NICE Run RUN2500I - standalone drive for sliding gates
| Product availability: | In stock | We normally dispatch goods within 24 hours. |
|---|
in stock
€854.94 including VAT
| Weight |
|---|
| 25 kg |
Description of NICE Run RUN2500I - standalone drive for sliding gates
NICE RUN2500I is non-reversible an electromechanical sliding gate operator for gates weighing up to 2,500 kg, with a gate leaf up to 18 m long. It has an electromechanical limit switch, RUA2 control RUA2 and an inverter RUA3. A single-phase supply 230 V AC powers a three-phase motor via the inverter. The I designation means inverter; it is not the inductive limit switch used in version P.
It is suitable for intensive operation of heavier gates, provided their mechanical resistance and number of cycles are within the limits. The inverter controls the speed within the range 0.06–0.25 m/s and, with deceleration enabled, maintains the available force even at approximately 0.05 m/s. This reduces the risk of a heavy gate leaf stopping at the end of its travel. Set the speed and sensitivity to suit the gate, then verify that the safety forces are within the required limits.
This is a standalone operator for one sliding gate leaf. In the event of a power failure, it can be released with a key. Choose the receiver, transmitter and safety accessories to suit the required configuration; see the kit overview.
| Quick navigation | |
|---|---|
| Selection and limits | Accessories |
| Kits | Installation |
| Wiring | Photocells |
| Initial start-up | Programming |
| Diagnostics | Maintenance |
| Release | Specifications |
| PDF manual |
Compatible accessories
| What | Why | Type |
|---|---|---|
| Warning lights | Alerts you when the gate is moving. Choose the FLASH light and antenna versions to match the receiver frequency. FLASH wiring. | |
| Photocells | Protect the passage according to their assigned address; BlueBUS uses two non-polarized wires. Wiring and addresses. | |
| Wireless photocells | EPMOW units require the IBW interface. FT210B has a battery-powered transmitter and a receiver connected to BlueBUS; it can also transmit the signal from a moving safety edge. | |
| Radio receivers | Install the plug-in SM receiver with the power disconnected. The transmitter's coding and frequency must be compatible with the selected receiver. | |
| Transmitters | Gate control; the ON3ELR long-range transmitter requires an LR receiver. Two-way functions require a compatible receiver. Pairing. | |
| Antenna | For improved range. Connect the coaxial cable to the antenna input; the frequency must be compatible with the receiver. | |
| Key switches / keypads / readers | Dry contacts on the key switch control P.P./OPEN/CLOSE. BlueBUS keypads and readers are enrolled as devices; radio versions are paired with the receiver. | |
| Wi-Fi / GSM control | BiDi-ZWave requires a compatible Opera interface and Z-Wave system. The universal Wi-Fi/GSM module controls P.P. via an isolated COM–NO contact; select the power supply separately according to voltage and current draw limit. | |
| Rack gears | Module 4; choose the material, fastening method and load capacity based on the entire gate leaf. A nylon rack is not automatically suitable for every heavy gate. Rack installation. | |
| Programming via mobile phone | BiDi-WiFi is primarily used for programming and diagnostics via the My Nice Pro app. Check the Bus-T4 interface on the specific RUA2 and make the corresponding connection according to the module instructions. Gate control and network setup options depend on its configuration. | |
| Power outage | RUN2500I requires a 230 V AC mains supply. Neither the PS124 backup battery nor the Solemyo solar kit for 24 V operators can be connected to this motor. Without a suitable power supply, use manual release. |
|
With an existing installation, older components may remain functional LUCYB, MLBT, ELB, MOFB, MOSE, MOTXR, SMXI. When replacing a component, check the voltage, interface and coding; compatibility with the old component does not mean it is still in production. Choose new equipment from the compatible alternatives listed above.
Kits and standalone operator
The kits differ in their included equipment, not in the motor's limits. Each kit contains one operator; the rack length must be suited to the gate's full travel.
| Kit with photocells and warning light | Standalone operator | Kit with rack |
|---|---|---|
| NICE RUN2500I – kit D Operator, receiver OXIBD, transmitter MYGO4, a pair EPMB and a warning light ELDC. | NICE RUN2500I – standalone operator RUA2 control unit and RUA3 inverter in the operator. Select the receiver, transmitter, photocells, warning light and rack separately. | NICE RUN2500I – F kit Operator, receiver OXIBD, transmitter MYGO4, a pair EPMB and a warning light ELDC. |
| Another option | Additional equipment for the operator |
|---|---|
| Kit B | OXIBD + MYGO4 |
| Kit C | OXIBD + MYGO4 + a pair of EPMB |
| Kit E | Equipment C + 4 m LZ-1 |
For a kit with 4 m of rack and a longer gate, purchase the required additional length; also check that the rack is suitable for the gate's weight and operating intensity. The contents of each kit are listed on its product page.
