Description of NICE L-Fab LFAB4024 – standalone underground operator for a swing gate leaf up to 4 m/650 kg
NICE L-FAB LFAB4024 is a standalone underground non-reversible drive for one gate leaf. The motor has 24 V DC and a magnetic encoder. It does not include a control unit; for a new setup, use NICE MC824HR30. For a double-leaf gate, you need two motors and one compatible control unit.
The motor is concealed beneath the hinge axis and does not detract from the gate's appearance. An underground solution is also suitable where there is no room for a linear drive or articulated-arm drive. The foundation box and leaf fixing form the bottom support for the gate leaf. Secure installation, hinge alignment and effective water drainage are essential.
24 V is the motor voltage; the MC824HR30 is powered by 230 V AC mains. The LFAB4024 is suitable for more frequent use and supports a compatible backup battery. Motor voltage alone does not determine safety or suitability for a particular gate.
Control units and compatible accessories
Choose the equipment to match the installed control unit. For an older control board, follow its own wiring diagram and settings; a newer diagram is not a universal guide for all generations.
| What | Why | Type |
|---|---|---|
| Control unit | Controls one or two motors. Motor wiring. |
|
| Warning light | Indicates gate movement. The voltage and maximum current draw must match the FLASH output. |
Other warning lights should be selected to match the voltage and current draw of the specific control unit's FLASH output. |
| Photocells | Passage protection depends on the photocell placement and operating mode; wiring. |
EPMOW requires a radio interface IBW connected to BlueBUS. FT210B has a battery-powered transmitter on the gate leaf and a receiver connected to BlueBUS by two wires; it also transmits the safety edge status. |
| Safety edge | A safety edge is required to limit impact forces. The positioning and function of the protective devices must be checked across the entire gate. |
|
| Transmitter | Remote control compatible with the coding of the installed receiver. ON3ELR uses OXILR; ON3EBD uses OXIBD. Pairing the remote control. |
|
| Receiver | Plug-in radio receiver for the control unit's SM connector. The receiver and transmitter must use the same coding. OXILR and OXIBD use different radio systems. |
|
| Antenna | Improves remote-control reception. With OXIBD, connect the antenna to its antenna terminals. |
|
| Keypad | Access using a code. Choose EDSWG according to the receiver; EDSB uses BlueBUS and device learning. |
|
| Key switch | Key-operated control via a volt-free NO contact connected to the control unit's command input. |
|
| Electric locks | Additional gate leaf locking. The control unit releases the lock before opening. Selection depends on the length, rigidity and load of the gate leaf; lock output. |
|
| Card readers | Access using a chip or card. Connect ETPB to BlueBUS; run device learning after connection. |
|
| Backup power supply | Operation during a power outage. Choose a battery compatible with the control board and control unit connector. |
For the current MC824HR30 PSS324. The older PS324 requires CABLA11 and Standby switched off (L4 = OFF); backup connection. |
Motor, foundation box and manual release
| Assembly component | What you need |
|---|---|
| Standalone LFAB4024 | One motor, a 2 m power cable and a mechanical closing stop. The magnetic encoder detects motor movement. |
| Foundation box | LFABBOX4 made of cataphoresis-treated steel or stainless steel LFABBOX4I. They use the same mounting method; the box includes a gate-leaf lever and a mechanical opening stop. Sold separately. |
| Manual release | NICE BMA3 with a lever key, required to move the gate leaf manually during a power failure. Sold separately. |
| Control and safety | NICE MC824HR30, receiver, remote controls, photocells and safety equipment according to the specific gate. Not built into the standalone motor. |
| Wider opening angle | NICE BMA1 with chain drive, up to 360° for gate leaves up to 3.5 m. Requires suitable clearance and external mechanical stops. |
The motor and box can be used with either right- or left-hand gate leaves. LFABBOX4 and LFABBOX4I differ in material and surface finish; even a stainless-steel box does not replace drainage. When replacing, check the actual box, levers and manual release.
