NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg


Product availability: within 3 days

We usually dispatch goods within 3 days.


NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg
NICE-HYKE-HK7224
within 3 days
€414.07 excluding VAT
€509.31 including VAT

 pcs
Weight
9,50 kg

Description of NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg

NICE HYKE HK7224 is an articulated-arm non-reversible drive for one leaf of a swing gate. It has a 24 V DC motor with encoder and an adjustable articulated arm.

HK7224 does not include a control unit. It is the second motor for a double-leaf gate and connects to the drive NICE HYKE HK7024, which controls the entire system. HK7224 must not be connected directly to 230 V. Accessories are wired and configured at the control unit in HK7024.

The drive is designed for leaves 3.5 m or up to 330 kg according to the usage chart. It is also suitable for more intensive use; permitted operation depends on the load, installation and temperature. In the event of a power outage, it can be manually released with a key.

Quick navigation
Choosing a driveAccessories
Motor and control unitKits
InstallationStops
ReleaseWiring
Terminals and polarityPhotocells
Initial startupLearning the positions
SettingsRemote controls
DiagnosticsReset
MaintenanceSpecifications
Service lifePDF manual

Control unit and compatible accessories

A single control unit in the HK7024 controls one or both leaves. The following wiring and programming instructions are for the HKA2R10 with an SM connector, eight L1–L8 LEDs and a 12-position motor selector. Before connecting accessories, check the markings and layout on the actual circuit board.

WhatWhyType
Control unitControls one or two HYKE motors. Motor wiring.
Receiver and remote controlRemote control depends on the receiver's coding. Pairing and commands.
  • OXIBD into the SM connector + ON2E or MYGO4. The transmitter and receiver must use a compatible radio system.
Safety photocellsProtects the passageway depending on the installation location. Wiring and addressing.
  • NICE EPMB to BlueBUS. Two wires, with no polarity; each pair has its own address.
Warning beaconSignals movement and faults. FLASH output.
  • NICE ELDC for low voltage; in beacon mode, FLASH supplies 12 V DC, up to 21 W. A 230 V beacon must not be connected here.
Safety edgeProtects hazardous areas when an obstacle is contacted. STOP input.
  • Safety edge selection with a suitable 8.2 kΩ output; choose the wiring according to the risks posed by the specific gate.
Key switch controlSwitches a command input without voltage. SbS, OPEN and CLOSE inputs.
  • NICE KIO with NO contact. The backlight must be powered separately, within the permitted power draw.
External releaseManual opening if you cannot reach the drive during a power outage.
Backup powerSeveral operating cycles during a power outage. Battery selection and connection.
  • NICE PSS124 with the cable for the correct generation. Connect the battery to the HK7024 control unit, not directly to the HK7224.
Electric lockAdditional locking of the gate leaf, depending on its configuration. ELS output.
  • Lock for 12 V AC, max. 15 VA. The output must remain configured for an electric lock, not a light.

Separate gate motor and control unit

ModelWhat's included and how it's used
HK7024Articulated-arm drive with mounting brackets, manual release and built-in control unit. It operates one gate leaf, or two leaves when paired with the HK7224.
HK7224Articulated-arm drive with manual release, without its own control unit. The control unit in the HK7024 operates the second leaf.
Standalone drive and kitA receiver, remote control, photocells, warning light and backup battery are not automatically included with every standalone motor. Check the contents of the specific kit.

Kits for one or two gate leaves

Kits include a receiver OXIBD and a remote control ON2E. The version with photocells adds EPMB; the version with accessories also includes ELDC. Two motors do not increase the limit for a single gate leaf.

One gate leafStandalone driveTwo gate leaves

NICE HYKE kit for 1 gate leaf

1 × HK7024. One HKA2R10 control unit.

Standalone HK7224

Standalone NICE HYKE HK7224 drive

One motor. No control unit.

NICE HYKE kit for 2 gate leaves

1 × HK7024 + 1 × HK7224.

Gate leaf length and weight, and space for the drive

3.5 m and 330 kg are separate maximum limits. With the arm at full length, the permitted limits are a 3.5 m gate leaf weighing up to 200 kg, or a gate leaf weighing up to 330 kg and measuring no more than 1.8 m. Read intermediate values from the graph using the length and weight of a single gate leaf.

