stop. Not included with the motor when purchased separately. |
| Manual release | NICE MEA2 with a key or NICE MEA3 with a lever. The release mechanism must be accessible and correctly connected to the gate leaf. |
| Control and safety | MC824HR30, photocells, receiver, remote controls and warning light, depending on the gate configuration. They are not built into the motor. |
| Wider opening angle | NICE MEA1 with chain drive; for gate leaves up to 2.5 m only, with suitable external stops. |
Both the box and motor can be used with right- or left-hand gate leaves. When replacing parts, check compatibility of the specific box, connecting lever and release mechanism.
Kits for one or two gate leaves
The kits include the motor and safety accessories listed below. The number of motors matches the number of gate leaves; two motors do not increase the limit for a single gate leaf. When choosing, refer to the suitability chart.
| One gate leaf | Standalone motor | Two gate leaves |
|---|---|---|
1 motor, 1 MFABBOX box, 1 MEA3 release mechanism. MC824HR30, OXIBD, 1 MYGO4 remote control, 1 pair of EPMB photocells and 1 ELDC warning light. | Standalone MFAB3024 motor One 24 V DC motor. The box, release mechanism, control unit and safety equipment are selected separately. | 2 motors, 2 MFABBOX boxes, 2 MEA3 release mechanisms. MC824HR30, OXIBD, 1 MYGO4 remote control, 1 pair of EPMB photocells and 1 ELDC warning light. |
Gate length, weight and operation
For a new installation, allow for a gate leaf length of up to 3 m. The chart permits a weight of 600 kg for a gate leaf up to 2.5 m; for a 3 m leaf, the lower limit shown in the chart applies. Do not use the older 3.5 m rating as a general limit for a new installation; for a longer gate leaf, have the suitability of the specific configuration confirmed.
| Parameter | Limit and condition |
|---|---|
| Length of one gate leaf | Up to 3 m for a new installation; check the weight against the chart as well. |
| Weight of one gate leaf | Maximum 600 kg for a gate leaf up to 2.5 m. |
| Operation | 76 cycles/h at 90°; half that at 180°, i.e. 38 cycles/h. Motor rated duty cycle: 80%. |
The horizontal axis of the chart shows the length of one gate leaf in metres, and the vertical axis shows its weight in kilograms. The combination must remain within the blue area; do not use this operator outside it.
A solid infill, a tall gate or strong winds may reduce the permitted load. The resistance of the hinges, the shape of the gate leaf and the strength of its mounting also matter. The gate leaf must move smoothly by hand along its entire travel and must not start moving by itself when released.
Duty cycle 80% does not mean continuous operation without breaks. Actual operating intensity is affected by the opening angle, load, temperature, and the acceleration and deceleration settings. A wider opening angle increases travel time and reduces the available number of cycles.
Installing the box and attaching the gate leaf
The foundation box pin and all the gate leaf hinges must share a common axis. The axis of rotation must not change as the gate moves. Misalignment puts strain on both the operator and the gate and cannot be remedied by increasing the force. Installing the underground operator foundation box.
- Check the gate leaf's load-bearing capacity and condition, the opening clearance, and access to the cover and release mechanism. If the gate leaf has a pass-through gate, opening it must disable the automation.
- Prepare the foundation pit, cable conduit and an effective drainage pipe.
- Before pouring the concrete, attach the opening-stop bracket to the box. Follow its orientation and dimensions as shown in the stop diagram.
- Set the box level in the concrete, with its pin exactly beneath the axis of the upper hinge.
- Fit the operating lever and ball onto the box pin. Weld the gate leaf securely to the release lever as shown; the gate leaf must remain securely mounted on its hinges.
- Lubricate the contact points with a suitable lubricant and grease the bearing through the grease nipple.
- Insert the motor in the correct position. Insert the closing-stop bracket into the corresponding opening and secure the motor with four self-locking nuts and the supplied washers.
- Connect the motor to the gate leaf using the connecting lever. Adjust both stops and check the full travel by hand.
- Route the cable through the conduit, outside the box. Any electrical junction box must be located outside the underground box.
Labels in the alignment diagram: 1 hinge, 2 box pin, 3 concrete foundation.
Labels in the motor-to-gate-leaf connection diagram: 1 release lever, 2 connecting lever, 3 ball, 4 operating lever, 5 pin. The exact installation depends on the actual foundation box and its drawing.
The motor’s metal housing has IP67 rating. The rating does not replace drainage or regular cleaning of the box; the box must not remain flooded. There must be no electrical connectors in the foundation box.
Mechanical stops and opening angle
In a standard installation, the maximum opening angle is 110°. The closing stop is supplied with the motor, and the opening stop with the foundation box. Adjust the end positions by positioning the stops; these are not electrical limit switches.
With the accessory NICE MEA1 a wider opening angle of up to 360°, only for a gate leaf up to 2.5 m. A chain drive requires suitable external stops and an assessment of the entire gate-leaf travel. A wider opening angle cannot be achieved simply by changing the control unit’s programming.
