NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg


Product availability: within 3 days

We usually dispatch goods within 3 days.


NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg
NICE-HYKE-HK7024
within 3 days
€558.63 excluding VAT
€687.11 including VAT

 pcs
Weight
11 kg

Description of NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg

NICE HYKE HK7024 is articulated non-reversible drive for one leaf of a swing gate. It has a 24 V DC motor with an encoder and an adjustable articulated arm.

HK7024 includes a control unit and is suitable for a single-leaf gate. For a double-leaf gate, it also controls the second motor NICE HYKE HK7224, which does not include its own control unit. HK7024 connects to a 230 V AC mains supply; the motors themselves run on 24 V DC.

The drive is designed for leaves up to 3.5 m long or weighing up to 330 kg according to the application chart. It is also suitable for more intensive use; the permitted duty cycle depends on the load, installation and temperature. In the event of a power failure, it can be manually released with a key.

Quick navigation
Choosing a driveAccessories
Motor and controlKits
InstallationStops
ReleaseWiring
Terminals and polarityPhotocells
Initial start-upLearning the positions
SettingsRemote controls
DiagnosticsReset
MaintenanceSpecifications
Service lifePDF manual

Control unit and compatible accessories

A single control unit in the HK7024 controls one or both leaves. The following wiring and programming instructions are for the HKA2R10 with an SM connector, eight LEDs L1–L8 and a 12-position motor selector. Before connecting accessories, check the markings and layout of the actual control board.

WhatWhyType
ControlControls one or two HYKE motors. Motor wiring.
Receiver and remote controlRemote control matched to the receiver's coding. Pairing and commands.
  • OXIBD into the SM connector + ON2E or MYGO4. The transmitter and receiver must use a compatible radio system.
Safety photocellsProtects the passageway, depending on the installation position. Wiring and addressing.
  • NICE EPMB to BlueBUS. Two wires, no polarity; each pair has its own address.
Warning lightSignals movement and faults. FLASH output.
  • NICE ELDC for low voltage; when used for a warning light, FLASH is 12 V DC, max. 21 W. A 230 V warning light must not be connected here.
Safety edgeProtects hazardous areas if the gate contacts an obstacle. STOP input.
  • Choosing a safety edge with a suitable 8.2 kΩ output; choose the wiring according to the risks posed by the specific gate.
Key-switch controlSwitches a command input without voltage. SbS, OPEN and CLOSE inputs.
  • NICE KIO with NO contact. The backlighting is powered separately, subject to the permitted current draw.
External releaseManual opening if you cannot reach the operator during a power outage.
Backup powerSeveral operating cycles during a power outage. Battery selection and connection.
  • NICE PSS124 with the cable for the correct generation. The battery connects to the HK7024 control unit, not directly to the HK7224.
Electric lockAdditional locking of the gate leaf, depending on its design. ELS output.
  • Lock for 12 V AC, max. 15 VA. The output must remain configured for an electric lock, not a light.

Standalone gate operator and controls

ModelWhat’s included and how it’s used
HK7024Operator with articulated arm, mounting brackets, manual release and built-in control unit. Operates one gate leaf, or two leaves when paired with the HK7224.
HK7224Operator with articulated arm and manual release, without its own control unit. The control unit in the HK7024 operates the second leaf.
Standalone operator and kitA receiver, remote control, photocells, warning light and backup battery are not automatically included with every standalone operator. Check the equipment included in the specific kit.

Kits for one or two leaves

Kits include a receiver OXIBD and remote control ON2E. The version with photocells also includes EPMB; the version with accessories also includes ELDC. Two operators do not increase the limit for a single leaf.

One leafStandalone operatorTwo leaves

NICE HYKE kit for 1 leaf

1 × HK7024. One HKA2R10 control unit.

Standalone HK7024

Standalone NICE HYKE HK7024 operator

One motor. With control unit.

NICE HYKE kit for 2 leaves

1 × HK7024 + 1 × HK7224. One HKA2R10 control unit.

Leaf length, weight and operator clearance

3.5 m and 330 kg are separate maximum limits. With the full-length arm, the permitted leaf is either 3.5 m long and up to 200 kg, or up to 330 kg with a length of no more than 1.8 m. Read intermediate values from the graph according to the length and weight of a single leaf.