Permitted NICE HYKE gate-leaf length and weight – full and shortened arm

A = full-length arm, B = shortened arm. The horizontal axis shows gate-leaf length in metres; the vertical axis shows weight in kilograms. With the shortened arm, use the lower curve B and an opening angle of no more than 90°. Do not apply the full-length arm limits to the shortened arm.

The drive requires a clear mounting space at least 210 mm. Check the entire arm travel and clearance from the wall or fence; the dimensions below define the mounting geometry, not a universal post size.

Mounting the brackets and articulated arm

Disconnect the mains and any battery before starting work. The gate must move easily throughout its travel, must not open or close by itself, and its fixings must not flex or give way.

The motor mounting bracket must be level and fixed to a solid surface. Secure the arm bracket to the gate leaf's supporting frame, not to a weak infill panel. Choose a position that allows safe access to the key and release lever. The installation area must not be prone to flooding; mount the drive higher above ground if necessary. Route the cables so that water and condensation cannot enter the drive.

Dimension E and clearance for the full HYKE arm travel

Dimension EArm selection
E at least 650 mmFull arm length; determine the angle and distances A/B from the installation graph.
E from 300 to 650 mmShortened arm; opening angle no greater than 90° and stricter gate-leaf weight limits.
E less than 300 mmThe installation shown is not permitted. Choose a different position or another suitable solution.

A is the position of the drive bracket relative to the hinge axis; B is the offset of the hinge axis from the mounting surface, as shown in the diagrams. Both values are in millimetres.

Determining mounting dimension A on the HYKE drive bracket

Determining the hinge offset and mounting dimension B for HYKE

Original HYKE installation graph – dimension A, dimension B and opening angle

  1. Measure B and select the required opening angle. The maximum opening angle with the full-length arm is 110°.
  2. On the graph, draw a horizontal line from value B to the area for the required angle. Read the permitted range for A from the intersection points. For example, with B = 200 mm and an opening angle of 110°, A is approximately 300–345 mm.
  3. Assemble the straight and curved arms using the pins and retaining rings. After installation, the motor and gate-leaf brackets must be level with each other.
  4. Use the motor bracket as a template, mark four fixing points and secure it with suitable anchors. Secure the motor to the bracket using the two supplied screws.
  5. Disengage the motor. With the arm fully extended, position the bracket on the gate leaf so that the arm is as extended as possible and stops at its end position. Fit the bracket horizontally and secure the pin and retaining ring.
  6. Move the gate through its full range by hand. The arm must not hit the wall, fence or gate leaf, and its movement must not create any unguarded trapping or shearing points. Then adjust the stops and re-engage the motor.

Assembling the HYKE arm, pins and retaining rings

Horizontal installation of the HYKE motor bracket

Correct bracket position on the load-bearing part of the gate leaf with the arm fully extended

Installation with a shortened arm

With a shortened arm, select A in the 90°–95° range on the installation graph; the actual gate opening must not exceed 90°. With the motor disengaged, position the bracket on the gate leaf by pressing the bent arm against the closed leaf until it reaches its end position. Maintain E at 300 mm or more, limit the opening to 90° and follow the lower limit curve. During a manual test opening, hold the bracket against the gate leaf and check that the bent arm and its joint do not hit any obstacles. Secure the bracket only after checking the full range of movement.

Clearance check with a shortened HYKE arm

Mechanical opening and closing stops

  1. Disengage the motor and move the gate leaf by hand to the required open position.
  2. On the underside of the motor, turn plastic disc A and align the opening beneath the arm as shown.
  3. Insert stop B in the nearest suitable position. It must engage correctly; compare the OK/NO markings.
  4. Turn the disc so the stop cannot fall out. Make fine adjustments using adjusting screw C.
  5. If the gate has no ground-mounted closing stop, set the closing stop in the same way. Finally, tighten nut D securely so the disc cannot turn on its own.
  6. After changing the stop positions, carry out a new position-learning procedure and tests.

Position of disc A when inserting the HYKE mechanical stop

Correct engagement of the HYKE stop – OK and NO examples

Adjusting the stop with screw C and securing it with nut D

Manual release in the event of a power failure

Stop the gate and disconnect the power before releasing the motor. Make sure the gate leaf cannot move on its own; keep it under control in windy conditions.