Choosing an operator and operating limits
What matters is the weight and length of the entire moving gate leaf, including its infill and counterweight, not just the clear opening width. The gate must move smoothly along its entire travel, be correctly guided and have secure mechanical stops. Measure the resistance at start-up and while moving, and allow for conditions to worsen in winter.
| Parameter | Limit for one operator |
|---|---|
| Gate leaf weight | 2 500 kg |
| Gate leaf length | 18 m |
| Limit switch | Electromechanical – brackets on the rack operate the lever |
The available starting force is up to 1 660 N, and the rated force is 700 N. When assessing the mechanics, use a safety margin of at least 50%: the force required to start moving should be less than 830 N, and the force required to maintain movement should be less than 350 N. These are not permissible impact forces on a person; those must be verified in a separate safety test.
Number of cycles by gate leaf length and weight
One cycle is a complete opening and closing. For cycles per hour and consecutive cycles, multiply the figure in the row for the gate leaf length by the weight factor. Round down for planning purposes. Temperature and mechanical resistance may further reduce the result.
| Gate leaf length | Max. cycles/hour | Max. consecutive cycles |
|---|---|---|
| Up to 6 m | 42 | 42 |
| Over 6 up to 9 m | 28 | 28 |
| Over 9 up to 12 m | 21 | 21 |
| Over 12 up to 15 m | 17 | 17 |
| Over 15 up to 18 m | 14 | 14 |
| Gate leaf weight | Available cycle factor |
|---|---|
| Up to 500 kg | 100 % |
| Over 500 up to 900 kg | 80 % |
| Over 900 up to 1 200 kg | 75 % |
| Over 1 200 up to 1 500 kg | 60 % |
| Over 1 500 up to 1 800 kg | 50 % |
| Over 1 800 and under 2 000 kg | No factor is specified; confirm the operating schedule with technical support. |
| 2 000–2 300 kg | 40 % |
| Over 2 300 up to 2 500 kg | 30 % |
Example: 10 m / 2 100 kg gate leaf → 21 × 0.40 = 8.4. For planning, allow for no more than 8 cycles/hour and 8 consecutive cycles, before applying further restrictions. The inverter operator's rated test figure is 28 cycles/hour at 10 m; for a specific gate, the stricter limit based on its length and weight must also be observed. The catalogue figure of 56 cycles/hour is not a general operating limit for every gate.
Estimated service life
Add the weight, length and other relevant influence indices. Include other factors if they are likely to occur more than 10% of the time. The graph shows the estimated number of cycles with regular maintenance; it is not a guarantee or a number of years. The horizontal axis shows the sum of the indices in %, and the vertical axis shows the number of cycles.
If the total exceeds 100%, the conditions are beyond acceptable limits. Choose the operator based on the entire gate and its operating conditions; meeting the weight limit alone does not guarantee suitability.
If you need help checking your selection, contact us with the gate length and weight, and the estimated number of operating cycles.
Installing a sliding gate and operator
Before installation, disengage the operator and check that the gate moves smoothly by hand, is guided securely, is protected against lifting off its track, and has solid stops at both end positions. The gate must not move on its own. Protect the operator from flooding; the base must be solid and allow safe manual release.
- Prepare cable conduits and a foundation plate with four anchors. Leave no more than 40 mm.
- Level the plate according to the original drawing, parallel to the gate leaf. Allow the concrete to cure completely.
- Secure the motor with nuts and washers, adjust its position relative to the rack, then tighten the fasteners securely.
- Secure the cables against being pulled out and from contacting moving parts. Refit all cable-entry and cover seals.
Rack and pinion clearance
Use a compatible module 4; choose the material and load capacity to suit the gate. The weight of the gate leaf must not rest on the pinion. Maintain a 1–2 mm clearance along the entire travel.