Permitted length and weight of a NICE HYKE gate leaf – full-length and shortened arm

A = full-length arm, B = shortened arm. The horizontal axis shows leaf length in metres; the vertical axis shows its weight in kilograms. When shortening the arm, use the lower curve B and limit opening to 90°. Do not apply the full-length arm limits to the shortened arm.

The operator requires a clear mounting space at least 210 mm. Check the entire arm travel and the clearance from the wall or fence; the dimensions below define the installation geometry, not a universal post size.

Mounting the brackets and articulated arm

Disconnect the mains and any backup battery before starting work. The gate must move freely throughout its travel, must not open or close by itself, and its fixings must not flex or loosen.

The operator mounting bracket must be level and fixed to a solid surface. Secure the arm bracket to the load-bearing frame of the gate leaf, not to a weak infill panel. Choose the mounting position so the key and release lever remain safely accessible. The installation area must not be prone to flooding; if necessary, mount the operator higher above ground level. Route the cables so water and condensation cannot run into the operator.

Dimension E and clearance for the full HYKE arm movement

Dimension EArm selection
E at least 650 mmFull-length arm; determine the angle and dimensions A/B from the installation graph.
E from 300 to 650 mmShortened arm; opening limited to 90° and stricter limits on gate-leaf weight.
E less than 300 mmThe installation shown is not permitted. Choose a different position or another suitable solution.

A is the position of the operator bracket relative to the hinge axis; B is the offset of the hinge axis from the mounting surface, as shown in the diagrams. Both values are in millimetres.

Determining mounting dimension A for the HYKE operator bracket

Determining the hinge offset and mounting dimension B for HYKE

Original HYKE installation graph – dimension A, dimension B and opening angle

  1. Measure B and select the required opening angle. With the full-length arm, the maximum is 110°.
  2. On the graph, draw a horizontal line from the value of B into the area for the required angle. Read the permitted range of A from the intersection points. For example, with B = 200 mm and an opening angle of 110°, A is approximately 300–345 mm.
  3. Assemble the straight and curved arms with the pins and retaining rings. After installation, the motor and gate-leaf brackets must be level with each other.
  4. Use the motor bracket as a template, mark four fixing points, and secure it with suitable anchors. Attach the motor to the bracket using the two supplied screws.
  5. Release the motor. With the arm fully extended, position the bracket on the gate leaf so that the arm stops at its end position. Fit the bracket level and secure the pin and retaining ring.
  6. Manually move the gate through its full travel. The arm must not strike a wall, fence, or gate leaf, and its movement must not create an unguarded entrapment or shearing point. Then set the stops and lock the motor again.

Assembly of the HYKE arm, pins, and retaining rings

Level installation of the HYKE motor bracket

Correct bracket position on the structural part of the gate leaf with the arm fully extended

Installation with a shortened arm

For a shortened arm, select A in the 90°–95° range on the installation chart; the actual gate opening must not exceed 90°. Determine the bracket position on the gate leaf with the motor released: press the bent arm against the closed leaf until it reaches its end position. Maintain E of at least 300 mm, an opening angle of no more than 90°, and stay below the lower limit curve. During a test opening by hand, hold the bracket against the gate leaf and check that the bent arm and its joint do not hit any obstacles. Secure the bracket only after checking the full travel path.

Clearance check with a shortened HYKE arm

Mechanical opening and closing stops

  1. Release the motor and move the gate leaf by hand to the desired open position.
  2. On the underside of the motor, turn plastic disc A and set the opening beneath the arm as shown.
  3. Fit stop B in the nearest suitable position. It must engage correctly; compare the OK/NO markings.
  4. Turn the disc so the stop cannot fall out. Make fine adjustments using adjustment screw C.
  5. If the gate has no ground-mounted closing stop, set the closing stop using the same procedure. Finally, tighten nut D securely so the disc cannot turn by itself.
  6. After changing the stop positions, perform a new position-learning procedure and tests.

Disc A position when inserting the HYKE mechanical stop

Correct engagement of the HYKE stop – OK and NO examples

Adjusting the stop with screw C and securing it with nut D

Manual release in the event of a power failure

Stop the gate and disconnect the power before releasing the motor. Make sure the gate leaf cannot move by itself; keep it under control in windy conditions.

  1. Insert key A and turn it 90° clockwise.
  2. Turn the extended lever B 90° counterclockwise. The gate leaf can now be moved by hand.
  3. To re-engage the drive, return the lever to the vertical position and push it into its housing. Turn the key 90° counterclockwise and remove it.
  4. After retracting the lever, move the gate leaf by hand a few centimetres in the opening direction to fully engage the gearbox. Before operating electrically, check that the lever is fully retracted and the drive is engaged. If a safety fault occurs, do not operate the gate until the cause has been rectified.