  1. Insert key A and turn it 90° clockwise.
  2. Turn the extended lever B 90° counterclockwise. The gate leaf can now be moved by hand.
  3. To re-engage the drive, return the lever to the vertical position and push it into its seat. Turn the key 90° counterclockwise and remove it.
  4. After retracting the lever, move the gate leaf by hand a few centimetres in the opening direction to fully engage the gear drive. Before operating electrically, check that the lever is fully retracted and the drive is engaged. If a safety device is faulty, do not operate the gate until the cause has been rectified.

Release key A and lever B for the NICE HYKE drive

Electrical connections for motors and accessories

Disconnect both the 230 V mains supply and the backup battery before opening the cover. Check the power supply and protective earthing. The supply circuit must include a device that allows complete disconnection, and the cables must be secured against being pulled out.

Open the HK7024 cover, lift the control unit and route the cables through the lower entry. Secure the mains supply cable with a cable clamp. HK7224 receives motor power and a separate encoder cable from the HK7024 control unit.

CableCross-section and maximum length
Mains supply to HK70243 × 1.5 mm², up to 30 m. For longer supply cables, use 3 × 2.5 mm² and provide protective earthing at the automation system as specified in the installation design.
Second motor HK72243 × 1.5 mm², up to 10 m. Two motor conductors and a protective conductor, as indicated at the motor terminals.
Second motor encoder cable2 × 1 mm², up to 10 m. The motor and encoder cables can be replaced by a single 5 × 1.5 mm² cable; connect each conductor to the corresponding terminal.
BlueBUS2 × 0.5 mm², up to 20 m; for lengths over 20 m and up to 40 m, use 2 × 1 mm².
Flashing light2 × 0.5 mm², up to 20 m.
AntennaShielded RG58, up to 20 m; a length of less than 5 m is recommended.
OPEN/CLOSE switchTwo 2 × 0.5 mm² cables or one 4 × 0.5 mm² cable, up to 50 m.
Electric lock2 × 1 mm², up to 6 m.

Securing the power cable and routing cables into the HYKE drive

M1, M2 and encoders

M2 is the gate leaf that opens first; M1 is the one that closes first. For a single-leaf installation, use the M2 output and the corresponding ENC2 input; M1 is not used. For a two-leaf installation, connect each motor to its own encoder. Use the standard HK7224 motor specified for this configuration.

At the motor terminals, connect the motor conductors to the outer terminals marked M; connect the protective conductor to the terminal marked with the earth symbol. Connect the encoders to the corresponding pairs of terminals ENC1/ENC2, with no polarity requirement. To correct the direction of travel, disconnect the power and swap only the outer motor conductors for that motor, not the protective conductor.

HKA2 control unit diagram

HKA2 control unit – motor outputs, encoders and accessory wiring

Legend:

  • FLASH = flashing light
  • EL/ELS = electric lock
  • OGI = open-gate indicator
  • TX/RX = photocell transmitter/receiver
  • NO = normally open contact
  • NC = normally closed contact.

The diagram shows the inputs and their functions; select the equipment according to the specific configuration.

Accessory terminals, voltage and polarity

TerminalFunction and wiring
Auxiliary power supplySbS (+) and STOP (−), 24 V DC, maximum 200 mA combined. Use the auxiliary power contact at the SbS terminal as positive and the auxiliary power contact at the STOP terminal as negative. Check the corresponding contacts on the installed board before wiring; the complete pair of command-input terminals is not a power output. This is for powering low-power accessories, not the motor, flashing light or electric lock.
BlueBUSTwo conductors for both communication and power; no +/− polarity. Up to 15 BlueBUS devices, depending on their power consumption. EPMB are connected in parallel.
FLASHFor the flashing-light function 12 V DC, maximum 21 W; suitable ELDC. Connect the DC power supply according to the markings on the specific terminals and device. Do not infer the polarity from a neighboring output; if the markings on the board are unreadable, verify the wiring before connecting.
ELS12 V AC, max. 15 VA for the electric lock; AC has no positive or negative polarity. With L5 = ON, it switches to a lighting output 24 V DC (−30/+50 %), max. 4 W. When changing the function, choose a device rated for this voltage and observe its DC polarity.
OGIGate-open indicator 24 V DC (−30/+50 %), max. 4 W; can be used to control a small relay. With L8 = ON, it switches to a maintenance indicator. For a device with specified DC polarity, check the output markings on the actual board.
SbSStep-by-step command via voltage-free NO contact, non-polarized. Do not supply external voltage to the input.
OPEN / CLOSEOpen / close via voltage-free NO contacts, non-polarized. CLOSE can be changed to partial opening with L7 = ON.
STOPInput: NC, NO or 8.2 kΩ, depending on the learned device. This is not a universal power-supply pair; the contact wiring is described below.

