NICE Run RUN1800P - standalone operator for sliding gates (A)


Product availability: In stock

We normally dispatch goods within 24 hours.


NICE Run RUN1800P - standalone operator for sliding gates (A) NICE Run RUN1800P - standalone operator for sliding gates (A)
NICE-RUN1800P-A
In stock
€639.58 excluding VAT
€786.68 including VAT

 pcs
Weight
22 kg

Description of NICE Run RUN1800P - standalone operator for sliding gates (A)

NICE RUN1800P is a standalone non-reversible sliding gate drive with a built-in control unit RUA1. Both the motor and the mains supply are 230 V AC. It has an inductive non-contact limit switch. The limits for a single gate leaf are 1,800 kg and 15 m; suitability also depends on the resistance to movement and the required number of cycles.

The standalone motor is not a complete kit: choose the radio receiver, transmitters, photocells and rack to suit your gate setup. Installation manual PDF · Technical specifications

Quick navigation
Selection and limitsKitsAccessories
InstallationWiringInitial startup
ProgrammingFaultsMaintenance
Manual releaseSpecificationsManual PDF

(Is this drive right for me?)
Compare with other drives:

This product—the standalone NICE Run RUN1800P sliding gate drive (our code NICE-RUN1800P)—includes:

Discounted kits containing the drive NICE Run RUN1800P:

Drive kit with accessories »Standalone driveDrive kit with accessories and rack »

NICE RUN1800PD

NICE Run RUN1800P drive kit

1 × RUN1800P with RUA1, 1 pair of EPMB, 1 × ELDC, 1 × OXIBD and 1 × MYGO4.

Details and price ».

NICE RUN1800P

NICE RUN1800P – standalone drive

Inductive non-contact switch.
230 V motor and RUA1.
No radio receiver or rack.

NICE RUN1800PF

NICE Run RUN1800P drive kit + rack

1 × RUN1800P with RUA1, 1 pair of EPMB, 1 × ELDC, 1 × OXIBD and 1 × MYGO4. Plus 4 m of rack LZ-1; check the rack’s length and load capacity for your gate.

Details and price ».

The drive is compact, safe and practical, making it ideal for both residential and commercial use. Impact-resistant cover, body made of epoxy-coated aluminium alloy.

The drive is suitable for automating a sliding gate weighing up to 1,800 kg, with a leaf length of up to 15 m. These figures apply under the conditions specified by the manufacturer, including weather conditions, temperature variations, gate rigidity and, above all, smooth gate movement. These conditions cannot always be achieved or controlled, so we recommend using the NICE Run RUN1800P drive at no more than 80% of these values. See the Choosing a drive chapter for more information.

BlueBUS connects compatible photocells using a two-core cable. RUA1 supports seven basic protection addresses and a total load of up to 15 BlueBUS devices; one device does not necessarily mean one pair. Connecting and addressing photocells.

Thermal management protects the motor from overheating and reduces the permitted number of cycles at high temperatures. Optional motor heating for low temperatures is configured via a supported service interface; it is not a substitute for clearing ice from the track.

Adjustable force, obstacle sensitivity, automatic closing pause and slowdown at the end of travel. The settings are in the programming tables.

Diagnostics using warning light.

Pinion module 4 is compatible with the toothed rack in our range.

The RUN1800P drive’s “ Slave unit ” function automatically synchronises two motors. This means that two sliding gates moving towards each other can be automated.

Safety must be assessed for the complete gate installation: mechanical safeguards, protection of hazardous areas, operation of photocells and safety edges, and impact-force measurements. The motor alone does not replace these tests.

Accessories compatible with the NICE Run RUN1800P drive

We also recommend purchasing compatible optional accessories for the drive, or choosing one of our pre-assembled discounted kits:

What Why Type
Warning light

Warns of movement and signals faults. Connects to FLASH; the antenna uses a separate coaxial cable.

  • LED warning light with antenna ELDC
  • Multifunction light WLT
Photocells

Detect an obstruction in the beam; the response is determined by the pair address. They do not replace protection for all hazardous areas of the gate.

BlueBUS wiring; FT210B for a movable safety edge. The TX and RX units of a pair must have the same address.

Transmitter Choose according to the coding and type of receiver installed. The same frequency alone does not guarantee compatibility; LoRa and two-way functions require a compatible receiver.
Receiver

The radio receiver plugs into the SM connector; pairing depends on the receiver. For Wi-Fi/GSM, a compatible interface or a volt-free P.P. contact is required.

Antenna

For better remote-control range.

  •  integrated into the warning light ELDC
  • antenna only ABFKIT
Keypad EDSWG requires a compatible radio receiver. For EDSB, the specific RUA1 version must support BlueBUS control devices; the bus alone does not confirm compatibility.
Key switch

Control the gate with a key using a switch connected to the drive by cable from any location.

  • surface-mounted, with a standard cylinder EKS
  • surface-mounted, with a European cylinder, EKSEU
  • flush-mounted, with a standard cylinder EKSI
  • flush-mounted, with a European cylinder EKSIEU
Card readers Use ETPB only after confirming support for BlueBUS control devices with the installed RUA1. Connect the reader with a volt-free relay to P.P. and power it separately according to its current draw.
  • ERA Transponder Reader ETPB
Gear rack

Required module 4 rack. Choose the material, fixing method and load capacity according to the gate weight; a nylon rack is not automatically suitable for the full 1,800 kg maximum.