Tighten the stop locknuts after adjustment. For a gate leaf longer than 2.5 m an electric lock is recommended NICE PLA10 or NICE PLA11; connection to the ELS output.
Connecting the motor and magnetic encoder
Disconnect the mains power and backup battery before wiring. The supplied motor cable is 2 m. If extending the cable, use a suitable junction box outside the foundation box; joining wires inside the box is prohibited.
| MFAB3024 wiring | Connection to MC824H |
|---|---|
| Blue and brown | 24 V DC power pair to M1 or M2. The control unit reverses the power supply polarity; the +/− polarity is not fixed. |
| Black and grey | ENC1 for M1 or ENC2 for M2. The encoder connection on the MC824H is not polarity-sensitive; never connect it to the motor power supply. |
| Yellow-green | Protective earth (PE); do not use it to power the motor or as an encoder wire. |
For a single gate leaf, use M2 and ENC2, leaving M1 unused. For two gate leaves, M2 opens first and closes last; M1 closes first. Each encoder must correspond to the same motor as its motor cable.
For the MC824HR30, the motor cable, including PE, is 3 × 1.5 mm² and the encoder cable is 2 × 1.0 mm²; both cables must be no longer than 10 m between the control unit and the motor. They can be replaced with a single 5 × 1.5 mm² cable. Cables must be suitable for the environment and protected from water. Complete MC824HR30 wiring.
MC824HR30 accessory terminals and power supply
| Connection | Voltage, polarity and limit |
|---|---|
| Auxiliary power supply | + is the left terminal of the SbS pair; − is the right terminal of the STOP pair, when viewed with the STOP and SBS labels legible, as shown in the image. 24 V DC −30/+50%, 200 mA maximum in total; power remains on in Standby. |
| BLUEBUS | Two wires for compatible EPMB and other devices. No polarity; this is not a universal 24 V output for arbitrary accessories. |
| FLASH | 12 V DC, 21 W maximum; for example, ELDC. Connect to the dedicated FLASH output, not to the STOP/SbS auxiliary power supply. |
| ELS | 12 V AC, 15 VA maximum for an electric lock; no +/− polarity. Select the output function to suit the connected load. |
| OGI | Gate-open indicator: 24 V DC, 4 W maximum. The output function depends on the control unit settings. |
| SbS / OPEN / CLOSE | Control input: volt-free NO contact; do not apply external voltage to the command input. No polarity applies to the contact. |
| STOP | Safety contact NO/NC or 8.2 kΩ resistive edge, depending on the wiring and subsequent learning procedure. This is not a universal power supply pair. |
For the FLASH and OGI outputs, connect the load according to its markings and the control unit wiring diagram; do not confuse them with the STOP/SbS auxiliary pair. Add up the current draw of the accessories, as continuous power supply reduces battery life. Detailed auxiliary power supply.
Photocells and safety inputs
Connect compatible devices to BLUEBUS using two wires, with no regard to polarity. Each pair of photocells must have its own function address; the TX and RX jumpers for a pair must match. FOTO 3 is not used in this swing-gate installation. For locations, addresses and responses, see MC824HR30 photocell wiring and addressing.
After adding or removing a photocell or STOP device, run the recognition procedure again. Photocells provide supplementary protection; they do not replace correct mechanical installation, protection of all hazardous areas, or force measurement.
Initial start-up and learning
First check manual operation, drainage, mechanical stops, earthing and safety devices. The drive must be engaged for automatic operation. Carry out the learning procedure with the gate path clear and monitor the gate throughout its movement.
Motor selection on the MC824HR30
Set the motor selector before learning the positions: MFAB3024 – DIP 2 only to ON; all other DIP switches 1–12 to OFF. In the Oview service interface, this option is displayed as ME3024. In the illustration, the ON position is toward the switch numbers. The setting must match the motor, not the kit’s commercial designation.
BlueBUS and STOP device detection
After switching on, BlueBUS should flash once per second and FLASH should remain off. With the gate stationary, press and hold OPEN ▲ + STOP/SET for approximately 3 seconds; release when L1/L2 flash rapidly. Wait for completion: the STOP LED stays on and L1/L2 switch off. Detection must also be carried out with no devices connected and after every change to the configuration.
Automatic limit-position learning
- Check the selector setting, M1/M2 and ENC1/ENC2 assignments, and both mechanical stops.
- Press and hold CLOSE ▼ + STOP/SET for approximately 5 seconds; release the buttons when L3/L4 flash rapidly.
- For a two-leaf gate, the sequence is: slow closing of M1, slow closing of M2, slow opening of M2 and M1 with a controlled delay, then fast closing of both. A single-leaf configuration uses M2 only.
- When complete, L3/L4 switch off. Test opening, closing, deceleration and the correct sequence of the leaves.
If the direction or sequence is incorrect, stop the movement immediately using the OPEN or CLOSE button. After disconnecting both the mains and the battery, if the leaf assignments are swapped, change the M1/M2 assignments together with the corresponding ENC; if the direction is reversed, correct only the motor pair. Do not use the protective earth conductor or encoder to change the direction. Repeat the learning procedure afterwards.