Release key A and lever B for the NICE HYKE drive

Electrical connections for motors and accessories

Disconnect the 230 V mains supply and backup battery before opening the cover. Check the power supply and protective earth connection. The supply circuit must include a device that allows complete disconnection, and the cables must be secured against being pulled out.

Open the HK7024 cover, lift the control unit, and route the cables through the bottom entry. Secure the mains cable with a cable clamp. HK7224 receives motor power and a separate encoder cable from the HK7024 control unit.

CableCross-section and maximum length
Mains supply to HK70243 × 1.5 mm², up to 30 m. For a longer supply cable, use 3 × 2.5 mm² and provide protective earthing at the automation unit as specified in the installation design.
Second motor HK72243 × 1.5 mm², up to 10 m. Two motor conductors and a protective conductor, according to the motor terminals.
Second motor encoder2 × 1 mm², up to 10 m. The motor and encoder cables may be replaced by a single 5 × 1.5 mm² cable; connect each conductor to the corresponding terminal.
BlueBUS2 × 0.5 mm², up to 20 m; for lengths over 20 m and up to 40 m, use 2 × 1 mm².
Flashing light2 × 0.5 mm², up to 20 m.
AntennaShielded RG58, maximum 20 m; a length of less than 5 m is recommended.
OPEN/CLOSE switchTwo 2 × 0.5 mm² cables or one 4 × 0.5 mm² cable, up to 50 m.
Electric lock2 × 1 mm², up to 6 m.

Securing the power cable and routing cables into the HYKE drive

M1, M2, and encoders

M2 is the gate leaf that opens first; M1 closes first. For a single-leaf setup, output M2 and the corresponding ENC2 input are used; M1 is left unused. For a two-leaf setup, connect each motor to its own encoder. Use the standard HK7224 motor specified for this setup.

At the motor terminals, connect the motor conductors to the outer terminals marked M; connect the protective conductor to the terminal marked with the earth symbol. Connect the encoders to the corresponding pairs ENC1/ENC2, with no polarity requirement. To correct the direction, disconnect the power and swap only the outer motor conductors for that motor—not the protective conductor.

HKA2 control unit wiring diagram

HKA2 control unit – motor outputs, encoders, and accessory wiring

Key:

  • FLASH = flashing light
  • EL/ELS = electric lock
  • OGI = open-gate indicator light
  • TX/RX = photocell transmitter/receiver
  • NO = normally open contact
  • NC = normally closed contact.

The diagram shows the inputs and their functions; select equipment to suit the specific setup.

Accessory terminals, voltage, and polarity

TerminalFunction and connection
Auxiliary power supplySbS (+) and STOP (−), 24 V DC, maximum 200 mA combined. Use the auxiliary power contact at the SbS terminal as positive and the auxiliary power contact at the STOP terminal as negative. Before connecting, check the relevant contacts on the installed board; the complete command-input pair is not a power output. This supply is for low-power accessories, not for a motor, flashing light, or electric lock.
BlueBUSTwo conductors for both communication and power; no +/− polarity. Maximum 15 BlueBUS devices, depending on their current consumption. EPMB are connected in parallel.
FLASHFor the flashing-light function 12 V DC, maximum 21 W; suitable ELDC. Connect the DC power supply according to the markings on the specific terminals and device. Do not assume the polarity from an adjacent output; if the markings on the board are illegible, verify the wiring before connecting.
ELS12 V AC, maximum 15 VA for an electric lock; AC has no positive or negative polarity. With L5 = ON, it changes to a lighting output 24 V DC (−30/+50 %), maximum 4 W. When changing the function, choose a device rated for this voltage and observe its DC polarity.
OGIGate-open indicator 24 V DC (−30/+50 %), maximum 4 W; can be used to control a small relay. With L8 = ON, it changes to a maintenance indicator. For a device with specified DC polarity, check the output markings on the actual board.
SbSStep-by-step command via voltage-free NO contact, no polarity. Do not supply the input with an external voltage.
OPEN / CLOSEOpening / closing via voltage-free NO contacts, no polarity. With L7 = ON, CLOSE can be changed to partial opening.
STOPNC, NO or 8.2 kΩ input, depending on the learned device. This is not a universal power supply pair; the contact wiring is described below.