Align the rack sections with the pinion; lateral deviation during manual movement must not exceed 5 mm. Check that the joints are smooth and every section is securely fastened. Do not use a more powerful motor to compensate for a poorly installed rack.
Electromechanical limit switches
- Move the gate leaf by hand to the open position, at least 2–3 cm before the fixed stop.
- Slide the bracket along the rack in the opening direction until it activates the limit switch. Move it further in the same direction by at least 2 cm and secure it.
- Set the bracket for the closed position in the same way.
- After engaging the operator and programming the travel, check that the gate stops before both fixed stops. Limit-switch brackets do not replace mechanical stops.
Wiring
| Connection | Cross-section / type | Max. length |
|---|---|---|
| 230 V mains | 3 × 1.5 mm² | 30 m |
| FLASH | 2 × 0.5 mm² | 20 m |
| Antenna | RG58 coaxial cable | 20 m; under 5 m recommended |
| BlueBUS | 2 × 0.5 mm² | 30 m |
| Key switch | 2 cables, 2 × 0.5 mm² or 4 × 0.5 mm² | 50 m |
| Connecting the safety edge | 2 × 0.5 mm² | 30 m; flexible cable or FT210B recommended |
For a mains cable run longer than 30 m, use a larger cross-section, such as 3 × 2.5 mm², and suitable protective earthing. BlueBUS runs over 30 m and up to 50 m require 2 × 1 mm² cable. Select cable cross-sections and protection according to the route, environment and voltage drop; signal cables are not a substitute for mains wiring.
Electrical wiring and RUA2 control unit
Disconnect the mains supply and verify that the circuit is de-energised before opening the unit or changing terminal connections. The mains supply, motor and accessory outputs have different functions and voltages.
230 V AC supply
| Terminal | Connection |
|---|---|
| L | Live wire |
| N | Neutral wire |
| PE / earth symbol | Protective green-and-yellow wire; Class I operators must be earthed |
Route the mains cable through the separate, smaller cable gland. Secure accessory wires in the larger cable gland; leave approximately 20–30 cm of slack inside. The membranes must fit tightly around the cables, and the wiring must not obstruct the cover.
Terminal layout and functions
| Terminal | Purpose, voltage and polarity |
|---|---|
| FLASH | Output for a flashing warning light; load rating depends on the wiring: 12 V / 21 W per bulb, up to two bulbs. ELDC or WLT connect according to their instructions; this is not a continuous power supply. For a polarity-sensitive warning light, follow the markings on its terminals and the FLASH output. The +/− order for the 24 V auxiliary supply does not apply to FLASH. |
| S.C.A. | 24 V DC indicator output, max. 4 W, tolerance −30% / +50%. Function according to II/L4. For polarized devices, check the actual output marking; the auxiliary supply’s +/− must not be connected here. |
| BLUEBUS | Power and communication for compatible devices, in parallel over two wires non-polarized. Limit: 15 BlueBUS load units, not 15 pairs of photocells. |
| STOP | Potential-free NO, NC, or 8.2 kΩ resistive devices. The controller interprets a change from the learned state as a stop followed by a brief reverse movement. No power supply +/−. |
| P.P. / STEP-BY-STEP | Potential-free NO contact for step-by-step control. Connect the accessory relay’s COM–NO terminals to both P.P. terminals; non-polarized. The module’s power supply is a separate pair. |
| OPEN | Potential-free NO contact for opening; non-polarized. |
| CLOSE | Potential-free NO contact for closing; with I/L7 ON, it triggers partial opening. Non-polarized. |
| ANTENNA / AERIAL | Connect the coaxial cable’s center conductor and shield according to the antenna input markings. These are not power supply +/− terminals; select the correct frequency. |
Auxiliary power supply – correct polarity
Power can be drawn for an external module 24 V DC, −30% / +50%, maximum 100 mA total. The module must tolerate a range of approximately 16.8–36 V. The positions below apply when the STOP and P.P. connectors are oriented the same way as in the original image.
| Power / command | RUA2 terminal | Module connection |
|---|---|---|
| Minus − | Right STOP terminal | − / GND |
| Plus + | Left P.P. terminal | + / V+ |
| Step-by-step command | Both P.P. terminals | Isolated potential-free COM–NO contact |
For higher current draw, an unsuitable voltage range, or current spikes, use a separate power supply. Connect only an isolated potential-free command to P.P. Do not use BlueBUS or FLASH as an auxiliary power supply.
