NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg

NEW


Product availability: within 7 days

We usually dispatch goods within 7 days.


NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg
NICE-MFAB3024HS
within 7 days
€309.17 excluding VAT
€380.28 including VAT

 pcs
Weight
11 kg

Description of NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg

NICE M-FAB MFAB3024HS is a standalone underground non-reversible operator with a 24 V DC motor and magnetic encoder for one gate leaf. It does not include a control unit; for a new setup, use NICE MC824HR30. For two leaves, you need two operators and one compatible control unit.

The operator is concealed beneath the hinge axis, so it does not affect the gate's appearance. It is also suitable where there is no room beside the gate leaf for a linear operator or articulated-arm operator. The box itself forms the lower support for the gate leaf. 24 V is the motor voltage; the MC824HR30 is powered from a 230 V AC mains supply.

The HighSpeed version is designed for faster opening. Opening to 90° takes approximately 8 seconds, excluding acceleration and deceleration. Speed does not replace safety checks; suitability depends on the length, weight and construction of the gate leaf.

Quick navigation
Controls and accessoriesOperator and box
Selection and limitsBox installation
StopsMotor wiring
Accessory terminalsInitial startup
Settings and controlsManual release
TroubleshootingMaintenance
Specifications and dimensionsPDF manual

Controls and compatible accessories

Both 24 V M-FAB operators use the MC824H control unit with encoder inputs. The MC824L is not a replacement for this operator. For an older MC824HR10, follow the procedure for the board actually installed; do not apply MC824HR30 settings to a different generation.

What Why Type
Control unit

Controls one or two operators. Wiring.

Flashing beacon

Motion warning signal. Power supply and permitted current draw are specified by the control unit; output specifications.

  • LED beacon with antenna ELDC
  • Multifunction light WLT

Other warning beacons select according to the voltage and maximum current draw of the FLASH output on the control unit actually installed.

Photocells

Protect the passage area according to the position and operating mode. Wiring and setup.

  • Wired BlueBUS - EPMB, EPLB, EPSB
  • BlueBUS with reflector - EPMORB
  • Wireless BlueBUS - EPMOW
  • Adjustable wired BlueBUS - F210B
  • BlueBUS with battery-powered transmitter – FT210B
  • Wired BlueBUS - EPMOB

Connect wired BlueBUS photocell pairs to BLUEBUS. EPMOW units require a radio interface NICE IBW connected to BlueBUS; they are not wired directly like EPMB units. For the FT210B, the transmitter on the gate leaf is battery-powered, while the receiver connects to BlueBUS with two wires. The FT210B also transmits the safety edge status. Relay photocells connect to contact inputs, not to BlueBUS.

Transmitter

Remote control. The coding type must match the installed receiver. ON3ELR is compatible with OXILR; ON3EBD with OXIBD. Pairing remote controls.

Receiver

Receiver for the control unit's SM connector. OXIBD and OXILR use different radio systems; choose transmitters to match the receiver.

Antenna

Improves remote-control reception. Connect the antenna to the installed receiver; with OXIBD, connect it directly to its antenna terminals.

  • Integrated into the warning light ELDC
  • External antenna ABFKIT
Keypad

Access by code. EDSWG must match the radio receiver; EDSB uses BlueBUS and requires device recognition afterward.

Key switch

Key operation via an NO volt-free contact connected to the step-by-step, open, or close input.

  • Surface-mounted, standard cylinder EKS
  • Surface-mounted, European cylinder EKSEU
  • Flush-mounted, standard cylinder EKSI
  • Flush-mounted, European cylinder EKSIEU
Electric locks

Recommended for securing gate leaves longer than 2.5 m; lock output.

Card readers

Access using a chip or card. ETPB connects to BlueBUS; run device recognition after installation.

  • ERA Transponder Reader ETPB
Backup power supply

Operation during a power outage. Choose the battery to match the control unit's generation and connector.

  • Older backup battery PS324

For MC824HR30 NICE PSS324. The older PS324 on the MC824HR30 requires Standby to be disabled (L4 = OFF) and the CABLA11 and the corresponding setting; backup wiring.