BlueBUS, STOP, SbS, OPEN and CLOSE terminals on the HYKE control unit

Auxiliary power and command contacts serve different functions. Do not power accessories through both contacts of an SbS or STOP pair, and do not short the pair when drawing power. On the HKA2R10, auxiliary power remains available even when Standby is enabled.

STOP, safety edge and pedestrian gate

When the learned status changes, STOP immediately halts movement and briefly reverses it. Connect multiple NO contacts in parallel and multiple NC contacts in series. Design the wiring for resistive safety edges according to the specific device; do not combine them with an arbitrary jumper.

If the gate leaf has a pedestrian gate, its monitoring contact must prevent powered movement while the pedestrian gate is open. After every change to the STOP wiring, perform device learning and safety tests. Photocells and a safety edge protect different hazard areas; one does not automatically replace the other.

BlueBUS photocells

Both the TX transmitter and RX receiver of the photocells EPMB connect with two wires to non-polarized BlueBUS. Each pair must have the same addressing on TX and RX, and different addressing from the other pairs. Repeat device learning after connecting or removing a device.

Positions of PHOTO, PHOTO1 and PHOTO2 safety photocells on the HYKE swing gate

AddressProtection and response
PHOTO / PHOTO IIPHOTO at approximately 50 cm, PHOTO II at approximately 100 cm; outer pairs. During closing, it stops and reverses movement.
PHOTO1 / PHOTO1 IIPHOTO1 at approximately 50 cm, PHOTO1 II at approximately 100 cm; inner pairs. During closing, it stops and reverses movement; during opening, it stops and resumes when the beam is clear.
PHOTO2 / PHOTO2 IIProtection of the opening area. During opening, it stops and reverses movement.
PHOTO3Not permitted for this HYKE wiring configuration.

The jumper positions must match the selected function, not just the photocell's physical mounting location. For complete addressing and wiring details, see also the EPMB data sheet.

First start-up and control unit check

All buttons and LEDs mentioned below are on the control unit in the HK7024. The HK7224 has no user programming. Before connecting the power supply, ensure that the cables, stops, covers and safety devices are securely fitted.

  1. Set the gate leaves approximately halfway along their travel, secure the motor gears and clear the movement area.
  2. After connecting the power supply, the BlueBUS LED should flash approximately once per second. The LEDs on both the TX and RX photocells must indicate power, and the FLASH warning light should be off at rest.
  3. If the power supply is missing or unusual, switch off the unit and check the wiring and fuses. Do not proceed with learning if a problem has been detected.
  4. Before learning the positions, select the correct motor using the selector and perform device learning.

12-position motor type selector

For standard motors For HK7024 + HK7224, set DIP 10 = ON and all other positions 1–9, 11 and 12 = OFF. On Oview, this corresponds to the HYKE designation. Adjust the selector with the power off, and always do so before learning the positions. The setting for HYKE HS does not apply here.

HKA2 selector – standard HYKE is the top row for HK7024

BlueBUS and STOP device learning

  1. Press and hold simultaneously Open ▲ + Stop/Set.
  2. When L1 and L2 start flashing rapidly, after approximately 3 seconds, release both buttons.
  3. Wait for detection to finish. STOP must be lit and L1/L2 must be off. L3/L4 may start flashing to indicate that position learning is required.
  4. Learning is required even when no photocells are connected, and every time a device is added or removed. Then repeat the safety tests.

Learning the gate leaf positions

Devices must be learned first, and the motor selector must be set correctly. The mechanical stops must be secure, and the force must be appropriate for the gate. During learning, monitor both motors and the entire movement area.

Automatic learning

  1. Press and hold simultaneously Stop/Set + Close ▼.
  2. When L3 and L4 start flashing rapidly, after approximately 5 seconds, release the buttons.
  3. The control unit slowly closes M1 to its stop, slowly closes M2 to its stop, slowly opens M2 and M1 to their stops, and finally quickly closes both gate leaves. With a single motor, only the corresponding M2 gate leaf is learned.
  4. Successful completion is confirmed when both L3 and L4 go out. Then check several normal opening and closing cycles.
  5. If the direction or sequence is incorrect, stop the movement using the Open or Close button. Disconnect both mains power and the battery before making repairs. If M1/M2 are swapped, also swap their encoders; if the direction is incorrect, swap the specific motor's outer operating wires.
  6. If a photocell or STOP is triggered, learning is interrupted and L1 flashes. After resolving the cause, repeat the procedure from the beginning.

