NICE Big-Fab BFAB5024 – standalone underground operator for a swing gate leaf up to 5 m / 900 kg
| Product availability: | within 3 days | We usually dispatch goods within 3 days. |
|---|
within 3 days
€613.29 including VAT
| Weight |
|---|
| 12 kg |
Description of NICE Big-Fab BFAB5024 – standalone underground operator for a swing gate leaf up to 5 m / 900 kg
NICE Big-Fab BFAB5024 is a standalone underground irreversible drive for one gate leaf. It has a 24 V DC motor with a magnetic encoder. It does not include a control unit; for a new setup, use NICE MC824HR30. A double-leaf gate requires two motors and one compatible control unit.
The drive is concealed beneath the hinge axis and does not affect the gate's appearance from either side. An underground solution is also suitable where there is no room for a linear actuator or articulated-arm actuator. The box with its supporting lever forms the lower pivot for the gate leaf; it must be securely installed, aligned with the hinges, and drained.
BFAB5024 is also designed for more intensive use with larger gate leaves. At rated speed, a 90° opening takes approximately 23 seconds; acceleration, deceleration, and load affect the time. Limit: 5 m / 900 kg does not mean 900 kg at a length of 5 m.
24 V is the motor voltage; the MC824HR30 is mains-powered at 230 V AC. For a complete setup, also select a box, manual release, controls, and safety devices.
Controls and compatible accessories
The wiring and setup instructions below apply to the MC824HR30 with an MCA1R30 board. For an older control unit, choose the wiring instructions for the board actually installed. The MC824L is not a replacement for the MC824H with this motor.
| What | Why | Type |
|---|---|---|
| Control unit | Controls one or two motors. Motor wiring. |
|
| Warning light | Indicates gate movement. The voltage and maximum current draw must match the FLASH output. |
Other warning lights choose according to the voltage and current draw of the FLASH output on the specific control unit. |
| Photocells | Passage protection, depending on photocell placement and operating mode; wiring. |
EPMOW requires the radio interface IBW connected to BlueBUS. The FT210B has a battery-powered transmitter on the gate leaf and a receiver connected to BlueBUS by two wires; it also transmits the status of the safety edge. |
| Transmitter | Remote control compatible with the coding of the installed receiver. ON3ELR uses OXILR; ON3EBD uses OXIBD. Remote control pairing. |
|
| Receiver | Radio receiver for the control unit's SM connector. The receiver and transmitter must use matching coding. OXILR and OXIBD use different radio systems. |
|
| Antenna | Choose an antenna to match the frequency of the installed receiver. For the OXIBD, connect it to the antenna terminals. |
|
| Keypad | Code-based access. Choose the EDSWG to match the receiver; the EDSB uses BlueBUS and device learning. |
|
| Key switch | Key-operated control via a volt-free NO contact connected to the control unit's command input. |
|
| Electric locks | Additional gate-leaf locking. The control unit releases the lock before opening. An electric lock is required for a gate leaf longer than 3 m; lock output. |
|
| Card readers | Access using a token or card. Connect the ETPB to BlueBUS; run device learning after connecting it. |
|
| Backup power supply | Operation during a power outage. Choose a battery compatible with the control board and control unit connector. |
For the current MC824HR30 PSS324. The older PS324 requires CABLA11 and Standby switched off (L4 = OFF); backup connection. |
| Safety edge | Limits the consequences of contact with an obstacle; provides separate protection for hazardous areas. Tests before handover. |
|
Motor, foundation box and manual release
| Part of the assembly | What you need |
|---|---|
| Standalone BFAB5024 | One motor with a magnetic encoder, a 2 m power cable and a mechanical closing stop. The box and control unit are not built into the motor. |
| Foundation box | BFABBOX made of cathodically treated steel or stainless steel BFABBOXI. The box includes a load-bearing lever for the gate leaf and a mechanical opening stop. Sold separately. |
| Manual release | NICE BMA3 with a lever key for manually moving the gate leaf in the event of a power failure. Sold separately. For an assembly with BMA3, a NICE PRBM02 mounting lever kit. |
| Controls and safety | MC824HR30, receiver, remote controls, photocells and safety edge, depending on the specific gate. |
| Wider opening angle | NICE BMA1 with chain drive, up to 360° for gate leaves up to 3.5 m. Suitable clearance and external mechanical stops are required. |
The motor has a metal housing. The box can be used for either right- or left-hand gate leaves. The steel and stainless steel versions differ in material and surface treatment; even a stainless steel box does not replace effective water drainage.
When replacing, check the actual motor, box and manual-release versions.
