Installing the foundation box for an underground drive

The foundation boxes for underground operators can be installed in the following orientations:

  • the conventional way, facing the driveway,
  • or from the inside, facing into the property. This allows for a zero visual gap between the post and the gate, since the leaves are aligned flush.

There are several ways to install them:

  • Installed in a hole cut into the concrete – the standard procedure described in the manual
  • Installed on a plate welded (fixed) to the post.
  • Installed on a fresh site

With all methods, make sure the water drains properly so rainwater does not collect in the box. The finished installation should pass the so-called bucket test: pour a bucket of water into the installed box; it should drain away within a minute.

Installed on a fresh site

This procedure is for guidance only; every installation is unique.

  1. Dig a hole below the frost line (depending on the location, from 60 cm to 1 metre).
  2. Pour a concrete base.
  3. Place formwork blocks on the base; use enough to suit the required depth.
  4. Tie the formwork blocks together and fill them with concrete; you can also integrate the gate post.
  5. Fix the box to the cured formwork blocks, shimming it if necessary. Make sure the box fits vertically at all and does not protrude.
  6. Backfill around the blocks with gravel to allow water to drain.
  7. Run a conduit (flexible corrugated conduit) from the first hole in the box into the gravel to drain water.
  8. Run a conduit with cables from the second hole in the box.
  9. Pour concrete around the operator and finish with paving, etc.
  10. Install and secure the operator.
  11. Attach the gate to the box linkage using screws or a weld.
  12. Install the gate leaf.
  13. And you’re done.

Example: The operator has a box height of 8.1 cm, so I dig a 65 cm-deep hole, pour a 5 cm concrete base, and stack two 25 cm-high formwork blocks, giving me 5 cm + 25 cm + 25 cm = 55 cm. That leaves 10 cm of space at the top. The box is 8.1 cm high, so I have 1.9 cm of clearance and can shim the box.