Motor, foundation box and manual release

Assembly partWhat you need
MFAB3024HS motorOne 24 V motor with a magnetic encoder, 2 m power cable, connecting arm and mechanical closing stop.
Foundation boxMFABBOX made of cataphoresis-treated steel or stainless steel MFABBOXI. The box includes an opening stop. Not included with the motor when purchased separately.
Manual releaseNICE MEA2 using a key or NICE MEA3 using a lever. The release mechanism must be accessible and correctly connected to the gate leaf.
Control and safetyMC824HR30, photocells, receiver, remotes and warning light, depending on the equipment fitted to the complete gate. These are not built into the motor.
Larger opening angleNICE MEA1 with chain drive; for gate leaves up to 2.5 m only, and with suitable external stops.

The box and motor can be used with either right- or left-hand gate leaves. NICE M-FAB follows the METRO range; when replacing components, check compatibility with the specific older box, connecting arm and release mechanism.

Kits for one or two gate leaves

The kits include the motor and the safety accessories listed below. The number of motors matches the number of gate leaves; two motors do not increase the limit for an individual gate leaf. When choosing, refer to the suitability chart.

One gate leafMotor onlyTwo gate leaves

Kit for one gate leaf

NICE M-Fab MFAB3024HS operator kit for a single-leaf gate up to 3m/300kg

1 motor, 1 MFABBOX box, 1 MEA3 release mechanism.

MC824HR30, OXIBD, 1 MYGO4 remote control, 1 pair of EPMB photocells and an ELDC flashing light.

MFAB3024HS motor only

NICE M-Fab MFAB3024HS – standalone underground operator for a swing gate leaf up to 3m/300kg

One 24 V DC motor. The box, release mechanism, control unit and safety equipment must be selected separately.

Kit for two gate leaves

NICE M-Fab MFAB3024HS operator kit for a double-leaf gate – each leaf up to 3m/300kg

2 motors, 2 MFABBOX boxes, 2 MEA3 release mechanisms.

MC824HR30, OXIBD, 1 MYGO4 remote control, 1 pair of EPMB photocells and an ELDC flashing light.

Gate length, weight and operation

The maximum length of 3 m and maximum weight of 300 kg do not apply at the same time. The chart allows a weight of 300 kg for a gate leaf up to approximately 1.5 m long. The permitted weight decreases for longer gate leaves. The complete combination must remain within the permitted area of the chart.

ParameterLimit and condition
Length of one gate leafMaximum 3 m; at this length, the permitted weight is reduced as shown in the chart.
Weight of one gate leafMaximum 300 kg; for a short gate leaf up to approximately 1.5 m long.
Operation80 cycles/h; motor rated duty cycle: 80%.

NICE MFAB3024HS: permitted weight by gate-leaf length

The horizontal axis of the chart shows the length of one gate leaf in metres; the vertical axis shows its weight in kilograms. The combination must remain within the blue area; do not use this operator outside it.

A solid gate leaf, a tall gate or strong winds may reduce the permitted load. Hinge resistance, gate-leaf design and the strength of its mounting also affect suitability. The gate leaf must move smoothly by hand throughout its full travel and must not move by itself when released.

Duty cycle 80% does not mean continuous operation without breaks. Actual operating intensity is affected by the opening angle, load, temperature and the acceleration and deceleration settings. A larger opening angle increases travel time and reduces the number of cycles available.

Installing the box and attaching the gate leaf

The foundation-box pin and all the gate-leaf hinges must share the same axis. The axis of rotation must not change as the gate moves. Misalignment puts strain on both the operator and the gate and cannot be corrected by increasing the force. Installing the underground operator foundation box.