Kits for one or two gate leaves
The kits differ in the number of motors, boxes and manual releases. Two motors do not increase the permitted length or weight of an individual gate leaf. Compare the equipment below for the complete gate.
| One gate leaf | Standalone motor | Two gate leaves |
|---|---|---|
Standalone BFAB5024 One 24 V DC motor with encoder. The box, manual release and control unit are sold separately. |
Gate length, weight and operation
5 m and 900 kg are separate maximum limits. Read the permitted weight for the given length from the graph: the horizontal axis shows the length of one gate leaf in metres, and the vertical axis shows its weight in kilograms. As the gate leaf gets longer, its permitted weight decreases; for a 5 m leaf, it is considerably less than 900 kg.
The height of the gate leaf, solid infill, strong winds and hinge resistance can significantly reduce the permitted limits. Before choosing, check the gate’s full manual range of movement and safe operating forces; weight or motor power alone does not guarantee suitability.
| Property | BFAB5024 |
|---|---|
| Application | Larger and heavier leaf |
| Maximum limits according to the graph | 5 m / 900 kg |
| Maximum torque | 400 Nm |
| Operation at 90° opening | 45 cycles/hour |
| Box | BFABBOX / BFABBOXI |
| Control unit for the new assembly | MC824HR30 |
One cycle consists of opening and closing. When opening to 180° with BMA1, the stated number of cycles per hour is halved. This is operation under rated load, not unlimited continuous operation.
Installing the box and drive
The gate must be mechanically sound: the leaf must move easily by hand, without sticking or moving by itself. Also check for pinch points at the hinges and between the leaves. If the leaf has a pedestrian gate, it must have a safety contact that disables the drive when the gate is open.
Drainage, alignment and concreting
- Prepare an excavation for the specific box, secure it firmly in concrete, and provide cable conduits and a drain. Before concreting, check the dimensions and installation height against the box supplied.
- Route a separate cable run and an effective drain into the box. The drain must not be blocked or routed to a location where water can flow back.
- Position the box horizontally. The box pivot axis must align precisely with the leaf hinge axis throughout its range of movement. Check the position and installation height before concreting.
- Secure the box firmly in concrete and allow the concrete to cure sufficiently. Protect the threads and drain from contamination.
For a practical explanation, see the foundation box installation guide. Protection rating IP67 protects the motor even during temporary immersion; it does not replace drainage and is no reason to leave the box flooded for an extended period.
Fitting the motor and attaching the leaf
- Place the motor in the box in the correct orientation and secure it with washers and nuts.
- Fit the ball and control bracket onto the box pivot. Install the release lever and connecting link as shown in the drawing. All moving parts must be properly connected.
- Attach the leaf to the support arm with bolts or a secure weld. Tighten the illustrated bolted attachment to 30 Nm. When welding, protect the motor, release mechanism and plastic parts from heat; do not weld the leaf to the release sleeve marked as an incorrect location.
- Lubricate the specified contact surfaces and check that they move freely. Route the cable without putting it under strain or damaging it; its connection must not be inside the box.
- After adjusting the stops and completing the tests, fit the cover and secure it with two screws. Keep access to the release mechanism clear.
Lever key: 1 release lever, 2 connecting link, 3 ball, 4 control bracket, 5 box pivot. The numbers in the following attachment procedure indicate the installation sequence.
Mechanical stops and opening angle
The standard opening angle is up to 110°. If the gate does not have suitable external stops, adjust the supplied stops: 1 is the closing stop on the motor; 2 is the opening stop in the box. They stop the leaf in the required position without it striking the surrounding structure. These are mechanical stops, not electrical limit switches.
A wider opening angle is possible with NICE BMA1 with chain drive, up to 360°, and only for leaves up to 3.5 m. Suitable external stops and a safe clearance are required for this installation as well. The BMA1 limit does not replace the drive load graph.
Manual release in the event of a power failure
Stop the gate and disconnect the mains supply and any backup battery. Hold the leaf, especially in windy conditions. Keep people clear of its path.
- Slide the release access cover aside.
- Insert the supplied BMA3 lever key and turn it 90° clockwise.
- Now move the leaf slowly by hand, without forcing it.
Re-engaging the drive
- Move the leaf to approximately the midpoint of its travel.
- Slide the cover aside, insert the key and turn it 90° counterclockwise.
- Gently move the leaf until the mechanism clearly engages. Make sure it is properly locked before restoring power.