EKS key switch
For EKS use one pair C–NO for both OPEN terminals and the second pair C–NO for both CLOSE terminals. Do not use NC for these commands. For control with a single step-by-step contact, connect C–NO to both P.P. terminals. These are potential-free, non-polarized contacts; do not apply 230 V or external 24 V to the command inputs.
Safety edges and STOP
Connect NO contacts in parallel and NC contacts in series. Two 8.2 kΩ resistive devices can be connected in parallel; more devices require the specified cascade wiring with an end-of-line resistor. A combination of NO and NC uses the NC branch with an 8.2 kΩ resistor, as shown in the relevant wiring diagram. Repeat the learning procedure and safety test after every change; do not replace a safety edge with a simple jumper.
BlueBUS photocells and addressing
Current EPMB and other compatible BlueBUS photocells connect in parallel to the BLUEBUS pair, with no polarity. Both TX and RX in one pair must have the same jumper settings. The next pair must use a different supported address. After adding, removing, or changing the address, always repeat device learning.
| Address | Position and response |
|---|---|
| FOTO | Outer pair approximately 50 cm above ground; reverses movement while closing. |
| FOTO II | Outer pair approximately 100 cm above ground; reverses movement while closing. |
| FOTO 1 | Inner pair approximately 50 cm above ground; reverses movement while closing. |
| FOTO 1 II | Inner pair approximately 100 cm above ground; reverses movement while closing. |
| FOTO 2 | Outer pair for protection during opening. |
| FOTO 2 II | Inner pair for protection during opening. |
| FOTO 3 | One pair for protection during both opening and closing; position it so it does not interfere with the other pairs. |
For the specific jumper settings, see EPMB photocells – jumper settings table. Choose the protective function according to the actual gate’s hazardous areas; height alone does not determine safety. For EPMOW, the IBW interface. For FT210B the transmitter is battery-powered, and the receiver connects to BlueBUS.
Initial startup and learning
Check the fixings, stops, opening direction, and all terminals. Leave the gate leaf approximately halfway along its travel and lock the gearbox. After power-up, BLUEBUS should flash approximately once per second; the photocells must indicate normal status. If an error occurs, first disconnect the power and eliminate the cause.
Setting the opening direction
With the power disconnected, set the direction switch according to the drive position and the gate leaf’s direction of travel. In the same orientation as shown in the image: opening to the left = switch to the left; opening to the right = switch to the right. After power-up, check that the first movement during learning is opening.
Device and STOP input recognition
- Press and hold OPEN + STOP/SET for approximately 3 s.
- Release when L1 and L2 flash rapidly.
- Wait for the procedure to finish. L1/L2 will stop flashing to indicate the learning request, and the STOP LED must be lit. L3/L4 may continue to indicate that travel learning is required.
- After changing BlueBUS or STOP, repeat the procedure and test each safety device separately.
Travel learning
- After the devices have been successfully recognized, press and hold CLOSE + STOP/SET for approximately 3 s.
- Release at the start of movement. The first movement must be opening.
- If the gate closes, stop it with STOP, disconnect the power supply, and correct the direction setting. Then repeat the learning procedure.
- Allow a complete opening cycle to the limit switch, followed by a complete closing cycle. There must be no people or obstacles in the path.
- Check both end positions, partial opening, slowdown, and several complete cycles.
Testing and handover
Check opening and closing, stopping before the end stops, accessories, and protection at all hazardous points. Test photocells and safety edges individually in both directions, according to their function. If protection relies on force limitation, impact forces must be measured; repeat the test after changing the speed, force, sensitivity, or start-up behavior. The user must be given the keys and an explanation of manual release, safe operation, and maintenance.
Two drives – Master/Slave
For two opposing sliding gate leaves, each motor must have its own mains supply. Use two compatible drives and the correct control procedure; two motors do not increase the limit for a single gate leaf. The BlueBUS connection must follow the order 1 Master → 1 Slave and 2 Master → 2 Slave with the connectors oriented the same way, as shown in the original diagram in the installation PDF. Numbers 1/2 indicate positions, not power supply +/−.
- With the power disconnected, set the direction of both leaves and wire them according to the Master/Slave diagram.
- Connect the shared control devices and receiver to the Master. On the second drive, set I/L8 = ON.
- Run device recognition on the Slave first, then on the Master.