  1. Check the gate leaf's load capacity and condition, the opening clearance, and access to the cover and release mechanism. If the gate leaf has a pedestrian gate, opening it must inhibit the automation.
  2. Prepare the foundation pit, cable conduit and an effective drainage pipe.
  3. Attach the opening-stop bracket to the box before pouring the concrete. Follow its orientation and dimensions as shown in the stop diagram.
  4. Set the box level in the concrete, with its pin positioned exactly below the axis of the upper hinge.
  5. Fit the control arm and ball onto the box pin. Weld the gate leaf securely to the release lever as shown; the gate leaf must remain safely supported by its hinges.
  6. Apply suitable lubricant to the contact points and grease the bearing through the grease nipple.
  7. Insert the motor in the correct position. Insert the closing-stop bracket into the appropriate hole and secure the motor with four self-locking nuts and the supplied washers.
  8. Connect the motor to the gate leaf using the connecting arm. Adjust both stops and check the full travel by hand.
  9. Route the cable through the conduit, outside the box. Any electrical junction box must be located outside the underground box.

M-FAB: shared axis of the box pin and gate hinges

Labels in the alignment diagram: 1 hinge, 2 box pin, 3 concrete foundation.

M-FAB: motor mounting, connecting and release levers, ball and pin

Labels in the motor-to-gate-leaf connection diagram: 1 release lever, 2 connecting lever, 3 ball, 4 control lever, 5 pin. Exact positioning depends on the actual box and its drawing.

The motor's metal housing has IP67 protection rating. The protection rating does not replace drainage or regular cleaning of the box; the box must not remain flooded. Electrical connectors must not be installed in the foundation box.

Mechanical stops and opening angle

In a standard configuration, the maximum opening angle is 110°. The closing stop is supplied with the motor, and the opening stop with the foundation box. Their position sets the end positions; these are not electrical limit switches.

With the accessory NICE MEA1 a greater angle of up to 360°, only with a gate leaf up to 2.5 m. The chain drive requires suitable external stops and assessment of the entire gate leaf travel. A greater angle cannot be achieved simply by changing the control unit programming.

M-FAB: adjustable mechanical opening and closing stops

Tighten the stop locknuts after adjustment. For a gate leaf longer than 2.5 m an electric lock is recommended NICE PLA10 or NICE PLA11; connect it to the ELS output.

Motor and magnetic encoder wiring

Disconnect the mains power and backup battery before wiring. The supplied motor cable is 2 m. If extending the cable, use a suitable junction box outside the box; joining wires inside the box is prohibited.

MFAB3024HS wiringConnection to MC824H
Motor pair24 V DC power supply to M1 or M2. The control unit reverses the supply polarity; it is not a permanently fixed +/−. Verify the wire functions against the markings on the supplied motor.
Encoder pairENC1 for motor M1 or ENC2 for motor M2. The encoder on the MC824H does not require polarity to be observed; never connect it to the motor power supply.
Yellow-green wireProtective earth (PE) wire; do not use it to power the motor or as an encoder wire.

For a single gate leaf, use M2 and ENC2, and leave M1 unused. For two gate leaves, M2 opens first and closes last, while M1 closes first. Each encoder must belong to the same motor as its motor wiring.

For the MC824HR30, the motor wiring including PE is 3 × 1.5 mm² and the encoder wiring is 2 × 1.0 mm²; both cables must be no longer than 10 m between the control unit and the motor. They can be replaced by a single 5 × 1.5 mm² cable. Cables must be suitable for the environment and protected from water. Complete MC824HR30 wiring.

MC824HR30: original wiring diagram for motors, encoders and accessories

MC824HR30 accessory terminals and power supply

ConnectionVoltage, polarity and limit
Auxiliary power supply+ is the left terminal of the SbS pair, − is the right terminal of the STOP pair, when viewed with the STOP and SBS labels readable, as shown in the figure. 24 V DC −30/+50%, maximum 200 mA total; power remains on in Standby.
BLUEBUSTwo wires for compatible EPMB and other devices. No polarity; this is not a universal 24 V output for arbitrary accessories.
FLASH12 V DC, maximum 21 W; for example, ELDC. Connect to the dedicated FLASH output, not to the STOP/SbS auxiliary power supply.
ELS12 V AC, maximum 15 VA for an electric lock; no +/− polarity. Select the output function according to the connected load.
OGIGate-open indicator: 24 V DC, maximum 4 W. The output function depends on the control unit settings.
SbS / OPEN / CLOSEControl voltage-free NO contact; do not apply external voltage to the command input. No +/− polarity applies to the contact.
STOPSafety contact, NO/NC, or 8.2 kΩ resistive edge, depending on the wiring and subsequent setup procedure. This is not a universal power supply pair.