BlueBUS, STOP, SbS, OPEN and CLOSE terminals on the HYKE control unit

Auxiliary power and command contact serve different functions. Do not power accessories through both contacts of an SbS or STOP pair, and do not short-circuit the pair when drawing power. On the HKA2R10, auxiliary power remains available even when Standby is enabled.

STOP, safety edge and pedestrian gate

When the learned state changes, STOP immediately halts movement and briefly reverses it. Connect multiple NO contacts in parallel and multiple NC contacts in series. Design the wiring for resistive safety edges according to the specific device; do not combine them with an arbitrary jumper.

If the gate leaf has a pedestrian gate, its monitoring contact must prevent powered movement while the pedestrian gate is open. After each change to the STOP wiring, perform device learning and safety tests. Photocells and safety edges protect different hazard areas; one does not automatically replace the other.

BlueBUS photocells

The TX transmitter and RX receiver of the photocells EPMB connect with two wires to polarity-free BlueBUS. Each pair must have matching addressing on TX and RX, and different addressing from the other pairs. Repeat the learning procedure after connecting or removing a device.

Positions of the PHOTO, PHOTO1 and PHOTO2 safety photocells on the HYKE swing gate

AddressWhat it protects and how it responds
PHOTO / PHOTO IIPHOTO at approximately 50 cm, PHOTO II at approximately 100 cm; outer pairs. When closing, it stops and reverses movement.
PHOTO1 / PHOTO1 IIPHOTO1 at approximately 50 cm, PHOTO1 II at approximately 100 cm; inner pairs. When closing, it stops and reverses movement; when opening, it stops and resumes once the beam is clear.
PHOTO2 / PHOTO2 IIProtection of the opening area. When opening, it stops and reverses movement.
PHOTO3Not permitted for this HYKE wiring configuration.

The jumper positions must match the selected function, not just the photocell's physical mounting location. You can also find the complete addressing and wiring details on the EPMB data sheet.

Initial startup and control unit check

All buttons and LEDs listed below are on the control unit in the HK7024. The HK7224 has no user programming. Before connecting the power supply, ensure that the cables, stops, covers and protective devices are securely installed.

  1. Move the leaves to approximately the midpoint of their travel, secure the motor gears and clear the movement area.
  2. After connecting the power supply, the BlueBUS LED should flash approximately once per second. The LEDs on both the TX and RX photocells must indicate power, and the FLASH beacon should be off at rest.
  3. If the power supply is missing or abnormal, switch off the unit and check the wiring and fuses. Do not proceed with learning if you find a problem.
  4. Before learning the positions, select the correct motor using the selector and perform device learning.

12-position motor type selector

For standard motors For HK7024 + HK7224, set DIP 10 = ON; all other positions 1–9, 11 and 12 = OFF. In Oview, this corresponds to the HYKE designation. Set the selector with the power off and always before learning the positions. The setting for HYKE HS does not apply here.

HKA2 selector – standard HYKE is the top row of HK7024

Learning BlueBUS and STOP devices

  1. Press and hold simultaneously Open ▲ + Stop/Set.
  2. When L1 and L2 start flashing rapidly, after approximately 3 seconds, release both buttons.
  3. Wait for detection to finish. STOP must be lit and L1/L2 must be off. L3/L4 may start flashing to indicate that position learning is required.
  4. Learning is required even if no photocells are connected, and whenever a device is added or removed. Then repeat the safety tests.

Learning the gate leaf positions

Devices must be learned first, and the motor selector must be set correctly. The mechanical stops must be secure, and the force must be suitable for the gate. During learning, monitor both motors and the entire movement area.

Automatic learning

  1. Press and hold simultaneously Stop/Set + Close ▼.
  2. When L3 and L4 start flashing rapidly, after approximately 5 seconds, release the buttons.
  3. The control unit slowly closes M1 to the stop, slowly closes M2 to the stop, slowly opens M2 and M1 to their stops, and finally quickly closes both leaves. With a single motor, only the corresponding M2 leaf is learned.
  4. Successful completion is confirmed when both L3 and L4 go out. Then check several normal opening and closing cycles.
  5. If the direction or sequence is wrong, stop movement using the Open or Close button. Disconnect both the mains power and the battery before carrying out repairs. If M1/M2 are swapped, swap their encoders too; if the direction is wrong, swap the outer motor wires for the relevant motor.
  6. If a photocell or STOP is triggered, learning is interrupted and L1 flashes. After resolving the cause, repeat the procedure from the beginning.