Open, Stop/Set and Close buttons on the HYKE control unit

Manual learning and position definitions

Manual learning lets you set the positions individually. Briefly pressing Open/Close switches the LED; holding the button moves the motor. Position 0 is the closing stop, position 1 is the opening stop, and A is the required intermediate opening stop.

LED – positionWhat is stored
L1 – 0/M1Fully closing gate leaf M1 against the mechanical stop.
L2 – 0/M2Fully closed position of leaf M2 against the mechanical stop.
L3 – SA/M2Opening delay: once this position is passed, M2 can start opening M1.
L4 – A/M1Required stop position for opening M1.
L5 – A/M2Required stop position for opening M2.
L6 – SC/M1Closing delay: once this position is passed, M1 can start closing M2.
L7 – 1/M1Fully open position of M1 against the mechanical stop.
L8 – 1/M2Fully open position of M2 against the mechanical stop.

Positions 0, 1, A and SA/SC delays for two HYKE leaves

  1. Press Stop/Set + Close and release as soon as L1 starts flashing, after approximately 3 seconds. For manual learning, do not wait for L3/L4, which start automatic learning.
  2. Press and hold Open or Close to move the selected motor to the required position. Release the button to stop the movement.
  3. To save, hold Stop/Set for at least 3 seconds. While you hold it, the corresponding LED lights steadily after approximately 2 seconds. Release the button only after at least 3 seconds; the next LED will then start flashing.
  4. Continue through L8. Keep the interval between presses under 10 seconds; a longer interval ends the procedure and retains the changes saved so far.

With one motor, M2: Confirm unused positions L1 and L7 by holding Stop/Set for at least 3 seconds. Skip L3, L4 and L6 with a brief press of Open/Close. Save positions L2, L5 and L8 for the actual M2 leaf.

Mixed learning

First, perform automatic learning. Then enter manual mode by pressing Stop/Set + Close and releasing when L1 flashes. Briefly press Open/Close to select a position, adjust it by moving the leaf, and save it as in manual learning. Use this method to adjust A, SA and SC; leave the end positions 0 and 1 as learned from the stops. To end the procedure, switch to the flashing LED after L8.

Tests before handover

  • After disconnecting all power sources, release the motor and check manual movement along the entire travel path. For the test, the manufacturer specifies a maximum of 390 N for manual movement; this figure does not replace drive selection or impact-force measurement.
  • After securing the motor and restoring power, check opening, closing, stopping, slow-down and correct overlap of the leaves.
  • Test each photocell, safety edge and gate control contact individually. Remove all crushing and shearing hazards in the area around the arms.
  • Verify the forces, and hand over the user manual, release procedure and maintenance schedule. Use the gate only after all tests have been completed successfully.

HKA2R10 control unit settings

Open ▲ selects or opens, Stop/Set stops and confirms, Close ▼ selects or closes. The fourth button is not used. Holding Stop/Set for more than 5 seconds opens programming mode when L1 flashes.

Level I – turning functions on and off

  1. Hold Stop/Set until L1 starts flashing, then release.
  2. Use Open/Close to select the LED for the required function. Briefly press Stop/Set to change the state: short flash = OFF, long flash = ON.
  3. Repeat the selection and change for the next function. To save and exit, do not press any button for 10 seconds.