Connecting the motor and control unit
Disconnect the mains supply and backup battery before working on the system. Do not place any cable joint or terminal block inside the foundation box. Use a suitable protected junction box outside the foundation box for cable extensions. Maintain the protective earth (PE) connection.
| BFAB5024 wires | Connection |
|---|---|
| Blue and brown | 24 V DC motor power pair to output M1 or M2. The control unit reverses the direction of travel by changing the power supply; do not assign fixed +/− polarity to this pair. |
| Black and grey | Encoder pair to ENC1 or ENC2 of the same motor. The encoder wires are not polarity-sensitive. |
| Yellow-green | Protective earth (PE). Do not use it for the motor or encoder signal. |
For the MC824HR30, connect one motor to M2 and ENC2. With two motors, M2 is assigned to the leaf that opens first; M1 to the leaf that closes first. The ENC assignment must match the output of the same motor. If the supplied cable has different markings, check them against the wiring diagram for the specific motor before connecting it.
| Wiring for MC824HR30 | Cross-section and length |
|---|---|
| Motor, including PE | 3 × 1.5 mm², max. 10 m. |
| Encoder | 2 × 1 mm², max. 10 m. |
| BlueBUS | 2 × 0.5 mm² up to 20 m; for lengths over 20 m and up to 40 m, 2 × 1 mm². |
| FLASH | 2 × 0.5 mm², max. 20 m. |
| Antenna | Shielded RG58; under 5 m recommended, max. 20 m. |
Use cables suitable for the environment and protected cable routing. The motor and encoder can be combined in one suitable 5 × 1.5 mm² cable. Other wiring and the mains supply: MC824HR30 wiring.
Terminals and accessory polarity
| MC824HR30 output or input | Power supply and polarity |
|---|---|
| Auxiliary power supply | Left SbS terminal = +; right STOP terminal = − when viewing the board as shown below. 24 V DC −30/+50%, max. 200 mA total for connected devices. |
| BLUEBUS | Two wires non-polarized. They carry both power and data; they are not universal +/− terminals. |
| FLASH | Warning light output 12 V DC, max. 21 W; e.g. ELDC. Follow the wiring diagram for the specific light; do not confuse the +/− positions of this output with the SbS/STOP auxiliary power supply. |
| OGI | Open gate indication, 24 V DC, max. 4 W. For polarity-sensitive lights, follow the markings on the actual output and light. |
| ELS | Electric lock 12 V AC, max. 15 VA; AC supply, with no +/− polarity. |
| SbS, OPEN, CLOSE | Command inputs for a voltage-free NO contact. Do not apply an external voltage to them. |
| STOP | Voltage-free NO/NC contacts or an 8.2 kΩ resistive safety edge, depending on the selected wiring configuration. The input is detected during device learning; do not apply an external voltage to it. |
BlueBUS devices are connected in parallel. Each pair of photocells must have the correct address for the desired response; repeat device learning after making any changes. MC824HR30 photocell wiring and addressing. Relay photocells must not be connected directly to BlueBUS. The ELAC 230 V warning light must not be connected to this 12 V DC FLASH output.
Initial startup and safety tests
The system requires a suitable pressure-sensitive safety edge to limit impact forces. Its type and location are determined by the gate's hazardous areas. Photocells and force settings alone do not replace a complete safety test.
- Disengage the drive and manually check the entire travel path, alignment, secure fixing, both stops and drainage. The gate leaf must not stick or move on its own.
- Re-engage the release mechanism. Check the motor, encoder, PE, safety devices and accessories.
- With the power disconnected, set the correct motor type on the 12-position selector. Then switch on the power and check the input status.
- Run device and position learning. Watch the direction and sequence of the leaves; stop immediately if movement is incorrect or unexpected. Disconnect both the mains and backup power before correcting the wiring.
- Test the full cycle, slowdowns, stops and release mechanism. Test each pair of photocells, the safety edge and any emergency stop separately.
- Have the effective forces professionally measured before handover. Attach the manual release instructions to the drive and explain operation, release and maintenance to the user. Do not use the gate until all tests have been completed.
MC824HR30: selecting the BFAB5024 motor
Set the following on the 12-position selector DIP 6 = ON; all other DIP switches 1–12 = OFF. Make this setting with the power disconnected, before position learning. After changing the motor selection, positions must be learned again.
When controlled via Oview, the BFAB5024 is displayed as BM5024. Use the setting specified for this motor.
MC824HR30: device learning
Press and hold simultaneously Open and Stop/Set. When L1 and L2 start flashing rapidly, after approximately 3 seconds, release the buttons. When complete, STOP must be lit and L1 and L2 must be off; L3 and L4 may flash if positions have not yet been learned. Repeat learning after changing BlueBUS or STOP devices.
MC824HR30: automatic position learning
Before learning, check the wiring, correct motor selection, operation of the safety devices and the mechanical stops. Device learning must be completed first. For a single motor, M2/ENC2 is connected. Keep the movement under observation.
- Press and hold simultaneously Stop/Set and Close. When L3 and L4 start flashing rapidly, after approximately 5 seconds, release both buttons.
- On a double-leaf gate, M1 slowly closes first to the mechanical stop, followed by M2. Next, M2 and M1 slowly open to the stops, then both leaves close rapidly.
- After successful learning, L3 and L4 go out. Check the full cycle and safety devices.