Open, Stop/Set and Close buttons on the HYKE control unit

Manual learning and position definitions

Manual learning lets you set positions individually. A short press of Open/Close switches the LED; holding the button moves the motor. Position 0 is the closing stop, position 1 is the opening stop, and A is the desired intermediate opening stop.

LED – positionWhat is stored
L1 – 0/M1Fully closed M1 leaf at the mechanical stop.
L2 – 0/M2M2 wing fully closed against the mechanical stop.
L3 – SA/M2Opening offset: once M2 passes this position, it can start opening M1.
L4 – A/M1Required M1 opening stop position.
L5 – A/M2Required M2 opening stop position.
L6 – SC/M1Closing offset: once M1 passes this position, it can start closing M2.
L7 – 1/M1M1 wing fully open against the mechanical stop.
L8 – 1/M2M2 wing fully open against the mechanical stop.

Positions 0, 1, A and offsets SA/SC for two HYKE wings

  1. Press Stop/Set + Close and release as soon as L1 starts flashing, after approximately 3 seconds. For manual programming, do not wait for L3/L4, which start automatic programming.
  2. Hold Open or Close to move the selected motor to the required position. Release the button to stop the movement.
  3. To save, hold Stop/Set for at least 3 seconds. While you hold it, the relevant LED will come on steadily after approximately 2 seconds. Release the button only after at least 3 seconds; the next LED will then start flashing.
  4. Continue through L8. Leave less than 10 seconds between button presses; a longer pause ends the procedure and retains the changes saved so far.

With one M2 motor: Confirm unused positions L1 and L7 by holding Stop/Set for at least 3 seconds. Skip L3, L4 and L6 by briefly pressing Open/Close. Save positions L2, L5 and L8 for the actual M2 wing.

Mixed programming

Perform automatic programming first. Then enter manual mode by pressing Stop/Set + Close and release when L1 flashes. Briefly press Open/Close to select a position, adjust it by moving the wing, and save it as in manual programming. Use this method to adjust A, SA and SC; leave the end positions 0 and 1 as programmed from the stops. End the procedure by stepping through the flashing LEDs until you pass L8.

Pre-handover tests

  • After disconnecting all power sources, release the motor and check that it moves manually along its full travel. For the test, the manufacturer specifies a maximum of 390 N for manual movement; this figure does not replace drive selection or impact force measurement.
  • After securing the motor and restoring power, check opening, closing, stopping, deceleration and correct overlap of the wings.
  • Test each photocell, safety edge and gate monitoring contact individually. Eliminate all crushing and shearing hazards around the arms.
  • Verify the forces and provide the user with the operating instructions, release procedure and maintenance plan. Use the gate only after all tests have been completed successfully.

HKA2R10 control unit settings

Open ▲ selects or opens, Stop/Set stops and confirms, Close ▼ selects or closes. The fourth button is not used. Holding Stop/Set for more than 5 seconds opens programming mode when L1 is flashing.

Level I – enabling and disabling functions

  1. Hold Stop/Set until L1 starts flashing, then release.
  2. Use Open/Close to select the LED for the relevant function. Briefly press Stop/Set to change the state: short flashes = OFF, long flashes = ON.
  3. Repeat the selection and change for the next function. To save and exit, do not press any button for 10 seconds.

LED – function and meaningState
L1 – Automatic closing
ON: after opening, the gate closes once the set pause has elapsed. OFF: semiautomatic operation. The factory-set pause is 30 s.
ON / OFF
Factory default: OFF
L2 – Close after photocell activation
ON: if automatic closing is enabled, photocell activation reduces the pause to 5 s. If automatic closing is disabled, activation triggers closing after the set pause.
ON / OFF
Factory default: OFF
L3 – Always close
ON: if power is restored while the gate is open, the control unit starts closing after 10 s, with a 5 s pre-warning flash. OFF: the gate will not start moving automatically when power is restored.
ON / OFF
Factory default: OFF
L4 – Full standby
ON: approximately 1 minute after movement, BlueBUS and most LEDs switch off; a command restores operation after a brief delay. OFF: this energy-saving mode is disabled. The auxiliary SbS/STOP power supply on R10 remains available.
ON / OFF
Factory default: OFF
L5 – ELS as a light
ON: the ELS output functions as a light at 24 V DC (−30/+50 %), max. 4 W. OFF: ELS controls an electric lock at 12 V AC, max. 15 VA. Select the equipment and wiring to suit the chosen function.
ON / OFF
Factory default: OFF
L6 – Pre-flashing
ON: the warning light flashes for 3 s before movement. OFF: it starts flashing at the same time as movement begins.
ON / OFF
Factory default: OFF
L7 – CLOSE as partial opening
ON: the CLOSE input issues a partial opening 1 command. OFF: it issues a close command.
ON / OFF
Factory default: OFF
L8 – OGI as a maintenance indicator
ON: OGI indicates that maintenance is due. OFF: OGI indicates that the gate is open. The limit is set at Level II/L7.
ON / OFF
Factory default: OFF