  • nylon, with steel reinforcement, 33 cm LZ-1
  • nylon, with steel reinforcement, 1 m LZ-10
  • nylon, with steel reinforcement, reverse type, 1 m LZ-15
  • steel, 30x8mm, 1m LZ-3
  • steel, 30x12mm, 1m LZ-5
  • stainless steel, 30x10mm, 1m LZ-7
Power failureIn the event of a power failure, use the manual release. Neither PS124 nor Solemyo is a direct backup for the 230 V RUN1800P motor with RUA1.

NICE RUN1800P at a glance

Model RUN1800P has an inductive non-contact limit switch, a 230 V motor and RUA1 control unit. The cover is impact-resistant, and the body is made of aluminium alloy. The receiver is selected separately; the SM connector and BlueBUS are two different interfaces.

When the motor is disengaged, the gate can be moved manually during a power outage. The gate must have reliable guidance, protection against derailment, and sturdy mechanical stops at both ends. The limit switch does not replace these stops.

Choosing a NICE RUN1800P gate operator

Weight and length alone are not enough. Measure the force required to start the gate and to move it along its entire travel, including areas with higher friction. For the RUN1800P, the starting force must be less than 555 N and the force needed to keep the gate moving must be less than 280 N; these are half the available peak and nominal forces, respectively. Allow for conditions to worsen in winter, too.

Limits and operating margin

ParameterManufacturer's maximumOur recommended guideline
Gate leaf length15 mUp to 12 m
Total gate leaf weight1,800 kgUp to 1,400 kg

We recommend allowing this margin for typical selection. This is not a separate manufacturer limit or confirmation that every gate of these dimensions is suitable. Also check mechanical resistance and operating duty. The relevant measurements are the length and weight of the entire moving gate leaf, including the infill and any counterweight—not just the clear opening width.

How many cycles the operator can perform

One cycle is a complete opening and closing. First, choose the row based on the length; then multiply both figures by the weight factor. Round the resulting whole-number count down. Higher temperatures and more demanding movement may reduce the number further.

Gate leaf lengthMax. cycles/hourMax. consecutive cycles
Up to 6 m4228
Over 6 m up to 9 m2818
Over 9 m up to 12 m2114
Over 12 m up to 15 m1711

Gate leaf weightAvailable cycle factor
Up to 500 kg100%
Over 500 kg up to 900 kg80%
Over 900 kg up to 1,200 kg75%
Over 1,200 kg up to 1,500 kg60%
Over 1,500 kg up to 1,800 kg50%

Example based on the tables: a 10 m / 1,300 kg gate leaf → 21 × 0.60 = 12.6 and 14 × 0.60 = 8.4. For planning, allow no more than 12 cycles/hour and 8 consecutive cycles, before applying any further temperature-related reduction. A factor of 60% means 60% of the available number, not a 60% reduction.

Estimated service life

Add the weight index, length index and any other relevant factors. Include other factors if they are likely to occur more than 10% of the time. Look up the total in the original graph. The cycle estimate is not a service-life guarantee or a fixed number of years.

Characteristics of the complete automation systemIndexService-life graph
Weight up to 500 kg5%RUN1800/RUN1800P – estimated service-life graph

Horizontal axis: total of indices in %.
Vertical axis: estimated number of cycles.

Over 500 kg up to 900 kg10%
Over 900 kg up to 1,200 kg20%
Over 1,200 kg up to 1,500 kg30%
Over 1,500 kg up to 1,800 kg40%
Length up to 6 m5%
Over 6 m up to 9 m10%
Over 9 m up to 12 m15%
Over 12 m up to 15 m25%
Temperature above 40 °C / below 0 °C or humidity above 80%10%
Dust and sand15%
Saline environment20%
Movement interrupted by a photocell10%
Movement interrupted by the STOP input20%
Peak function enabled10%

For example, 1,300 kg and 10 m gives 30% + 15% = 45%; if movement is frequently interrupted by a photocell, add 10%, for a total of 55%. The mere presence of photocells does not mean their index is automatically added. A total above 100% means the conditions are outside acceptable limits. The operator is not designed for use in acidic, saline or explosive atmospheres; the salinity index shown does not mean that such use is permitted.

Installing the NICE RUN1800P gate operator

Anchor the operator to a solid, level foundation in an area that is not at risk of flooding. Determine the height based on the actual position of the rack and pinion. A cantilever gate may require a higher foundation or a suitable sturdy bracket; its structure must safely bear the load. The gate must not rest its weight on the motor.

Wiring

Route the mains supply separately from low-voltage and signal cables. Select accessories, wiring and protection according to the specific installation. Typical original configuration:

NICE Run wiring layout

  1. Key switch
  2. Photocells on the post
  3. Photocells
  4. Fixed safety edge 1
  5. Moving safety edge 1
  6. Drive opening limit stop
  7. Rack rail
  1. Fixed safety edge 2
  2. Warning light with built-in antenna
  3. NICE Run RUN1800P drive
  4. Drive closing limit stop
  5. Moving safety edge 2
  6. Remote control

PurposeCableMax. length
A – mains3 × 1.5 mm²30 m; over 30 m, at least 3 × 2.5 mm², subject to assessment of voltage drop and protection
B – warning light2 × 0.5 mm²20 m
B – antennaRG58 coaxial cable20 m; under 5 m recommended
C – BlueBUS2 × 0.5 mm²30 m; for 30–50 m, 2 × 1 mm²
D – key switch2 cables, 2 × 0.5 mm² or 4 × 0.5 mm²50 m
E – fixed safety edges2 × 0.5 mm²20 m
F – moving safety edge2 × 0.5 mm²30 m; moving cable routing or FT210B

Foundation installation and inspection

  1. Before installation, release the drive and check that it moves smoothly by hand, the guide is secure, the end stops are firmly fixed, and the gate leaf is protected against jumping off the track.
  2. Prepare the cable conduits and the base plate with four anchors. Leave no more than 40 mm of thread exposed above the plate.
  3. Level the plate, set it in a solid foundation, and allow the concrete to cure fully. Do not install the motor on a soft or unstable surface.
  4. Secure the motor with four nuts and washers, adjust its position relative to the rack, then tighten the fasteners.
  5. Check the clearance, rack joints, gate guidance, and switch positions along the entire travel path. Secure the cables so they cannot come loose and enter moving parts.