LED – function and meaningState
L1 – Automatic closing
ON: after opening, the gate closes after the set pause. OFF: semi-automatic operation. The factory-set pause is 30 s.
ON / OFF
Factory setting: OFF
L2 – Close after photocell activation
ON: if automatic closing is enabled, photocell activation reduces the pause to 5 s. If automatic closing is disabled, activation starts closing after the set pause.
ON / OFF
Factory setting: OFF
L3 – Always close
ON: if power is restored while the gate is open, the control unit starts closing after 10 s, with a 5 s pre-flash warning. OFF: the gate does not start moving automatically when power is restored.
ON / OFF
Factory setting: OFF
L4 – Standby all
ON: approximately 1 minute after movement, BlueBUS and most LEDs switch off; a command restores operation after a short delay. OFF: this power-saving mode is disabled. The auxiliary SbS/STOP power supply on R10 remains available.
ON / OFF
Factory setting: OFF
L5 – ELS as a light
ON: the ELS output functions as a light at 24 V DC (−30/+50 %), up to 4 W. OFF: ELS controls an electric lock at 12 V AC, up to 15 VA. Adapt the equipment and wiring to the selected function.
ON / OFF
Factory setting: OFF
L6 – Pre-flashing
ON: the warning light flashes for 3 s before movement. OFF: it starts flashing at the same time as movement begins.
ON / OFF
Factory setting: OFF
L7 – CLOSE as partial opening
ON: the CLOSE input issues a partial opening 1 command. OFF: it issues a close command.
ON / OFF
Factory setting: OFF
L8 – OGI as a maintenance indicator
ON: OGI signals when maintenance is due. OFF: OGI signals that the gate is open. The limit is set at Level II/L7.
ON / OFF
Factory setting: OFF

Level II – adjustable parameters

  1. Hold Stop/Set until L1 starts flashing, then release.
  2. Use Open/Close to select the input LED for the required parameter.
  3. Hold Stop/Set. After approximately 3 s, the value LED for the current setting lights up. While continuing to hold Stop/Set, move it using Open or Close.
  4. Release Stop/Set. To save and exit, do not press any button for 10 seconds.

The bold value is the HKA2R10 factory setting. The input LED identifies the parameter; the value LED identifies its setting. The same LED number in both columns does not necessarily mean the same thing.

Input LED – name and descriptionSetting LED – value
L1 – Pause time
Time before automatic closing; effective only when closing is enabled.
L1 – 5 s
L2 – 15 s
L3 – 30 s
L4 – 45 s
L5 – 60 s
L6 – 80 s
L7 – 120 s
L8 – 180 s
L2 – Step-by-step mode
Sequence for SbS and related commands; L4, L5, L7 and L8 also change OPEN/CLOSE behavior.
L1 – Open – stop – close – stop
L2 – Open – stop – close – open
L3 – Open – close – open – close
L4 – Condominium mode: while opening, SbS/OPEN has no effect; CLOSE reverses to closing. While closing, SbS/OPEN reverses to opening; CLOSE has no effect.
L5 – Condominium mode 2: responses as in L4; holding the command for more than 2 s triggers STOP.
L6 – Step-by-step mode 2: a command shorter than 2 s triggers partial opening.
L7 – Hold-to-run: movement occurs only while the command is held; it stops when released.
L8 – Semi-automatic opening; closing only while the command is held.
L3 – Motor speed
Normal operating speed; after changing it, check safety, forces and deceleration.
L1 – Very slow
L2 – Slow
L3 – Medium
L4 – Fast
L5 – Very fast
L6 – Maximum
L7 – Opens quickly, closes slowly
L8 – Opens at maximum speed, closes at medium speed
L4 – Pressure relief after closing
A brief reverse movement relieves residual pressure, keeps the gate properly closed and makes manual release easier.
L1 – No pressure relief
L2 – Level 1 – minimum, approximately 100 ms
L3 – Level 2
L4 – Level 3
L5 – Level 4
L6 – Level 5
L7 – Level 6
L8 – Level 7 – maximum, approximately 800 ms
L5 – Motor force
Force of both motors. A higher setting is not a substitute for correcting friction; impact-force testing is required after making a change.
L1 – Level 1 – minimum
L2 – Level 2
L3 – Level 3
L4 – Level 4
L5 – Level 5
L6 – Level 6
L7 – Level 7
L8 – Level 8 – maximum
L6 – Pedestrian and partial opening
For pedestrian opening, M2 moves. For both leaves, the fractions refer to the smaller of their learned angles.
L1 – Pedestrian 1 – M2 to 1/4
L2 – Pedestrian 2 – M2 to 1/2
L3 – Pedestrian 3 – M2 to 3/4
L4 – Pedestrian 4 – full opening of M2
L5 – Partial 1 – both leaves to 1/4 of the smaller angle
L6 – Partial 2 – both leaves to 1/2 of the smaller angle
L7 – Partial 3 – both leaves to 3/4 of the smaller angle
L8 – Partial 4 – both leaves to the smaller learned angle
L7 – Maintenance alert
Number of operations before the alert. This does not replace regular servicing at the recommended intervals.
L1 – 500
L2 – 1,000
L3 – 1,500
L4 – 2,500
L5 – 5,000
L6 – 10,000
L7 – 15,000
L8 – 20,000
L8 – Fault history
Displays the result of the last eight operations. After selecting, count the BlueBUS flashes and refer to the diagnostic table.
L1 – 1st operation – most recent
L2 – 2nd operation
L3 – 3rd operation
L4 – 4th operation
L5 – 5th operation
L6 – 6th operation
L7 – 7th operation
L8 – 8th operation – oldest