- Start gate travel learning on the Master and check the movement of both leaves and all safety devices.
FLASH, S.C.A., STOP, and P.P. can be connected separately to the Slave. P.P. on the Slave opens only its own leaf fully; OPEN/CLOSE are not used on the Slave. Assess the safety settings and diagnostics for the second drive as well.
Receiver and remote control
With the power disconnected, plug the receiver into its SM socket. The pairing and memory-clearing procedure depends on the receiver OXIBD, OXI or OXILR; use its button, LED confirmations, and NICE remote control pairing instructions. Gate travel learning is not transmitter pairing or radio memory clearing.
RUA2 programming
The OPEN ▲ and CLOSE ▼ buttons change the selection; STOP/SET stops and confirms settings. The control board has LEDs L1–L8. The gate must be stationary during setup. Record the original values before making changes; test the system after adjusting the safety settings.
Level I – ON/OFF
- Hold STOP/SET until L1 starts flashing, approximately 3 s; then release.
- Use OPEN/CLOSE to select the function LED.
- Press SET briefly to toggle the status: a short flash = OFF, a long flash = ON.
- To exit, wait 10 s without pressing any buttons. The changes are saved.
| LED – function and meaning | Status |
|---|---|
| L1 – Automatic closing ON: closes after opening once the pause set by II/L1 has elapsed; factory setting: 30 s. OFF: waits for a command. | OFF – factory setting ON – enabled |
| L2 – Close after photocell Closes 5 s after the photocell is cleared. With I/L1 OFF, the gate opens fully first; with I/L1 ON, opening stops when the photocell is cleared. A STOP command cancels the function for the current movement. | OFF – factory setting ON – enabled |
| L3 – Always close After power is restored, closes the open gate; 5 s warning before movement. When OFF, the gate remains stationary. | OFF – factory setting ON – enabled |
| L4 – Slowdown At the end of travel, approximately 0.05 m/s regardless of the main speed, while maintaining the available force of the inverter drive. When OFF, there is no slowdown. | OFF – factory setting ON – enabled |
| L5 – Peak force ON disables the gradual start and applies peak force. This does not replace correcting excessive friction; measure the safety forces after making a change. | OFF – factory setting ON – enabled |
| L6 – Pre-flashing ON: warning light flashes for 3 s before movement. OFF: the warning light starts flashing when movement begins. | OFF – factory setting ON – enabled |
| L7 – CLOSE = partial opening ON changes both the terminal and radio CLOSE command to partial opening, according to II/L6. OFF retains the closing function. | OFF – factory setting ON – enabled |
| L8 – Slave ON only on the slave drive in a Master/Slave. OFF is the Master setting. | OFF – factory setting ON – enabled |
Outside programming mode, the function LED is lit when ON and off when OFF. L1/L2 or L3/L4 flashing may indicate that learning is required; see LED diagnostics.
Level II – values
- Hold SET for approximately 3 s; release when L1 flashes.
- Use OPEN/CLOSE to select the parameter input LED.
- Press and hold SET again. After approximately 3 s, the LED for the current value lights up.
- While continuing to hold SET, use OPEN/CLOSE to select the value; then release SET.
- Set the next parameter in the same way; to save and exit, wait 10 s without pressing any buttons.