Rack rail and its stop

The gate moves by transferring the drive pinion’s torque into linear motion through the rack-and-pinion mechanism on the drive rack. Two types of rack rails are most commonly used:

Nylon rack rail for the drive

Nylon rack (possibly with steel reinforcement) – secured to the gate with self-tapping screws through the mounting holes. Ideal for relatively light and short gates. The steel pinion and nylon rack mesh quietly.

Steel rack rail for the drive

Steel rack – secured to the gate by welding threaded brackets in place, then screwing the rack into them. Used for longer and heavier gates. The steel pinion meshing with the steel rack makes operation slightly noisier.

The key requirement is that the drive pinion module is compatible with the rack module. Drive NICE Run RUN1800P has a tooth module of 4.

The drive detects the end positions when opening and closing using limit stops mounted on the rack:

1. Level the drive using the four adjustment points 2. The gate and drive must be level 3. Leave a gap of approximately 1–2 mm between the rack and the drive pinion so the gate’s weight is not transferred to the drive.
Leveling the drive Sliding gate with rack rail Leave a 1–2 mm gap between the rack rail and the drive pinion
4. Tighten the drive anchors so the drive cannot move under load

5. Set the limit switch brackets according to the instructions below. Fixed mechanical stops must remain at both ends of the travel path.

 
Tighten the drive and fit the end caps Installing the limit stops on the rack rail  

Maintain a 1–2 mm gap between the rack and pinion

Clearance 1–2 mm must be maintained along the entire travel path. Align the rack with the pinion; move the gate manually to check for lateral deviations of no more than 5 mm and smooth transitions between sections. After adjustment, tighten the motor securely.

Setting the limit switches

The RUN1800P uses an inductive sensor. The rack-mounted bracket is detected without mechanically pressing a lever. Set the gap between the bracket and the sensor to 3–8 mm according to the original drawing.

  1. Move the gate leaf by hand to the open position, at least 2–3 cm before the fixed stop.
  2. Slide the bracket along the rack in the opening direction until the corresponding limit-switch LED goes out.
  3. Move the bracket at least another 2 cm in the same direction and secure it.
  4. Set the closed position in the same way and check that the gap remains 3–8 mm throughout the bracket’s travel.
  5. After engaging the gearbox and teaching the travel path, check that the gate stops before both mechanical stops.

RUN1800P – mounting the inductive switch bracket

RUN1800P – bracket-to-sensor distance: 3–8 mm

NICE RUN1800P drive wiring

Before opening, wiring, or disconnecting terminals, disconnect the mains supply and verify that the circuit is de-energized. The mains supply is 230 V AC; accessory terminals have different voltages and functions.

230 V AC mains supply

TerminalWire and function
LLive conductor; usually brown.
NNeutral conductor; usually blue.
PE / protective earthGreen-and-yellow protective conductor. Class I equipment requires reliable protective earthing.

RUA1 – L, N and protective earth for the mains supply

Route the mains cable through the smaller gland and the other cables through the larger one. Fit the membranes snugly around the cables, restore the seal, and secure the cables against pull-out. Leave the required slack inside, approximately 20–30 cm; cables must not obstruct the cover or moving parts.

RUA1 control unit terminals

TerminalPurpose, voltage and polarity
FLASH – warning lightFor the current setup ELDC LED warning light (12–36 V DC); connect the light to FLASH and the antenna to the separate antenna input. WLT use it according to its instructions. The output flashes and is not a continuous power source. The original incandescent lamp load limit is one or two warning lights, each rated 12 V / 21 W. Follow the terminal markings on the warning light and the board; do not apply the polarity of the auxiliary output here. Wiring diagram with ELDC.
S.C.A. – indicator24 V DC, max. 4 W, voltage −30% / +50%. Function according to II/L4. The exact polarity of this pair is not marked; if using polarized accessories, check the specific board before connecting.
BLUEBUSPower supply and communication for compatible devices. Photocells are connected without polarity. Total limit: 15 BlueBUS load units. For two Master/Slave motors the wire order must be followed exactly.
STOPVoltage-free NO, NC or 8.2 kΩ resistive devices; the RUA1 learns the device type. A change in the learned state stops movement and briefly reverses it. The contacts have no +/− polarity and must not be supplied with external voltage.
P.P. / STEP-BY-STEPVoltage-free NO contact for step-by-step operation. Connect the module relay's COM and NO contacts to the two P.P. terminals; the contact is non-polarized. The module's power supply is a separate connection.
OPENVoltage-free NO contact for opening; non-polarized.
CLOSEVoltage-free NO contact for closing; when I/L7 is ON, it partially opens. Non-polarized.
AERIAL / antennaConnect the coaxial cable's center conductor and shield according to the receiver/board terminal markings. These are not power supply +/− terminals. RG58; the manual specifies a 52 Ω input. Choose an antenna to match the receiver frequency.