MC824HR30: the right STOP terminal is negative; the left SbS terminal is positive

For the FLASH and OGI outputs, connect the load according to its markings and the control unit wiring diagram; do not confuse them with the STOP/SbS auxiliary pair. Calculate the total accessory current draw, as continuous power supply reduces battery life. Detailed auxiliary power supply.

Photocells and safety inputs

Connect compatible devices to BLUEBUS using two wires, with no polarity distinction. Each pair of photocells must have its own function address; the TX and RX jumpers for a pair must be set identically. Address FOTO 3 is not used in this swing-gate configuration. Locations, addresses and responses are covered in MC824HR30 photocell wiring and addressing.

After adding or removing a photocell or STOP device, run a new device recognition procedure. Photocells provide supplementary protection; they do not replace correct mechanical installation, protection of all hazardous areas, or force measurement.

Initial startup and learning

First check manual operation, drainage, mechanical stops, grounding, and safety devices. The drive must be locked for automatic operation. Carry out the learning procedure with the gate’s path clear, and monitor it throughout the entire movement.

Motor selection on the MC824HR30

Set the motor selector before learning the positions: MFAB3024HS – set only DIP 7 to ON; set all other DIP switches 1–12 to OFF. In the Oview service interface, this selection is shown as METROE. In the image, the ON position is toward the switch numbers. The setting must match the motor, not the kit’s sales designation.

MC824HR30: MFAB3024HS motor selection, DIP 7 ON and all others OFF

BlueBUS and STOP device recognition

After power-up, BlueBUS should flash once per second and FLASH should remain off. With the gate stationary, press and hold OPEN ▲ + STOP/SET for about 3 seconds; release when L1/L2 flash rapidly. Wait for the procedure to finish: the STOP LED lights up and L1/L2 go out. Run recognition even when no devices are connected, and after every change to the setup.

Automatic end-position learning

  1. Check the selector setting, M1/M2 and ENC1/ENC2 assignments, and both mechanical stops.
  2. Press and hold CLOSE ▼ + STOP/SET for about 5 seconds; release the buttons when L3/L4 flash rapidly.
  3. For a two-leaf setup, the sequence is: slow closing of M1, slow closing of M2, slow opening of M2 and M1 with a controlled delay, then fast closing of both. A single-leaf setup uses M2 only.
  4. When the procedure is complete, L3/L4 go out. Test opening, closing, deceleration, and the correct leaf sequence.

If the direction or sequence is incorrect, stop the movement immediately using the OPEN or CLOSE button. After disconnecting both the mains and the battery, if the leaves have been swapped, change the assignment of M1/M2 together with the corresponding ENC; if the direction is reversed, correct only the motor pair. Do not use the protective conductor or encoder to change the direction. Then repeat the learning procedure.

Activation of a photocell or STOP device interrupts learning and L1 starts flashing. Resolve the cause and start again. Manual fine-tuning, SA/SC positions, and mixed learning are described in the control unit manual; mixed learning follows the previous automatic learning procedure.

Testing and handing over the gate

Test every control in use, photocells, STOP devices, and safety edges in their operating positions; check the strength of the stops, manual release, and forces across the entire gate. Force or speed settings must not mask mechanical resistance. Use the automation only after it has passed testing; hand over the keys and maintenance schedule.

Control unit settings, transmitters, and servicing

What you needProcedure and requirements
Automatic closingEnabling the function and safety requirements
Pause timeTime between opening and automatic closing
Motor speedThe speed must be suitable for the safety of the entire gate
Motor forceFirst eliminate mechanical resistance
Partial openingM2 leaf only, or both leaves, depending on the selection
Transmitters and antennaPairing with the receiver actually installed
Backup power supplyPSS324 or the older PS324, with the correct adapter and settings
Fault indication and resetFirst identify the cause; resetting the control board and erasing the radio memory are different procedures

For detailed ranges, LEDs, and factory settings, see MC824HR30 programming. For an older control board, follow its own procedure. Repeat the safety test after changing the force, speed, or stops.