Level II – adjustable parameters

  1. Hold Stop/Set until L1 starts flashing, then release.
  2. Use Open/Close to select the input LED for the required parameter.
  3. Hold Stop/Set. After approximately 3 s, the value LED for the current setting will light up. While continuing to hold Stop/Set, move it using Open or Close.
  4. Release Stop/Set. To save and exit, do not press any button for 10 seconds.

The bold value is the HKA2R10 factory setting. The input LED identifies the parameter; the value LED identifies its value. The same LED number in both columns does not necessarily mean the same thing.

Input LED – name and descriptionSetting LED – value
L1 – Pause time
Time before automatic closing; effective only when automatic closing is enabled.
L1 – 5 s
L2 – 15 s
L3 – 30 s
L4 – 45 s
L5 – 60 s
L6 – 80 s
L7 – 120 s
L8 – 180 s
L2 – Step-by-step mode
Sequence of SbS and related commands; L4, L5, L7 and L8 also change OPEN/CLOSE behavior.
L1 – Open – stop – close – stop
L2 – Open – stop – close – open
L3 – Open – close – open – close
L4 – Condominium mode: while opening, SbS/OPEN has no effect; CLOSE reverses to closing. While closing, SbS/OPEN reverses to opening; CLOSE has no effect.
L5 – Condominium mode 2: responses as in L4; holding the command for more than 2 s triggers STOP.
L6 – Step-by-step mode 2: a command shorter than 2 s triggers partial opening.
L7 – Hold-to-run: movement occurs only while the command is held; releasing it stops the gate.
L8 – Semi-automatic opening; closing only while the command is held.
L3 – Motor speed
Normal operating speed; after changing it, check safety, forces and deceleration.
L1 – Very slow
L2 – Slow
L3 – Medium
L4 – Fast
L5 – Very fast
L6 – Maximum
L7 – Opens fast, closes slowly
L8 – Opens at maximum speed, closes at medium speed
L4 – Pressure relief after closing
A brief reverse releases any remaining pressure, ensures the gate is properly closed and makes manual release easier.
L1 – No pressure relief
L2 – Level 1 – minimum, approximately 100 ms
L3 – Level 2
L4 – Level 3
L5 – Level 4
L6 – Level 5
L7 – Level 6
L8 – Level 7 – maximum, approximately 800 ms
L5 – Motor force
Force of both motors. A higher setting is not a substitute for correcting friction; impact-force testing is required after changing it.
L1 – Level 1 – minimum
L2 – Level 2
L3 – Level 3
L4 – Level 4
L5 – Level 5
L6 – Level 6
L7 – Level 7
L8 – Level 8 – maximum
L6 – Pedestrian and partial opening
For pedestrian opening, M2 moves. With both leaves, the fractions refer to the smaller of their learned angles.
L1 – Pedestrian 1 – M2 to 1/4
L2 – Pedestrian 2 – M2 to 1/2
L3 – Pedestrian 3 – M2 to 3/4
L4 – Pedestrian 4 – fully open M2
L5 – Partial 1 – both leaves to 1/4 of the smaller angle
L6 – Partial 2 – both leaves to 1/2 of the smaller angle
L7 – Partial 3 – both leaves to 3/4 of the smaller angle
L8 – Partial 4 – both leaves to the smaller learned angle
L7 – Maintenance reminder
Number of manoeuvres before the reminder. This does not replace the regular service interval.
L1 – 500
L2 – 1 000
L3 – 1 500
L4 – 2 500
L5 – 5 000
L6 – 10 000
L7 – 15 000
L8 – 20 000
L8 – Fault history
Displays the results of the last eight manoeuvres. After selecting, count the BlueBUS flashes and consult the diagnostics table.
L1 – 1st manoeuvre – most recent
L2 – 2nd manoeuvre
L3 – 3rd manoeuvre
L4 – 4th manoeuvre
L5 – 5th manoeuvre
L6 – 6th manoeuvre
L7 – 7th manoeuvre
L8 – 8th manoeuvre – oldest

After changing force, speed or positions, check the entire travel path, photocells, STOP function and impact forces. Automatic closing must be appropriate for the safety measures and use of the specific gate.