| Input LED – name and description | Setting LED – value |
|---|---|
| L1 – Pause duration Applies when I/L1 is enabled. | L1 – 5 s L2 – 15 s L3 – 30 s (factory setting) L4 – 45 s L5 – 60 s L6 – 80 s L7 – 120 s L8 – 180 s |
| L2 – Step-by-step mode Sequence for P.P. and the corresponding radio command. | L1 – Open → stop → close → stop L2 – Open → stop → close → open (factory setting) L3 – Open → close → open → close L4 – Shared access: ignores the next command while opening; reopens while closing L5 – Shared access 2: same as L4; a command lasting longer than 2 s stops the gate L6 – Step-by-step 2: a command shorter than 2 s partially opens the gate L7 – Hold-to-run: movement continues while the command is held L8 – Semi-automatic opening; closing while the command is held |
| L3 – Motor speed After changing the setting, check stopping, deceleration and safe force limits. Select speeds according to the gate; the maximum no-load speed is not a guaranteed speed under load. | L1 – 0.06 m/s (3.6 m/min) L2 – 0.09 m/s (5.4 m/min) L3 – 0.13 m/s (7.8 m/min) L4 – 0.17 m/s (10.2 m/min) (factory setting) L5 – 0.20 m/s (12 m/min) L6 – 0.25 m/s (15 m/min) L7 – Opening 0.17 m/s, closing 0.09 m/s L8 – Opening 0.25 m/s, closing 0.17 m/s |
| L4 – S.C.A. output Output function 24 V DC / max. 4 W. Radio outputs depend on the receiver. | L1 – Open gate indicator: off when closed, on when open; flashes slowly while opening and quickly while closing (factory setting) L2 – Active when the gate is closed L3 – Active when the gate is open L4 – Radio output 2 L5 – Radio output 3 L6 – Radio output 4 L7 – Maintenance indicator L8 – Electric lock |
| L5 – Obstacle sensitivity Higher sensitivity responds to less resistance. L8 disables obstacle detection; do not use it as a routine solution to sticking or as a substitute for safety protection. | L1 – Extremely high sensitivity L2 – Very high L3 – High L4 – Medium L5 – Medium-low (factory setting) L6 – Low L7 – Very low – heavy gates L8 – Obstacle detection disabled |
| L6 – Partial opening The pedestrian opening must be shorter than the learned total travel distance. | L1 – 0.5 m L2 – 1.0 m (factory setting) L3 – 1.5 m L4 – 2.0 m L5 – 2.5 m L6 – 3.0 m L7 – 3.4 m L8 – 4.0 m |
| L7 – Maintenance reminder Number of operations between maintenance intervals. Opening and closing count as two operations; one complete cycle consists of both. | L1 – Automatically based on operating difficulty (factory setting) L2 – 2,000 operations L3 – 4,000 operations L4 – 7,000 operations L5 – 10,000 operations L6 – 15,000 operations L7 – 20,000 operations L8 – 30,000 operations |
| L8 – Error history Readout of the last eight operations; this is not a configurable default setting. | L1 – Most recent operation L2 – Second most recent operation L3 – Third most recent operation L4 – Fourth most recent operation L5 – Fifth most recent operation L6 – Sixth most recent operation L7 – Seventh most recent operation L8 – Eighth most recent operation |
Timer and permanently open gate
A potential-free P.P. command lasting longer than 2 s opens the gate and keeps it open for as long as the command is active, for example when triggered by a time switch. The exception is mode II/L2, value L5 “Shared access 2”. If a continuous command is unexpected, check the timer or module relay.
Diagnostics and troubleshooting
FLASH may indicate an error using two identical series of flashes, separated by a pause of approximately 1 s. The number of flashes is unrelated to the value LED in programming mode.
| Flashes | Cause and next step |
|---|---|
| 1 + 1 | BlueBUS does not match the learned devices. Check the cables, addresses and photocell status; after fixing the issue, repeat the learning procedure. |
| 2 + 2 | Photocell triggered. Clear the beam, clean the optics, and check alignment and the address in the function table. |
| 3 + 3 | Obstacle detected or excessive resistance. First, check the mechanism, then the setting II/L5 and safe force limits. |
| 4 + 4 | STOP triggered. Check the edge, contacts and status of the learned input; STOP wiring. |
| 5 + 5 | Internal parameter error. Wait at least 30 s and try a command; if the issue recurs, contact service. |
| 6 + 6 | Permitted number of operations exceeded. Allow the operator to cool down and adjust operation according to cycles and load. |
| 7 + 7 | Fault in internal electrical circuits. Disconnect all power sources, then restore power after a short while; if the issue recurs, contact service. |
| 8 + 8 | A continuous command blocks further commands. Check the button, timer and relays connected to the inputs. |
Board LEDs
| Indicator | Meaning / check |
|---|---|
| BLUEBUS – off | No power or a fault; check the supply and fuses with the power disconnected. |
| BLUEBUS – regularly flashes once per second | Normal operation. When an input changes, it may briefly flash twice. |
| STOP – on | The learned STOP input is in its normal state. Off = intervention or a different status. |
| P.P. / OPEN / CLOSE – lit | An active command on the corresponding input. If no command is being sent, check for a stuck button or relay. |
| L1 and L2 flashing | Request for device setup. |
| L3 and L4 flashing | Request for travel learning. |
How to read the history
- Enter Level II: press SET for about 3 s, then release when L1 lights up.
- Select input LED L8. Hold SET for about 3 s until the manoeuvre LED appears.