Kits for one or two gate leaves
The number of motors corresponds to the number of gate leaves. Two motors do not increase the permitted length or weight of an individual gate leaf. When comparing kits, check the boxes, manual release, control unit and safety equipment.
| One gate leaf | Standalone motor | Two gate leaves |
|---|---|---|
1 motor, 1 LFABBOX4 box and 1 BMA3 manual release. MC824HR30, OXIBD, MYGO4, 1 pair of EPMB photocells and ELDC. | Standalone LFAB4024 One 24 V DC motor with encoder. The box, manual release and control unit are selected separately. | 2 motors, 2 LFABBOX4 boxes and 2 BMA3 manual releases. MC824HR30, OXIBD, MYGO4, 1 pair of EPMB photocells and ELDC. |
Gate length, weight and operation
4 m and 650 kg are separate maximum limits; they do not apply simultaneously. Read the permitted weight for the given length from the graph: the horizontal axis shows gate-leaf length in metres, and the vertical axis shows its weight in kilograms. For a gate leaf around 3 m long, the limit is approximately 500 kg; at 3.5 m, approximately 400 kg. At 4 m, the permitted weight is lower still. These values do not replace an assessment of resistance to movement, infill and wind load.
| Feature | LFAB4024 |
|---|---|
| Motor voltage | 24 V DC |
| Control unit for the new assembly | MC824HR30 |
| Cycles/hour at rated load | Maximum 60 cycles/hour |
| Magnetic encoder | Yes |
| Battery backup | MC824HR30 compatible backup |
One cycle consists of opening and closing. When opening to 180° with BMA1, the stated number of cycles per hour is halved. This is not designed for unlimited continuous operation. Smooth manual movement and correct mechanical installation must be maintained throughout the full travel.
Installing the box and operator
Install on a sturdy gate that operates smoothly. The gate leaf must move easily by hand, without sticking or moving by itself. The operator will not fix faulty hinges or an unstable installation. Also check for crushing hazards at the hinges and between the gate leaves; a pedestrian gate built into a leaf must have protection to prevent operation while it is open.
Drainage and cabling
- Prepare an excavation large enough for the specific box, with a solid concrete foundation, water drainage and cable conduits. Check the dimensions against the actual box supplied before pouring concrete.
- Provide a separate cable route and effective drainage to the box. The drain must not be blocked or routed to a place where water can flow back into the box.
- Position the box level. The box pivot axis must align exactly with the gate-leaf hinge axis throughout its full travel. Check the position and mounting height before pouring concrete.
- Secure the box firmly in concrete and allow the concrete to cure sufficiently before installing the operator. Protect the drain and threads from dirt during the work.
For further practical guidance, see the foundation box installation guide. Ingress protection rating IP67 describes the motor's protection; it is not a reason to leave the box flooded for long periods.
Installing the motor and attaching the gate leaf
- Place the motor in the box in the correct orientation and secure it with washers and nuts at the prepared mounting points.
- Install the ball, control bracket, release lever and connecting lever according to the original drawing. The parts must move freely and be connected correctly.
- Secure the gate leaf to the load-bearing arm with screws or a suitable permanent weld. For the indicated screw fixing, the tightening torque is 30 Nm. When welding, protect the motor, plastic parts and release mechanism from heat.
- Lubricate the moving contact surfaces and check that they move freely. Route the power cable without tension or damage; the cable joint must not be inside the box.
- After adjusting the stops and carrying out the tests, fit the box cover and secure it with screws. Keep the release mechanism accessible.
Mechanical stops and opening angle
The usual opening angle is up to 110°. If the gate does not have suitable external stops, set the supplied: stop 1 on the motor for closing and stop 2 in the box for opening. The stops must bring the gate leaf to a halt in the required position without it striking the surrounding structure. These are mechanical stops, not electrical limit switches.
For a wider opening angle, use NICE BMA1 with a chain drive. This accessory is limited to gate leaves up to 3.5 m; suitable external stops and safe clearance are also required for this installation.
Manual release in the event of a power failure
Before releasing the gate, stop it and disconnect the power supply and any backup battery. Hold the gate leaf, especially in windy conditions or on a slope. Keep people clear of its path.
- Slide open the cover over the release access.
- Insert the supplied BMA3 lever key and turn it 90° clockwise.
- You can now move the gate leaf by hand, slowly and without forcing it.
Re-engaging the drive
- Move the gate leaf to approximately the midpoint of its travel.
- Slide open the cover, insert the key and turn it 90° anticlockwise.
- Gently move the gate leaf until the mechanism re-engages with a clear click. Check that it is properly locked before restoring the power supply.