If the direction or sequence is incorrect, stop learning immediately by pressing Open or Close. Disconnect both the mains and backup power before checking the wiring. If swapping M1/M2, also swap the corresponding ENC1/ENC2 pairs; if the direction is reversed, check the motor power pair. Then repeat learning.
If learning is interrupted by a photocell or the STOP input, L1 will flash. Remove the cause and restart automatic learning; do not bypass the safety devices. Detailed procedure and additional MC824HR30 learning modes.
Settings, remotes and reset
The control unit sets the force, speed, automatic closing pause, partial opening and leaf sequence. After making changes, check the safety forces and protective devices. Increasing the force setting is not a solution to poor mechanical installation.
- MC824HR30 programming – functions and values
- Pairing a remote control according to the installed receiver
- MC824HR30 LEDs and indicator lights
Deleting radio remote controls and resetting the control unit are different procedures. After deleting the settings, the corresponding new learning procedure must be carried out. Use the procedure for the specific control board and receiver.
Troubleshooting
| Symptom | What to check |
|---|---|
| The gate leaf cannot be moved manually | Release, hinges, linkage, alignment and foreign objects in the box. Do not force a jammed gate to operate. |
| The motor runs, but the gate leaf does not move | Engagement of the release mechanism and linkage. Disconnect the power before carrying out any work. |
| Incorrect direction or sequence | M1/ENC1 and M2/ENC2 assignment, motor selection and new learning procedure. |
| The gate stops or reverses | Free movement, obstructions, photocells, the safety edge and Control unit LED signal. Once the cause has been addressed, carry out safety tests. |
| Water in the box | Drain, deposits, water backing up and wiring. If a cable is damaged or water has entered a connection, take the unit out of service. |
| Remote control does not respond | Check the remote control battery, its assignment, the receiver and the antenna; remote control pairing. |
Maintenance
Have professional maintenance carried out at least every 6 months, or more frequently with intensive use or in harsh environments. Disconnect the mains power and backup supply before cleaning or carrying out any work. Do not use a damaged or sticking gate until it has been repaired.
- Remove mud, leaves and stones from the box, and keep the drain clear.
- Check for corrosion and inspect the cables, screws, hinges, linkages and stops; replace worn parts.
- Lubricate the designated moving contact surfaces via the grease nipple with a suitable lubricant. Check that the gate moves freely and that the release mechanism works.
- After maintenance, test manual operation, a complete automatic cycle and every safety device.
Estimated service life
Service life depends on the weight and length of the gate leaf, as well as the environment. Add the index for the relevant combination and any other applicable factors. The following must be met first: application limits; the service life index does not permit the use of a heavier gate leaf. The chart shows an estimated number of cycles with regular maintenance, not a guarantee or a number of years. The horizontal axis shows the sum of the indices as a percentage; the vertical axis shows the number of cycles.
For temperatures above 40 °C or below 0 °C, or humidity above 80%, add 15%. A solid infill adds 20%, and a windy environment adds a further 15%.
Example: a 3 m / 500 kg gate leaf has an index of 30%. In a windy environment, add 15%, for a total of 45%. Any other applicable factors should also be added.
The combinations shown apply to gate leaves longer than 2 m. For a shorter gate leaf or an unclear combination, contact us with the length, weight, infill type and required number of cycles.
Technical specifications and dimensions
| Parameter | NICE BFAB5024 |
|---|---|
| Motor voltage | 24 V DC, separate from the control unit's mains power supply |
| Control unit for the new setup | MC824HR30 / MCA1R30, 230 V AC mains |
| Encoder | Magnetic, with a separate ENC connection |
| Peak current / power consumption | 7 A / 170 W |
| Torque | Maximum 400 Nm; rated 100 Nm |
| Speed | No load: 0.8 rpm; at rated torque: 0.65 rpm |
| 90° opening | Approximately 23 s at rated movement speed, excluding acceleration and deceleration. |
| Operation at 90° opening | 45 cycles/h at rated load; at 180° with BMA1, half that |
| Standard opening angle | Up to 110°; with BMA1, up to 360° for a gate leaf up to 3.5 m |
| Protection rating / operating temperature | IP67 / −20 to +50 °C |
| Power cable | 2 m; extensions and connections must be outside the box |
| Motor weight | 13.3 kg; the box is calculated separately |
| Steel box | BFABBOX – 20.3 kg |
| Box dimensions according to the drawing | 400 × 325 mm, body height 152 mm; also observe the pin position and hinge axis |
The maximum torque and peak power consumption are not continuous-duty ratings. When planning the excavation and gate leaf height, refer to the drawing and the box actually supplied. The dimensions of the motor alone do not replace the box dimensions.
Product view
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]


