Multiple devices on STOP

Wire NO contacts in parallel and NC contacts in series. Two 8.2 kΩ resistive devices can be wired in parallel; for more devices, use a configuration with a single 8.2 kΩ end-of-line resistor, as shown in the device diagram. Combining NO and NC requires an 8.2 kΩ resistor in series with the NC branch. Do not replace a safety edge with a simple jumper. After making changes, repeat the learning procedure and safety test.

Fuses

Check only after disconnecting the mains supply. Replace fuses F1/F2 with the same type, time-current characteristic and rating as specified on the installed board. If a fuse blows repeatedly, identify the cause; do not fit a higher-rated fuse.

Fuses for the NICE Run drive and RUA1 control unit

RUA1 control unit wiring diagram

Wiring ELDC warning light, EPMB photocells and EKS key switch. Accessory shapes are illustrative; follow the terminal markings on the specific device when wiring. For EKS, use C–NO for both OPEN and CLOSE; do not use the NC terminal shown in the drawing for a command.

RUA1 – wiring the ELDC warning light, EPMB photocells and EKS key switch

AccessoriesConnection
ELDC – lightThe two terminals on the input marked with a bulb symbol → the pair of FLASH terminals on the RUA1. ELDC is rated for 12–36 V DC; do not connect it to 230 V mains. FLASH is not a continuous auxiliary power source. Follow the markings on the warning light and board; do not apply the polarity of the STOP/P.P. auxiliary output here.
ELDC – antennaSeparate RG58 coaxial cable: connect the center conductor to the antenna signal and the shield to the shield terminal as indicated by the symbol. This is not a +/− power supply. Choose an antenna to match the frequency of the installed receiver.
EPMB – both TX and RXThe pair of BlueBUS terminals on each device → both BLUEBUS terminals on the RUA1, in parallel and non-polarized. Do not confuse EPMB with EPM relay photocells.
EKS – open / closeC–NO of one microswitch → both OPEN terminals; C–NO of the other → both CLOSE terminals. Leave NC unconnected. These are two voltage-free, non-polarized contacts; do not apply external voltage to the inputs. When I/L7 = ON, the CLOSE input triggers partial opening.

Drive photocells

For the current setup, use compatible NICE EPMB. TX is the transmitter and RX is the receiver. Connect both devices to the two BLUEBUS terminals without polarity; do not connect them to the auxiliary 24 V output. After adding or removing a device, repeat the device learning and a safety test. The RUA1 limit is 15 BlueBUS load units; one unit does not automatically equal one pair.

Connecting multiple EPMB pairs

Connect the pairs in parallel as shown in the diagram. TX and RX of one pair have the same address, the next pair must have a different address. Choose the mounting position, TX/RX orientation and jumpers according to the direction of protection and the gate's hazardous areas.

EPMB – original diagram showing TX and RX connected in parallel to polarity-free BlueBUS

Positioning the protective pairs

RUN – positioning protective pairs FOTO to FOTO 3 for a sliding gate

The layout is for guidance only. FOTO and FOTO II protect the outside passage while closing; FOTO 1 and FOTO 1 II protect the inside passage while closing; FOTO 2 and FOTO 2 II protect during opening. FOTO 3 is a single pair routed along the gate leaf's travel path, as shown in the diagram. Detection applies to its beam; it does not automatically cover all hazardous areas of the gate. When using FOTO II and FOTO 3 together, follow the TX/RX orientation in the photocell installation instructions to prevent interference between the pairs.

For standard protective wiring on the RUA1, use addresses FOTO to FOTO 3. Do not use the FA1/FA2 settings for triggering opening in this setup; do not interrupt connection A on the photocell.

EPMB photocell jumper table

Set the same combination on the TX and RX of each pair. Two pairs in the same BlueBUS network must not have the same address. Store any unused jumper in the designated spare slot; do not leave it loose inside the photocell.

Address and protective functionTX and RX jumpers
FOTO
While closing, outside pair approximately 50 cm above ground level.
EPMB BlueBUS photocell jumpers – FOTO
FOTO II
While closing, outside pair approximately 100 cm above ground level.
EPMB BlueBUS photocell jumpers – FOTO II
FOTO 1
While closing, inside pair approximately 50 cm above ground level.
EPMB BlueBUS photocell jumpers – FOTO 1
FOTO 1 II
While closing, inside pair approximately 100 cm above ground level.
EPMB BlueBUS photocell jumpers – FOTO 1 II
FOTO 2
While opening, outside pair.
EPMB BlueBUS photocell jumpers – FOTO 2
FOTO 2 II
While opening, inside pair.
EPMB BlueBUS photocell jumpers – FOTO 2 II
FOTO 3
One protective pair routed along the gate leaf's travel path, as shown in the diagram.
EPMB BlueBUS photocell jumpers – FOTO 3

When replacing a photocell with the same type, retain the pair's address and function. After replacement, check the TX/RX indicators and the gate's safety response in both directions. Repeat the learning procedure if the type or number of devices changes.

Moving safety edge and FT210B

NICE FT210B transmits the status of an 8.2 kΩ resistive safety edge via an optical beam. The TX on the gate leaf is powered by its own battery; the RX is connected to polarity-free BlueBUS. Set the safety edge address and wiring according to the FT210B instructions; this is not a standard pair with a hard-wired, powered TX. The RX current draw counts toward the BlueBUS load.

Radio receiver for operators

For a new setup, you can choose NICE OXIBD for the SM connector. If you have an existing SMXI or OXI, choose transmitters with the coding supported by that receiver. Insert the receiver with the mains power disconnected; pair transmitters according to the remote control pairing instructions and the instructions for the specific receiver. The radio memory, travel learning and RUA1 settings are separate functions.