Connecting the motor and control unit
Disconnect the mains and backup power before carrying out any work. The mains supply must allow complete safe disconnection, and the motor and assembly must be properly earthed. Do not place any cable joint or terminal block inside the foundation box. Make the connection in a suitable protected junction box outside the foundation box.
| LFAB4024 wiring | Connection |
|---|---|
| Blue and brown | The 24 V DC motor pair connects to the corresponding M1 or M2 output. Check the direction during the initial start-up. |
| Black and grey | Connect the magnetic encoder pair to ENC1 or ENC2 for the same motor. The encoder wires are not polarity-sensitive. |
| Yellow-green | Protective earth (PE); never use it for the motor or encoder signal. |
With the MC824HR30, connect one motor to M2 and ENC2. With two motors, M2 is for the leaf that opens first; M1 is for the leaf that closes first. Always pair each ENC connection with the corresponding motor. The MC824L is not a replacement for the MC824H with the LFAB4024.
For the motor cable, use 3 × 1.5 mm² up to and including 10 m, including PE; for the encoder, use 2 × 1 mm² up to 10 m. Choose the wiring and extension according to the environment and MC824HR30 wiring.
Accessory terminals and polarity
| MC824HR30 output or input | Power supply and polarity |
|---|---|
| Auxiliary power supply | The left SbS terminal is +, the right STOP terminal is − as shown in the illustration below. 24 V DC −30/+50%, total current draw no more than 200 mA. |
| BLUEBUS | Two wires, with no polarity. They carry both power and data; they do not replace the universal +/− terminals. |
| FLASH | 12 V DC, up to 21 W; for example, ELDC. Observe the polarity markings on the DC light and the requirements of the specific output. |
| OGI | Gate-open indicator, 24 V DC, up to 4 W. |
| ELS | 12 V AC electric lock, up to 15 VA; AC output with no +/− polarity. |
| OPEN, CLOSE, SbS and STOP | Command inputs use volt-free contacts; do not apply an external voltage to them. Configure STOP for the connected contact type: NO, NC or 8.2 kΩ. |
Do not connect relay-type photocells to BlueBUS. For EPMB, select the address for the required function and run device learning after wiring; BlueBUS wiring and addressing. The specified 12 V DC output is not suitable for the 230 V ELAC warning light.
Initial start-up and safety checks
A sensitive safety edge. Plan where it will be installed and verify the safety of the entire gate. Force adjustment alone does not replace this protection.
- Disconnect the mains and any backup battery. With the drive released, manually check the full travel, alignment of the pivots, secure attachment of the gate leaf, both stops and drainage. The gate leaf must not catch or move on its own.
- Re-engage the release mechanism. Check the motor wires, PE, safety devices and accessories; for 24 V systems, also check the encoder pairings.
- After switching on, check the input status and device learning on the control unit. The motor type and safety inputs must be configured correctly before learning the travel limits.
- During the first movement, watch the direction and sequence of the gate leaves. If the direction is wrong or the gate moves unexpectedly, stop immediately, disconnect the power and correct the wiring. Do not try to fix the problem by increasing the force.
- Learn the end positions according to the instructions for the specific control unit. Then test the full cycle, slowdowns, stops, release mechanism, every pair of photocells and the safety edge.
- Before handover, have the effective forces professionally measured and verify protection at hazardous points. The user must be shown how to operate and manually release the gate and how to maintain it.
Permanently display a legible manual drive-release instruction at the release point. Do not hand over the gate for use until the complete system, including its safety devices, has passed testing.
MC824HR30: selecting LFAB4024
On the 12-position motor selector, set DIP 3 = ON; all other DIP switches 1–12 = OFF. Applies to the LFAB4024 on the MC824HR30. Set the selector with the power disconnected; after changing it, the end positions must be learned again. The TO4024 group display also includes the LFAB4024.
MC824HR30: device learning
Press and hold simultaneously Open and Stop/Set. Release the buttons when L1 and L2 start flashing rapidly, after approximately 3 seconds. STOP stays lit during learning. When learning is complete, L1 and L2 go out; L3 and L4 may flash because the positions have not yet been learned. Repeat device learning after changing the BlueBUS or STOP devices.
MC824HR30: automatic position learning
- After checking the wiring and learning the devices, press and hold simultaneously Stop/Set and Close. When L3 and L4 start flashing rapidly, after approximately 5 seconds, release the buttons.
- Watch as M1 slowly closes to the stop, M2 slowly closes to the stop, M2 and M1 slowly open to the stops, and both leaves close quickly. If the direction is incorrect, stop the procedure immediately.
- At the end of closing, L3 and L4 go out, confirming that learning was successful.
For a single motor unit, M2/ENC2 is connected. If the photocells or STOP input are triggered during learning, the procedure is cancelled and L1 starts flashing. Remove the cause and repeat the learning procedure. Other modes: MC824HR30 position learning.