Manual release and returning to operation

Release the gate only when it is stationary. Switch off the power supply and secure the leaf against unintended movement. The release mechanism must remain accessible from the required side, even during a power failure.

MechanismProcedure
MEA2 – keyRemove the lock cover, insert the key, and turn it 90° clockwise. The leaf can now be moved manually. To re-engage the drive, turn the key 90° counterclockwise.
MEA3 – leverInsert the lever into the star-shaped opening and turn it to release the connection as shown. Then move the leaf manually. Before operating automatically, return the mechanism to the locked position.

M-FAB: release using the MEA2 key and MEA3 lever

After locking the mechanism, check the drive-to-leaf connection and remove the key or lever. Restore the power supply and carry out a full movement under supervision. If a fault occurs, leave the gate safely in manual mode and arrange servicing.

When the drive is not working properly

SymptomWhat to check
The leaf is difficult to move even when releasedHinges, the shared axis of the box and leaf, deformations, dirt, and stops. First eliminate the mechanical cause.
Water is standing in the boxDisconnect the power supply. Clean and check the drainage as described in maintenance. Have damaged electrical parts checked before using the system again.
The motor runs, but the leaf does not moveRe-engaging the release mechanism and the connection between the mechanical levers and the leaf.
Incorrect direction or sequenceMotor wiring and correct encoder assignment, then repeat position learning.
L3/L4 are flashing or the positions are incorrectCheck the DIP setting for the correct motor, both mechanical stops and completion of the learning process.
The motor does not start or stopsPower supply, fuses, STOP, photocells and the number of flashes on the control unit. Do not bypass safety devices.
Only the remote control is not workingThe battery, coding compatibility, antenna and button storage in the correct receiver.

For support, have the motor and control unit model, photocell and receiver types, LED status, number of flashes, and the step at which the problem occurs ready. Contact us.

Maintenance and safe use

Carry out inspections and maintenance at least every six months, more frequently in demanding conditions, as specified in the maintenance schedule. Before maintenance, disconnect both the mains supply and the battery, and secure the gate leaf to prevent it from moving.

  • Clean the box and drainage system, and check that water drains freely and that the cable conduit is in good condition.
  • Check the hinges, mechanical levers, motor mounting and stops; lubricate the contact points according to the installation procedure.
  • Test manual release and re-engagement.
  • Repeat the manual movement over the full travel, test each safety device, and measure the forces using a suitable measuring instrument.
  • Record inspections and repairs in the maintenance schedule. Do not use a damaged assembly.

Keep photocells clean, keep remote controls out of children's reach, and stay clear of the gate leaf's path while it is moving. In the event of unusual noise, increased resistance or a fault, switch off the automation and arrange for repairs.

Technical specifications and dimensions

ParameterMFAB3024HS
Motor and sensing24 V DC, magnetic encoder; no built-in control unit
Current draw6 A
Power consumption170 W
Speed2.6 rpm
Torque180 Nm
Operation80 cycles/h; duty cycle 80%
Standard opening angleUp to 110°; a larger angle with MEA1 is suitable only for gate leaves up to 2.5 m
Ingress protection and temperatureIP67; −20 to +50 °C
Motor weight11 kg; the box and additional equipment are considered separately
Power cable2 m
Dimensions of the installation in the boxFootprint: 390 × 322 mm; box height: 147.5 mm and protruding section: 47 mm, as shown in the drawing. The supplied box determines the exact installation dimensions
BoxMFABBOX or MFABBOXI

M-FAB: box and installation dimensions in millimetres

Determine the foundation pit dimensions and gate leaf installation height based on the supplied box, drainage and site conditions. The dimensioned drawing does not replace checking the alignment of the hinges and box.

Product view

How can I order this item?

Choose the option that suits you:

  1. order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
  2. order by email: place your order at [email protected]

Ask us anything about NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg

Product: NICE M-Fab MFAB3024HS - underground operator for a swing gate leaf up to 3 m/300 kg
Name:
Email:
Phone:
Message:
This page is protected by Google reCAPTCHA.