Operator radio receiver

NICE Run RUN1800P operator is supplied with a NICE RUA1 control unit, which provides an SM connector for connecting an external radio receiver (e.g. NICE OXI, NICE SMXI). This receiver is essential for receiving commands transmitted by remote controls, so it is a prerequisite for operating the sliding gate remotely using a remote control.

Selecting the gate's direction of travel

The sliding gate's opening direction must be selected according to the position of the operator relative to the sliding gate leaf. View the gate from the side where the operator is installed.

Selecting the sliding gate direction – opens to the left Selecting the sliding gate direction – opens to the right
If the gate opens to the left, set the switch to the left. If the gate opens to the right, set the switch to the right.

You will find the switch on the right side of the RUA1 control unit in the middle.

First power-up and device learning

Leave the gate leaf approximately halfway along its travel, engage the gearmotor, and check the direction setting, limit switches and clear travel path. Switch on the power. BLUEBUS should flash about once per second, and the LEDs on both TX and RX photocells should indicate operation. On first startup with the factory settings, the FLASH warning light and S.C.A. indicator should be off. Once commissioned, S.C.A. is controlled by the selected function II/L4; in the default mode, it is on when the gate is open. If the status is incorrect, disconnect the power and fix the fault first.

  1. Press and hold OPEN + STOP/SET approximately 3 s.
  2. Release when L1 and L2 start flashing rapidly.
  3. Wait for BlueBUS and the STOP input to finish being detected. L1/L2 will stop indicating the learning request, and the STOP LED must be lit; L3/L4 may continue flashing because the travel path has not been learned.
  4. After adding or removing a device, repeat the learning procedure and retest its safety function.

Travel path learning

  1. After successfully learning the devices, hold CLOSE + STOP/SET approximately 3 s.
  2. Release when movement starts. The first movement must be opening.
  3. If the gate closes, stop it with STOP, disconnect the power, correct the direction setting, and repeat the learning procedure.
  4. Allow it to open to the limit switch and then close fully to the second limit switch. Do not obstruct the travel path during learning.
  5. Check the end positions, partial opening, and several complete cycles.

Evaluation of devices connected to the NICE Run RUN1800P drive

Evaluation of sliding gate leaf length by the NICE Run RUN1800P drive

Testing and handover of the gate

Check movement in both directions, the mounting of the drive and rack, the limit and mechanical stops, and each safety device individually. Test the photocells during opening, closing, and at rest, as applicable to their function. Impact forces must be measured; repeat the test after changing the force, sensitivity, or acceleration settings. Do not put the gate into service if its safety devices are not working. The user must be given the keys and manual, and shown how to use the manual release and perform maintenance.

Drive programming

The RUA1 board has OPEN, STOP/SET, and CLOSE buttons, and eight LEDs, L1–L8. The gate must be stationary before making changes. After changing the safety settings, test the entire gate.

ButtonNormal operation / programming
OPEN ▲Open / move to the next LED.
STOP/SETStop / enter settings and confirm.
CLOSE ▼Close / move to the previous LED.

Level I – enabling and disabling functions

  1. Hold STOP/SET until L1 starts flashing, approximately 3 s; release the button.
  2. Use OPEN/CLOSE to select the function's LED.
  3. Briefly press SET to toggle ON/OFF. In programming mode, a short flash indicates OFF and a long flash indicates ON.
  4. Set the next function in the same way, or do not press any button for 10 s. The settings are saved and programming ends.

LED – function and meaningStatus
L1 – Automatic closing
After opening, the gate closes after the pause set using II/L1. The factory-set pause is 30 s. When OFF, it waits for a command.
OFF – factory setting
ON – function enabled
L2 – Close after photocell
Closes 5 s after the passage is clear. With I/L1 OFF, it opens fully first; with I/L1 ON, opening stops once the photocells are clear. A STOP command cancels this function for the current manoeuvre.
OFF – factory setting
ON – function enabled
L3 – Always close
After power is restored, it closes an open gate; the beacon gives a 5 s warning before movement. When OFF, the gate remains stationary after power is restored.
OFF – factory setting
ON – function enabled
L4 – Slowdown
At the end of opening and closing, speed is reduced to approximately 60% of the rated speed. Available torque is halved; slowdown may not be suitable for a heavy gate or one with high resistance.
OFF – factory setting
ON – function enabled
L5 – Boost
When ON, soft start is disabled and maximum starting force is used. This does not replace fixing friction, track problems, or a frozen gate. Check that the forces are safe after making a change.
OFF – factory setting
ON – function enabled
L6 – Pre-flashing
The beacon gives a warning 3 s before movement. When OFF, it starts flashing only when movement begins.
OFF – factory setting
ON – function enabled
L7 – CLOSE = partial opening
A CLOSE command from the terminals or radio control initiates partial opening according to II/L6. When OFF, it means closing.
OFF – factory setting
ON – function enabled
L8 – Slave unit
Enable this only on the second motor in a Master/Slave configuration. When OFF, the drive is the Master.
OFF – factory setting
ON – function enabled

Outside programming mode, the LED for a function is lit when ON and off when OFF. L1/L2 or L3/L4 flashing simultaneously may indicate that device or travel path learning is required; see LED diagnostics.