Settings, remotes and reset
Force, speed, automatic closing pause, partial opening and leaf sequence are set by the control unit, not by the underground motor itself. After changing a setting, check that the safety forces and protective devices are working correctly.
- MC824HR30 programming – functions and values
- Pairing remotes according to the receiver
- MC824HR30 LEDs and light signals
Deleting radio remotes and resetting the control unit are different procedures. A reset will not fix mechanical binding; after settings are deleted, the corresponding learning procedure must be carried out again. Choose the procedure according to the specific control board and installed receiver.
Troubleshooting
| Symptom | What to check |
|---|---|
| The gate leaf cannot be moved manually | Release mechanism, condition of the hinges, levers, axial mounting and any foreign objects in the housing. Do not force a jammed gate to move. |
| The motor runs, but the leaf does not move | Engagement of the release mechanism and linkage between the levers. Disconnect the power before carrying out any work. |
| Incorrect direction or sequence | Motor and wiring assignment. Also check M1/ENC1 and M2/ENC2, the selector switch and repeat the learning procedure. |
| The gate stops or reverses | Free movement, obstructions, photocells, safety edge and the control unit's LED signals. Safety tests; do not increase the force without first removing the cause. |
| Water in the housing | Drain, sediment, water backing up and condition of the wiring. If a cable is damaged or water has entered a connection, take the equipment out of service. |
| The remote control does not respond | Check the remote's battery and pairing, the installed receiver and the antenna; pairing the remote. |
Maintenance
Carry out an inspection at least every 6 months, and more often with intensive use or in harsh conditions. Disconnect both the mains power and backup power before cleaning or carrying out any work. Do not use a damaged or binding gate until it has been repaired.
- Clean the foundation box and drain; remove mud, leaves and foreign objects.
- Check for corrosion and inspect the cable, screws, levers, hinges and mechanical stops.
- Lubricate the designated moving contact surfaces and linkage between the levers; check that the release mechanism works.
- After maintenance, test manual operation, a complete automatic cycle and all protective devices. Check the forces and settings.
Estimated service life
Service life depends on the combined load on the gate leaf and operating conditions. The following indices apply to the length and weight combinations shown; the operating limits. The graph shows the estimated number of cycles with regular maintenance; it is not a guarantee or a number of years. The horizontal axis shows the sum of the indices as a percentage, and the vertical axis shows the number of cycles.
| Characteristics of the complete automation system | Index | Service life graph | |
|---|---|---|---|
| Gate leaf weight | 2.01–3 m | 3.01–4 m | |
| Up to 150 kg | 10% | 20% | |
| 151–350 kg | 20% | 30% | |
| 351–550 kg | 30% | 40% | |
| 551–650 kg | 40% | 50% | |
| Additional factor | Add | ||
| Temperature above 40 °C or below 0 °C; humidity above 80% | 15% | ||
| Solid infill gate leaf | 20% | ||
| Windy conditions | 15% | ||
Example: a 3 m / 500 kg gate leaf has an index of 30%. In windy conditions, add 15%, for a total of 45%. Add any other relevant factors as well. This calculation does not replace checking the suitability of the gate leaf and the safety forces.
Technical specifications and dimensions
| Parameter | NICE LFAB4024 |
|---|---|
| Motor voltage | 24 V DC |
| Control unit for the new system | MC824HR30; control unit power supply: 230 V AC |
| Peak current / power consumption | 5 A / 120 W |
| Maximum torque | 300 Nm |
| No-load speed | 1 rpm |
| Approximate 90° opening at rated speed | Approximately 18 s; acceleration and deceleration increase the time. |
| Cycles/h at rated load | 60 cycles/h |
| Standard opening angle | Up to 110°; up to 360° with BMA1 for a gate leaf up to 3.5 m |
| Protection rating / temperature | IP67 / −20 to +50 °C |
| Motor power cable | 2 m; connections outside the foundation box |
| Motor weight only | 12.5 kg |
| Capacitor | Not used, unlike with a 230 V motor |
| LFABBOX4 | Steel box: 14.4 kg; the motor, box and release mechanism are separate components |
| Dimensions of the assembly with the current box | 400 × 325 × 152 mm; check the actual box supplied before pouring concrete |
Peak input power and maximum torque are not continuous-duty ratings. Actual operating time depends on the angle, load and control unit settings. When planning the excavation and gate leaf height, refer to the dimensioned drawing for the specific box.
Product view
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]