After changing force, speed or positions, check the full travel path, photocells, STOP input and impact forces. Automatic closing must be appropriate for the safety measures and use of the specific gate.

Radio receiver and remote controls

The radio receiver plugs into the connector SM on the HK7024 control unit. Disconnect all power sources before inserting or removing it. The HK7224 does not require a separate radio receiver.

Inserting the radio receiver into the SM connector on the HYKE control unit

Current kits use NICE OXIBD and ON2E. OXIBD also supports compatible bidirectional remote controls; MYGO4 is a standard rolling-code remote control. With an older receiver, choose a transmitter that matches its coding system.

Receiver outputHYKE command
1SbS – step-by-step mode according to parameter II/L2.
2Partial opening 1 according to parameter II/L6; factory setting: full opening of M2.
3OPEN – open.
4CLOSE – close.

In Mode I, the entire remote control is memorised; in Mode II, an individual button is assigned to the selected command. Storage and deletion are performed using the button on the receiver, not by resetting the control board. For exact button presses, timings and confirmations, see the NICE remote control pairing guide and the OXIBD product sheet. Extended mode may offer more commands; select the command number according to the receiver.

Backup battery and control unit generation

The backup battery fits in the dedicated compartment in the HK7024. One compatible battery powers the system through its control unit; it must not be connected directly to the HK7224 motor terminals.

InstallationCorrect selection
HKA2R10The older version uses PS124. Current PSS124 connects using a cable intended for the older compatible control unit; the PSS124 package includes cables for both R10 and R30.
Newer control unitPSS124 with the appropriate connector. The older PS124 requires a CABLA11 adapter and Standby to be switched off; choose the connection according to the markings on the actual control board.

  1. Disconnect the mains supply and any existing battery. Remove the cover and lift the control unit.
  2. Insert the battery into the designated compartment and use the correct cable for the relevant generation. Do not confuse the connector with the motor output.
  3. Connect the battery electrically only after installation and programming are complete. Check its operation with the mains switched off, then restore power to recharge the battery.

Backup battery compartment beneath the HYKE control unit

The number of cycles during a power failure depends on the battery condition, temperature and load. The battery does not replace the available manual release. Solemyo solar power is connected via the designated power input on a compatible control unit; the mains and solar power source must not be connected at the same time.

Diagnostics and troubleshooting

The warning light flashes regularly while the gate is moving. In the event of a fault, it emits a short series of flashes, pauses for approximately 1 s, then repeats the same series. Count the short flashes before resetting or changing the settings.

Number of flashesCause and next step
1BlueBUS – a device is missing or has been changed. Check the wiring and addressing; after making changes, perform device learning.
2The photocell is blocking movement. Remove the obstruction, clean the covers and check the TX/RX settings. Photocells.
3Resistance to movement or force limit triggered. Check the gate leaf, hinges and arm; do not increase the force without first addressing the cause and carrying out new tests.
4STOP triggered. Check the edge, the gate contact and the learned input status. STOP wiring.
5Internal control unit parameters. Wait at least 30 s, try a command and restore power if necessary. If the problem recurs, servicing is required.
6The limit for consecutive cycles or cycles per hour has been exceeded. Let the operator cool down for a few minutes and reduce its use.
7Electrical fault. Wait at least 30 s and restore power if necessary; if the fault recurs, arrange for servicing.
8A continuously active command is preventing further commands. Check the button, switch and any timer.
9The system is locked by an electronic Stop automation command. Use the relevant Unlock automation command; this is not a mechanical release lever.
10The encoder has detected an obstruction or excessive friction. Check the mechanism, encoder assignment and wiring. M1/M2 and ENC1/ENC2.