Level II – adjustable values

  1. Hold SET until L1 starts flashing, approximately 3 s; release.
  2. Use OPEN/CLOSE to select the parameter's input LED.
  3. Press SET again and hold it while adjusting. After approximately 3 s, the LED for the current value lights up.
  4. While still holding SET, select a value using OPEN/CLOSE. Then release SET.
  5. Repeat the procedure for the next parameter; to exit, wait 10 s without pressing any buttons.

Input LED – name and descriptionSetting LED – value
L1 – Pause duration
Automatic closing time when I/L1 is enabled.
L1 – 5 s
L2 – 15 s
L3 – 30 s (factory setting)
L4 – 45 s
L5 – 60 s
L6 – 80 s
L7 – 120 s
L8 – 180 s
L2 – Step-by-step mode
Sequence of commands for P.P. and the corresponding radio channel.
L1 – Open → stop → close → stop
L2 – Open → stop → close → open (factory setting)
L3 – Open → close → open → close
L4 – Condominium mode: ignores further commands while opening; reopens while closing
L5 – Condominium mode 2: same as L4; a command held for more than 2 s stops the gate
L6 – Step-by-step mode 2: a brief command of up to 2 s initiates partial opening
L7 – Hold-to-run operation
L8 – Semiautomatic opening; hold-to-run closing
L3 – Obstacle sensitivity
Higher sensitivity responds to less resistance. First set the motor force II/L5, then the sensitivity; measure impact forces after making changes.
L1 – Very high – lightweight gates
L2 – Very high
L3 – High
L4 – Medium
L5 – Medium-low (factory setting)
L6 – Low
L7 – Very low
L8 – Very low – heavy gates
L4 – S.C.A. output
24 V output function / max. 4 W. The radio channel selection also depends on the receiver.
L1 – Open-gate indicator: off when closed, on when open; flashes slowly while opening and quickly while closing (factory setting)
L2 – Active when the gate is closed
L3 – Active when the gate is open
L4 – Radio output 2
L5 – Radio output 3
L6 – Radio output 4
L7 – Maintenance indicator
L8 – Electric lock
L5 – Motor force
Torque control. Force is not determined by weight alone; do not use excessive force to overcome a mechanical fault.
L1 – 40%
L2 – 50%
L3 – 60%
L4 – 80%
L5 – 100%
L6 – Semiautomatic 40–100%
L7 – Semiautomatic 60–100%
L8 – Automatic 0–100% (factory setting)
L6 – Partial opening
Pedestrian opening distance. It must fit within the actual gate travel.
L1 – 0.5 m
L2 – 1.0 m (factory setting)
L3 – 1.5 m
L4 – 2.0 m
L5 – 2.5 m
L6 – 3.0 m
L7 – 3.4 m
L8 – 4.0 m
L7 – Maintenance reminder
Number of manoeuvres since servicing. Opening and closing are two manoeuvres; one complete cycle consists of opening and closing.
L1 – Automatic, based on operating load (factory setting)
L2 – 2,000 manoeuvres
L3 – 4,000 manoeuvres
L4 – 7,000 manoeuvres
L5 – 10,000 manoeuvres
L6 – 15,000 manoeuvres
L7 – 20,000 manoeuvres
L8 – 30,000 manoeuvres
L8 – Error log
Records of the last eight manoeuvres; this is not a configurable default setting.
L1 – Most recent manoeuvre
L2 – Second most recent manoeuvre
L3 – 3rd most recent manoeuvre
L4 – 4th most recent manoeuvre
L5 – 5th most recent manoeuvre
L6 – 6th most recent manoeuvre
L7 – 7th most recent manoeuvre
L8 – 8th most recent manoeuvre

Two sliding gate leaves – Master/Slave

Each gate leaf has its own RUN and its own 230 V AC mains supply. One motor is the Master, the other the Slave. Using two motors does not increase the weight or length limit for an individual gate leaf.

BlueBUS connection

Between the motors, observe the wire-terminal pairing: Master terminal 1 → Slave terminal 1 and Master terminal 2 → Slave terminal 2 as shown by the connectors oriented the same way in the diagram. The 1/2 markings indicate positions in the diagram, not universal power supply +/− terminals. This is an exception to BlueBUS photocells, which do not require polarity.

RUA1 – Master/Slave, ELDC and EPMB; BlueBUS connection 1 to 1 and 2 to 2

Accessory shapes are indicative only. For OPEN and CLOSE on the EKS, use the C–NO contacts; do not use the NC terminal shown in the drawing for the command. EPMB and the shared EKS key switch must be connected to the Master. Any second ELDC connect to FLASH on the second motor. The antenna is a separate coaxial connection.

  1. Set the opening directions for both opposing gate leaves and wire them according to the diagram with the power disconnected.
  2. Connect the receiver and shared safety/control devices to the Master.
  3. Switch on both motors. On the Slave, set level I, L8 = ON.
  4. Run device learning on the Slave first, then on the Master.
  5. Start travel-limit learning on the Master and check coordinated movement and all safety devices.

FLASH, S.C.A., a safety edge (STOP), and P.P. can also be connected separately to the Slave. A P.P. command to the Slave opens only its own gate leaf fully; do not use OPEN/CLOSE on the Slave. Most settings are controlled by the Master. Sensitivity, force, S.C.A. output, Peak, and the error history are also assessed for the specific second drive unit.

Power supply for external accessories

The RUA1 auxiliary output provides 24 V DC, −30% / +50%, 100 mA maximum total. At a nominal 24 V, this means approximately 16.8–36 V; the connected module must tolerate this range. The power supply and command contact are two separate pairs of wires.