Radio receiver and remote controls

The radio receiver plugs into the SM connector on the HK7024 control unit. Disconnect all power sources before inserting or removing it. The HK7224 does not require a separate radio receiver.

Inserting the radio receiver into the SM connector on the HYKE unit

Current kits use NICE OXIBD and ON2E. OXIBD also supports compatible two-way remote controls; MYGO4 is a standard rolling-code remote control. For an older receiver, select a transmitter that matches its specific coding.

Receiver outputCommand to HYKE
1SbS – step-by-step mode as set by parameter II/L2.
2Partial opening 1 as set by parameter II/L6; factory setting: fully open M2.
3OPEN – open.
4CLOSE – close.

In Mode I, the entire remote control is memorised; in Mode II, an individual button is assigned to the selected command. Storage and deletion are performed using the button on the receiver, not by resetting the control board. For exact button presses, timings and confirmations, see the NICE remote control pairing guide and the OXIBD card. In extended mode there may be more commands; select the command number according to the receiver.

Backup battery and control unit generation

The backup battery fits in the dedicated compartment in the HK7024. A compatible battery powers the system through its control unit; it is not connected separately to the HK7224 motor terminals.

InstallationCorrect selection
HKA2R10The older version uses PS124. Current version PSS124 connects using the cable intended for the older compatible control unit; the PSS124 package includes cables for both R10 and R30.
Newer control unitPSS124 with the appropriate connector. The older PS124 requires a CABLA11 adapter and Standby to be disabled; make the connection according to the markings on the actual control board.

  1. Disconnect the mains supply and any existing battery. Remove the cover and lift the control unit.
  2. Insert the battery into the designated compartment and use the correct cable for the relevant generation. Do not confuse the connector with the motor output.
  3. Connect the battery electrically only after installation and programming are complete. Check operation with the mains switched off, then restore the power supply to recharge the battery.

Backup battery compartment beneath the HYKE control unit

The number of operations available during a power failure depends on the battery condition, temperature and load. The battery does not replace the available manual release. Solemyo solar power is connected via the designated power input on a compatible control unit; the mains and solar power supply must not be connected at the same time.

Diagnostics and troubleshooting

The warning light flashes regularly while the gate is moving. In the event of a fault, it emits a short series of flashes, pauses for approximately 1 s, then repeats the same series. Count the short flashes before resetting or changing the settings.

Number of flashesCause and next step
1BlueBUS – missing or changed device. Check the wiring and addressing; after making changes, run device learning.
2A photocell is blocking movement. Remove the obstruction, clean the covers and check the TX/RX settings. Photocells.
3Resistance to movement or force limit triggered. Check the gate leaf, hinges and arm; do not increase the force without first addressing the cause and carrying out new tests.
4STOP triggered. Check the safety edge, pedestrian gate contact and learned input status. STOP wiring.
5Internal control unit parameters. Wait at least 30 s, try a command and restore the power supply if necessary. If the problem recurs, service is required.
6The maximum number of consecutive operations or the hourly operation limit has been exceeded. Allow the operator to cool down for a few minutes and reduce usage.
7Electrical fault. Wait at least 30 s and restore the power supply if necessary; if the fault recurs, arrange for service.
8A continuously active command is preventing further commands. Check the button, switch and any timer.
9The assembly is locked by an electronic Automation Stop command. Use the relevant Automation Unlock command; this is not a mechanical release lever.
10The encoder has detected an obstruction or excessive friction. Check the mechanical components, assignment and encoder wiring. M1/M2 and ENC1/ENC2.