Activation of a photocell or STOP interrupts learning and L1 starts flashing. Fix the cause and start again. Manual adjustment, SA/SC positions and mixed learning are described in the control unit manual; mixed learning follows the previous automatic learning procedure.
Testing and handing over the gate
Test every control in use, photocells, STOP and safety edges in their operating positions, the strength of the stops, manual release and the forces across the entire gate. Force or speed settings must not mask mechanical resistance. Use the automation only after a successful test; hand over the keys and maintenance schedule.
Control unit settings, controls and servicing
| What you need | Procedure and requirements |
|---|---|
| Automatic closing | Enabling the function and safety requirements |
| Pause time | Time between opening and automatic closing |
| Motor speed | The speed must be suitable for the safety of the entire gate |
| Motor force | Remove any mechanical resistance first |
| Partial opening | M2 leaf only, or both leaves, depending on the setting |
| Transmitters and antenna | Pairing with the receiver actually installed |
| Backup power supply | PSS324 or older PS324 with the correct adapter and settings |
| Fault indicators and reset | Find the cause first; resetting the control board and deleting the radio memory are separate operations |
For detailed ranges, LEDs and factory settings, see MC824HR30 programming. For an older control board, use its own procedure. Repeat the safety test after changing the force, speed or stops.
Manual release and returning to operation
Release the gate only when it is stationary. Switch off the power and secure the leaf to prevent it from moving on its own. The release mechanism must remain accessible from the required side, including during a power outage.
| Mechanism | Procedure |
|---|---|
| MEA2 – key | Remove the lock cover, insert the key and turn it 90° clockwise. The leaf can now be moved by hand. To re-engage the lock, turn the key 90° counterclockwise. |
| MEA3 – lever | Insert the lever into the star-shaped opening and turn it to release the coupling as shown. Then move the leaf by hand. Return the mechanism to the locked position before using the automation. |
After locking, check that the operator is connected to the leaf, then remove the key or lever. Restore the power and, while supervising the gate, run it through a complete cycle. If there is a fault, leave the gate safely in manual mode and arrange for servicing.
If the operator is not working correctly
| Symptom | What to check |
|---|---|
| The leaf is difficult to move even when released | Hinges, alignment of the box and leaf, deformation, dirt and stops. Remove the mechanical cause first. |
| Water in the box | Disconnect the power. Clean and check the drainage as described in the maintenance instructions. Have damaged electrical components inspected before using the system again. |
| The motor runs, but the leaf does not move | Re-engage the release mechanism and check the connection between the mechanical levers and the leaf. |
| Incorrect direction or sequence | Motor wiring and correct encoder assignment, then repeat position learning. |
| L3/L4 are flashing or the positions are incorrect | Correct DIP setting for the motor, both mechanical stops and completion of the learning procedure. |
| The motor does not start or stops | Power supply, fuses, STOP, photocells and the number of control unit flashes. Do not bypass safety devices. |
| Only the transmitter is not working | The battery, coding compatibility, antenna, and button storage in the correct receiver. |
For support, have the motor and control unit markings, photocell and receiver types, LED status, number of flashes, and the step at which the problem occurs ready. Contact us.
Maintenance and safe use
Carry out inspection and maintenance at least every six months, more frequently in demanding conditions, as specified in the maintenance schedule. Disconnect the mains and battery before maintenance and secure the gate leaf against movement.
- Clean the box and drainage, and check that water drains freely and the cable conduit is in good condition.
- Check the hinges, mechanical arms, motor and stop fixings; lubricate contact points as specified in the installation procedure.
- Test manual release and re-engagement.
- Repeat the manual movement over the full travel, test each safety device, and measure the forces with a suitable instrument.
- Record inspections and repairs in the maintenance schedule. Do not use a damaged assembly.
Keep the photocells clean, keep controls out of children's reach, and do not enter the gate leaf's path while it is moving. If you notice unusual noise, increased resistance, or a fault, switch off the automation and arrange for repairs.
Technical specifications and dimensions
| Parameter | MFAB3024 |
|---|---|
| Motor and sensing | 24 V DC, magnetic encoder; no built-in control unit |
| Current draw | 5 A |
| Power consumption | 120 W |
| Speed | 1.4 rpm |
| Torque | 250 Nm |
| Operation | 76 cycles/h at 90°; 38 cycles/h at 180°; duty cycle 80% |
| Standard opening angle | Up to 110°; a wider angle with MEA1 is only suitable for leaves up to 2.5 m |
| Ingress protection and temperature | IP67; −20 to +50 °C |
| Motor weight | 11 kg; the box and additional equipment are assessed separately |
| Power cable | 2 m |
| Installation dimensions in the box | Footprint: 390 × 322 mm; box height: 147.5 mm, with a 47 mm protruding section, as shown in the drawing. Exact installation depends on the box supplied |
| Box | MFABBOX or MFABBOXI |
Determine the dimensions of the foundation pit and the installation height of the gate leaf based on the box supplied, drainage, and site conditions. The dimensional drawing does not replace checking the alignment of the hinges and box.
Product view
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]