FunctionRUA1 terminalAccessory terminal
Power supply negative −Right-hand STOP terminal in the orientation shown in the image belowDevice power supply − / GND
Power supply positive +Left-hand P.P. terminal in the same orientationDevice power supply + / V+
Step-by-step commandBoth P.P. terminalsVoltage-free relay COM and NO; no polarity

RUA1 – auxiliary power supply: right-hand STOP terminal negative, left-hand P.P. terminal positive

For higher current draw, an unsuitable voltage range, or startup surges, use a separate power supply as specified for the module and connect only an isolated voltage-free contact to P.P. Do not use the FLASH or BlueBUS output as a substitute for the auxiliary power supply.

Gate held open and timer

A voltage-free P.P. command lasting more than 2 s opens the gate and keeps it open for as long as the command is active, for example from a time switch. This function is not used in mode II/L2, value L5 “Shared entrance 2”. If a continuous command is unexpected, check the timer and the relevant input.

Emergency operation if a safety device fails

Only under direct supervision and with the safety path completely clear: if the first command is rejected because of a safety fault, issue it again within 3 s and keep it held. After approximately 2 s, the gate moves while you hold the command; releasing it stops the gate. This is a temporary emergency mode, not a substitute for repair. Never bypass a safety device for continuous operation.

Maintenance and servicing

Carry out maintenance at least every 6 months or after 20,000 operations, whichever comes first. Disconnect the power supply and check the fixings, corrosion, wear on the wheel and rack, alignment, and free movement; clean the photocells and repeat the safety tests. The service indicator does not replace regular maintenance.

Maintenance alert

The threshold is set by II/L7. To have S.C.A. also indicate when maintenance is due, set II/L4 = L7.

Counter statusFLASH / maintenance indicator
Below 80% of the thresholdFLASH flashes normally; the indicator lights for 2 s when opening starts.
81–100% of the thresholdFLASH stays on for 2 s at the start, then flashes normally; the indicator flashes during operation.
Above 100% of the thresholdFLASH stays on for 2 s at both the start and end; the indicator flashes continuously.

Checking the number of operations

  1. Enter SET programming by holding SET for approximately 3 s; release it when L1 flashes.
  2. Use OPEN/CLOSE to select input L7.
  3. Hold SET and wait approximately 3 s for the LED showing the current value to light up.
  4. While holding SET, briefly press and release OPEN + CLOSE simultaneously.
  5. The number of flashes from the value LED indicates the threshold consumed in 10% increments; no flashes means the value is below 10%. Release SET.

Resetting the service counter

  1. After maintenance is complete, select II/L7 using the same procedure.
  2. Hold SET and wait approximately 3 s for the value LED to light up.
  3. While continuing to hold SET, press OPEN + CLOSE for at least 5 s, then release both buttons.
  4. Rapid flashing confirms the reset; release SET and wait for programming to end.

This procedure resets the service counter. It does not erase transmitters, replace travel learning, or perform a full control unit reset. If there is an electronics fault, do not try an unverified button combination; follow the diagnostic and service instructions for the specific RUA1.

Troubleshooting

Before working inside an open drive unit, disconnect the power supply. Mains or live-terminal measurements must be carried out by a qualified person. Contact our technical support team and provide the motor model, control board designation, and number of flashes.

By fault symptom

SymptomWhat to check
The remote control does not light upCheck the battery and contacts in the remote control according to its instructions.
The remote control lights up, but the gate does not respondCheck receiver compatibility and memory; pairing. Also test the button or P.P. input to distinguish a radio issue from a drive fault.
BLUEBUS is offCheck the mains supply and fuses with the power safely disconnected; do not bypass safety devices.
The command is not registeredWhen a BLUEBUS input changes, it flashes rapidly twice; an NO command on P.P./OPEN/CLOSE should light the corresponding LED. Check the contact and cable.
The gate starts moving, stops, or reversesFirst, check manually for friction, track issues, trolley issues, ice, rack clearance, and end stops. Then check the force/sensitivity settings; any change requires the impact forces to be measured again.
The warning light does not workCheck FLASH, wiring, short circuits, and whether the warning light is compatible. During flashing, the measured voltage may fluctuate between approximately 10–30 V DC; this is not a constant 24 V supply.
S.C.A. does not workFirst check mode II/L4, then the load (up to 4 W), cable, and output (approximately 24 V DC).
The limit switch does not stop movementCheck the mounting and position of the brackets; on the RUN1800P, also check the 3–8 mm clearance. If the direction is wrong, stop the gate and correct the direction selector.

Warning light diagnostics

The light flashes at regular intervals during normal operation. An error code consists of a series of flashes, a 1 s pause, and the same series repeated; count the flashes in one series.

FlashesMeaning / remedy
1BlueBUS
Check the devices, wiring, and addresses. Repeat learning after repairs or a deliberate change to the setup, not to mask a faulty safety device.
2Photocell
This is a normal response when the beam is interrupted in the protected direction. With the path clear, check that the photocells are clean, aligned, and correctly addressed.
3Resistance / obstacle detection
Remove the obstacle and eliminate any mechanical resistance. Do not increase Force or Peak without checking the gate and carrying out a subsequent safety test.
4STOP
The learned status has changed. Check the safety edge, contacts, and wiring; do not bypass the safety device.
5Internal parameters
Wait 30 s and issue the command again. If the fault recurs, have the RUA1 serviced.
6Operation limit / temperature
Wait a few minutes and allow the motor to cool down. Check the required operating frequency and for mechanical resistance.
7Electronic circuits
Disconnect the power supply for a few seconds, then try again. If the issue persists, arrange servicing; do not guess at a reset procedure.
8Continuous command
Check the timer or for a permanently active control input. This may be expected if the gate is intentionally being held open.