- While holding SET, use OPEN/CLOSE to select the last manoeuvres, L1–L8. The number of flashes corresponds to the error in the table above.
- Release SET and wait 10 s.
If a safety device is not working
Have the faulty safety device repaired as soon as possible. Temporary movement is possible only under direct supervision and with the travel path safely clear: after a command is rejected, issue it again within 3 s and keep holding it. After about 2 s, the gate will move while you hold the command; releasing it stops the gate. This is not automatic operation or a substitute for repair. Do not bridge safety inputs for permanent use.
Maintenance and service counter
Carry out maintenance at least every 6 months or 20,000 manoeuvres since the last maintenance, whichever comes first. Opening and closing count as two manoeuvres. Inspect more frequently in harsh environments.
- Disconnect all power sources, including any backup supply.
- Check that fixings are secure and inspect the wheel, rack and gate guide for corrosion and wear; remove dirt from the track and photocell optics.
- After restoring power, repeat the checks for limit positions, photocells, safety edges and safe operating forces.
- After servicing, record the maintenance and reset the service counter.
| Counter status | Maintenance indicator |
|---|---|
| Below 80% of the set limit | FLASH operates normally; the maintenance output stays on for 2 s at the start of opening. |
| 81–100% | FLASH stays on for 2 s at the start; the maintenance indicator flashes while the gate is moving. |
| Above 100% | FLASH stays on for 2 s at both the start and end; the maintenance indicator flashes continuously. |
Reading and resetting the service counter
Set the limit using II/L7. To read the counter, enter by holding SET for about 3 s, select L7, then hold SET for a further 3 s. With SET still held, briefly press OPEN/CLOSE and count the flashes: one flash represents 10% of the set limit. Then release SET.
Reset after maintenance: with L7 selected and SET still held, press OPEN + CLOSE together for at least 5 s. Release the buttons after the rapid flashes confirm the reset. Wait 10 s for the process to finish. This is a maintenance counter only; it does not delete transmitters or replace device or travel learning.
Relearning and receiver memory
After changing the wiring, repeat the relevant learning. Clear the radio memory according to the specific receiver. Do not use the service-counter reset procedure as a universal control-unit reset.
Manual release
Release the gate only when it is stationary. Disconnect the power supply and secure the gate leaf against unintended movement. When releasing the gate, you must support its full weight.
- Slide the lock cover open.
- Insert the key and turn it clockwise.
- Pull out the release handle and move the gate by hand.
- To re-engage the drive, reverse the procedure. Before operating electrically, check that the gearbox has re-engaged.
NICE RUN2500I technical specifications
| Parameter | Value |
|---|---|
| Application | One sliding gate leaf |
| Control unit | RUA2 + RUA3 inverter |
| Mains power supply | 230 V AC / 50–60 Hz; refer to the label on the specific drive |
| Motor | Three-phase motor powered by an inverter |
| Max. gate leaf weight / length | 2 500 kg / 18 m |
| Limit switch | Electromechanical |
| Catalogue no-load speed | 0.26 m/s; setting L4 = 0.17 m/s, selectable range 0.06–0.25 m/s |
| Rated speed | 0.15 m/s at L4 |
| Max. force / torque | 1 660 N / 60 Nm |
| Rated force / torque | 700 N / 25 Nm |
| Rated power input / current | 450 W / 2.6 A |
| Peak power input / current | 650 W / 3.7 A |
| Catalogue duty cycles | 56 cycles/h |
| Operating cycle limit | According to the length and weight tables; the catalogue figure is not a universal limit. |
| Continuous operation at rated conditions | 45 min; at 50 °C, max. 20 min |
| Pinion | 18 teeth, module 4 |
| Auxiliary output | 24 V DC, −30% / +50%, max. 100 mA total |
| S.C.A. | 24 V DC, max. 4 W |
| BlueBUS | Max. 15 load units |
| Ingress protection / temperature | IP44 / −20 to +50 °C |
| Motor weight | 25 kg |
| Dimensions | 400 × 255 × 390 mm (catalog); see the drawing below for the mounting dimensions. |
Catalog values and values at peak or rated load describe different operating conditions; use the nameplate and peak load when designing the power supply. The dimensions on the original mounting drawing are in mm. The drawing retains the dimensions, including the position of the sprocket.
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]