Checking the LEDs on the board

LEDNormal status or next step
BlueBUSApproximately 1 green flash/s = normal operation. When Standby is enabled, it flashes more slowly; normal operation resumes after a command. Two quick flashes = input status change. If there is no light, check the power supply and fuses; investigate a steady light or red flash sequences using the diagnostics.
STOPLit = safe status learned. Off = input triggered or changed.
SbS / OPEN / CLOSEOff when idle, lit while a command is active. A steadily lit LED may indicate a stuck or faulty contact.
L1/L2 flashing slowlyRequest for device learning.
L3/L4 flashing slowlyRequest for position learning.

If the motor runs but the gate leaf does not move, check that the release lever is fully engaged. If the HK7224 does not respond or moves incorrectly, check its M1/M2 output and the corresponding encoder in the HK7024. Before replacing a fuse, first eliminate the cause; use a fuse of the same type and rating.

Resetting the control unit settings

Resetting erases the custom HKA2 settings. This is not remote control pairing or deletion of the radio memory in a separate receiver.

  1. On the unit in the HK7024, press and hold Open ▲ + Close ▼, until L1 and L2 start flashing.
  2. Release both buttons.
  3. After resetting, check the selector again, run device and position learning, set the functions and carry out safety tests.

Maintenance and safe use

Schedule a professional inspection no later than 6 months or 20,000 operations after the previous inspection, whichever comes first. Choose a shorter interval for intensive or adverse operating conditions.

  • Before servicing, disconnect the mains, battery and any other power source.
  • Check that the brackets, screws, pins, retaining rings, arms, stops, cover and cable glands are secure. Replace any damaged or worn parts.
  • Check that the gate moves easily by hand, that the release is secured, and that all photocells, safety edges and pedestrian gate contacts work correctly.
  • Do not enter the gate's path or touch the arms while it is moving. Keep remote controls out of the reach of children.
  • The customer can keep the photocell covers clean and remove debris from the gate path. If there is a mechanical or electrical fault, do not use the operator and contact service.

Estimated service life

Add the indices for length, weight and all other relevant factors. Then use the graph to read the estimated number of cycles with regular maintenance. The horizontal axis shows the sum of the indices in %, and the vertical axis shows the number of cycles. This estimate does not guarantee a specific number of years or cycles.

Characteristics of the complete automation systemIndexService life graph
FactorFull-length / shortened arm

Original HYKE estimated service life graph – stress index and number of cycles

LengthLess than 1.8 m: 0 / 15 %
1.8–2.5 m: 15 / 20 %
2.5–3.0 m: 20 / 30 %
Over 3.0 m and up to 3.5 m: 30 % / not applicable
WeightLess than 200 kg: 0 / 30 %
200–250 kg: 20 / 40 %
Over 250 kg: 30 % / not applicable
Temperature / humidityAbove 40 °C or below 0 °C, or humidity above 80 %: 20 / 20 %
Solid infill15 / 20 %
Windy location15 / 20 %

First check whether the gate is suitable according to the weight and length chart and installation geometry. If the values fall at the boundary between two ranges, choose the higher of the available numerical indices. The shortened arm is permitted at a length of 3.0 m only with a weight corresponding to curve B; do not use it above 3.0 m. Always assess the entire installation.

Technical specifications and dimensions

ParameterNICE HYKE HK7024
Control unitBuilt-in HKA2; controls one or two leaves.
Power supplyHK7024: 230 V AC ±10%, 50/60 Hz; 24 V DC motor.
No-load speed1.5 rpm; adjustable speed settings.
TorqueMaximum 500 Nm; rated 120 Nm.
Maximum cycle frequency40 cycles/h at rated torque; 25 cycles/h at the maximum operating temperature.
Continuous operationMaximum approximately 7 minutes at rated torque.
Maximum power consumption300 W for the drive with control unit.
Maximum current draw1.5 A on a 230 V AC supply.
Protection ratingIP54 with the cover intact.
Operating temperature−20 to +55 °C; drive performance decreases in cold conditions.
Dimensions210 × 290 × 320 mm (width × depth × height).
Drive weight10.5 kg.
Single-leaf limitWith the full-length arm: 3.5 m / 200 kg or 1.8 m / 330 kg; intermediate values and the shortened arm as shown in the chart.

Width, depth and height of the NICE HYKE drive

How can I order this item?

Choose the option that suits you:

  1. order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
  2. order by email: place your order at [email protected]

Ask us anything about NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg

Product: NICE Hyke HK7024 – swing gate operator with control unit, for gate leaves up to 3.5 m / 330 kg
Name:
Email:
Phone:
Message:
This page is protected by Google reCAPTCHA.