Control unit LEDs

BLUEBUS, STOP, P.P., OPEN, CLOSE

LED / statusMeaning
BLUEBUS is offNo power or a fault. Check the mains supply and fuses.
BLUEBUS stays onSerious fault. Safely disconnect the power supply and check the wiring; if the fault recurs, arrange servicing.
BLUEBUS flashes once per secondNormal operation.
BLUEBUS flashes rapidly twiceInput status change or command received.
BLUEBUS flash sequenceCode as shown in the beacon diagnostics.
STOP is litCorrect STOP status learned.
STOP is not litSTOP status changed or learning is incomplete; check the safety device.
P.P./OPEN/CLOSE is litThe corresponding voltage-free contact is active.
P.P./OPEN/CLOSE is not litThe corresponding contact is not active.

LEDs L1–L8

During normal operation, a lit LED indicates that the Level I function is enabled; an unlit LED indicates that it is disabled. L1 automatic closing, L2 closing after photocell activation, L3 always close, L4 slowdown, L5 Peak, L6 pre-flashing, L7 CLOSE = partial opening, L8 Slave. A single flashing LED may indicate programming; L1/L2 together indicate device learning, and L3/L4 together indicate travel learning.

Reading the error history

  1. Press and hold SET for approximately 3 s, then release it when L1 flashes; use OPEN/CLOSE to select the L8 input.
  2. Hold SET; after approximately 3 s, the LEDs for manoeuvres in which an error was recorded will light up.
  3. While holding SET, use OPEN/CLOSE to select a specific record. L1 is the most recent record; L8 is the eighth and oldest.
  4. Read the selected record's flash count using the beacon diagnostics. Release SET and wait for programming to finish.

Manual release of NICE RUN1800P

Stop the gate, disconnect the power supply and secure it against uncontrolled movement. Only use the release mechanism when the gate leaf is stationary.

1. Slide the release lock cover aside 2. Insert the release key and turn it clockwise
1. Slide the release lock cover aside 2. Insert the release key and turn it clockwise
3. Pull out the release lever 4. The gate can now be moved manually
3. Pull out the release lever 4. The gate can now be moved manually

After moving the gate manually, close the release lever, lock the mechanism with the key and replace the lock cover. Check that the gearbox has re-engaged before restoring power. If the key is the only way to enter during a power outage, keep it accessible from outside the enclosed property.

NICE RUN1800P technical specifications

Values apply to the 230 V AC version of RUN1800P. Rated values apply at approximately 20 °C. Always check the electrical version and permitted mains voltage range on the label of the specific motor.

ParameterValue
ModelRUN1800P – inductive, non-contact limit switch
Type and control unitElectromechanical sliding gate operator, RUA1; plug-in radio receiver not included with the standalone motor.
Motor and mains power supply230 V AC, 50/60 Hz; tolerance as stated on the label of the supplied version.
Max. weight / length1,800 kg / 15 m; additional conditions and cycles as specified in the suitability tables.
Pinion18 teeth, module 4; rack tooth pitch approximately 12.6 mm.
Peak torque / force40 Nm / 1,110 N
Rated torque / force20 Nm / 560 N
No-load speed0.17 m/s at 50 Hz, approximately 10.2 m/min.
Rated speed0.14 m/s at 50 Hz, approximately 8.4 m/min.
Rated frequency with a 15 m gate leaf11 cycles/h, 264 cycles/day at rated torque; additional limits apply depending on length, weight and temperature. This is not the number of cycles that can be performed without a break.
Continuous operationMax. 40 min at rated torque, subject to additional cycle limits. At 50 °C, max. 10 min; with a 15 m gate leaf, max. 7 cycles/h.
Power consumption / currentStarting: 700 W / 3 A; rated: 400 W / 1.8 A.
Electrical protectionClass I – protective earth (PE).
FLASHFor the current configuration ELDC. Bulb load limit: one or two beacons, each 12 V / 21 W; this is not a continuous auxiliary power supply.
S.C.A.24 V DC, max. 4 W, voltage −30 % / +50 %.
Auxiliary power supply24 V DC, −30 % / +50 %, max. 100 mA total; correct STOP/P.P. polarity.
BlueBUSMax. 15 load units; photocells are polarity-independent.
STOPVoltage-free NO/NC contact or 8.2 kΩ resistor; learned status.
P.P., OPEN, CLOSEVoltage-free NO contacts.
Radio / antennaSM connector, receiver selected separately. Antenna input, 52 Ω as specified in the original; RG58 or similar coaxial cable.
Programming8 ON/OFF functions and 8 parameters; Levels I and II.
LearningBlueBUS devices, STOP input type, and travel length with slowdown/partial opening points.
Operating temperature−20 to +50 °C
Ingress protection ratingIP44
Unsuitable environmentsAcidic, saline or potentially explosive atmospheres.
Overall dimensions400 × 255 × 390 mm as shown in the technical table; mounting dimensions are shown in the original drawing below.
Motor weight24.5 kg
Service lifeApproximately 150,000–450,000 cycles, depending on sum of the indexes and graph; not a guarantee.

Drive dimensions

NICE RUN1800P – original dimension drawing

How can I order this item?

Choose the option that suits you:

  1. order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
  2. order by email: place your order at [email protected]

Ask us anything about NICE Run RUN1800P - standalone operator for sliding gates (A)

Product: NICE Run RUN1800P - standalone operator for sliding gates (A)
Name:
Email:
Phone:
Message:
This page is protected by Google reCAPTCHA.