Checking the LEDs on the control board

LEDNormal status or next step
BlueBUSApproximately 1 green flash/s = normal operation. When Standby is enabled, it flashes more slowly; normal operation resumes after a command. Two quick flashes = input status change. If there is no light, check the power supply and fuses; troubleshoot a steady light or red flash sequences using the diagnostics.
STOPOn = safe status learned. Off = input triggered or changed.
SbS / OPEN / CLOSEOff at rest, on while a command is active. A continuously lit LED may indicate a held or faulty contact.
L1/L2 flash slowlyRequest for device learning.
L3/L4 flash slowlyRequest for position learning.

If the motor runs but the gate leaf does not move, check that the release lever is fully engaged. If the HK7224 does not respond or moves incorrectly, check its M1/M2 output and the corresponding encoder in the HK7024. When replacing a fuse, first eliminate the cause; use the same type and rating.

Resetting the control unit settings

Resetting will erase the custom HKA2 settings. This does not pair remote controls or erase the radio memory of a separate receiver.

  1. On the HK7024 control unit, press and hold Open ▲ + Close ▼, until L1 and L2 start flashing.
  2. Release both buttons.
  3. After resetting, check the selector again, learn the devices and positions, set the functions and carry out safety tests.

Maintenance and safe use

Schedule a professional inspection no later than 6 months or 20,000 cycles after the previous inspection, whichever comes first. Choose a shorter interval for intensive or adverse operating conditions.

  • Before servicing, disconnect the mains, battery and any other power source.
  • Check that the brackets, screws, pins, retaining rings, arms, stops, cover and cable glands are secure. Replace any damaged or worn parts.
  • Check that the gate moves easily by hand, the release is engaged, and all photocells, safety edges and gate contacts work correctly.
  • Do not enter the gate's path or touch the arms while it is moving. Keep remote controls out of children's reach.
  • The customer may keep the photocell covers clean and remove debris from the gate's path. If there is a mechanical or electrical fault, do not use the operator and contact service.

Estimated service life

Add the indices for length, weight and all other relevant factors. Then use the graph to find the estimated number of cycles with regular maintenance. The horizontal axis shows the sum of the indices in %, and the vertical axis shows the number of cycles. This estimate does not guarantee a number of years or cycles.

Characteristics of the complete automation systemIndexService life graph
FactorFull-length / shortened arm

Original HYKE estimated service life graph – stress index and number of cycles

LengthLess than 1.8 m: 0 / 15 %
1.8–2.5 m: 15 / 20 %
2.5–3.0 m: 20 / 30 %
Over 3.0 up to 3.5 m: 30 % / not applicable
WeightLess than 200 kg: 0 / 30 %
200–250 kg: 20 / 40 %
Over 250 kg: 30 % / not applicable
Temperature / humidityOver 40 °C or below 0 °C, or humidity over 80 %: 20 / 20 %
Solid infill15 / 20 %
Windy location15 / 20 %

First check the suitability of the gate against the weight and length chart and installation geometry. If a value falls on the boundary between two ranges, choose the higher available numerical index. At a length of 3.0 m, the shortened arm is permitted only for a weight corresponding to curve B; do not use it for lengths over 3.0 m. Always assess the entire installation.

Technical specifications and dimensions

ParameterNICE HYKE HK7224
Control unitNo control unit; controlled by the HK7024.
Power supply24 V DC ±10% from the HK7024 control unit.
No-load speed1.5 rpm; adjustable speed settings.
TorqueMaximum 500 Nm; rated 120 Nm.
Maximum cycle frequency40 cycles/h at rated torque; 25 cycles/h at the maximum operating temperature.
Continuous operationUp to approximately 7 minutes at rated torque.
Maximum power consumption140 W for the second motor.
Maximum current draw6 A for a maximum of 2 s.
Ingress protection ratingIP54 with the cover intact.
Operating temperature−20 to +55 °C; drive efficiency decreases in cold conditions.
Dimensions210 × 290 × 320 mm (width × depth × height).
Drive weight9.5 kg.
Limit per gate leafWith the full-length arm: 3.5 m / 200 kg or 1.8 m / 330 kg; intermediate values and the shortened arm are subject to the chart.

Width, depth and height of the NICE HYKE operator

How can I order this item?

Choose the option that suits you:

  1. order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
  2. order by email: place your order at [email protected]

Ask us anything about NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg

Product: NICE Hyke HK7224 - swing gate operator without control unit for a gate leaf up to 3.5 m/330 kg
Name:
Email:
Phone:
Message:
This page is protected by Google reCAPTCHA.