NICE Hopp HO7224 – swing gate operator without control unit for a gate leaf up to 2.4 m / 250 kg
| Product availability: | In stock | We normally dispatch goods within 24 hours. |
|---|
In stock
€322.70 including VAT
| Weight |
|---|
| 6,50 kg |
Description of NICE Hopp HO7224 – swing gate operator without control unit for a gate leaf up to 2.4 m / 250 kg
NICE HOPP HO7224 does not have a control unit. This articulated-arm operator is intended as the second motor for HO7124. Both operators are controlled by the unit POA3R10 built into the HO7124; no additional unit is installed in the HO7224. The limits for one gate leaf are 2.4 m at 160 kg or 1.5 m at 250 kg.
The motor operates on 24 V DC. The operator is non-reversible; in the event of a power failure, you can release it with a key. HO7224 is not a standalone gate automation system and must not be connected directly to 230 V.
What to add to the HOPP operator
Choose the equipment based on the entire gate and the risks in its surroundings. Electronic accessories connect to the control unit in the HO7124; the HO7224 has neither its own inputs nor a receiver socket.
| What | Why | Type |
|---|---|---|
| Main operator with control unit | Its built-in POA3R10 unit also controls the HO7224 motor. | |
| Photocells | Monitor the passageway; two-wire connection BlueBUS. | |
| Flashing light | Signals movement; connects to FLASH. | |
| Remote control | The receiver fits in the HO7124. The kits listed include this receiver and one two-channel remote control. | |
| Code/keypad or card access control | Compatible access-control devices connect to BlueBUS. | |
| Backup battery | In the event of a mains failure, it powers the system via the POA3R10 in the HO7124; the number of movements depends on the gate and battery charge. | |
| External manual release | Allows manual release in the event of a power failure when there is no other entrance to the property. |
|
| Service and diagnostics | The programmer connects to the POA3R10 via the BUS T4 interface. |
When to choose NICE HOPP
HOPP is an articulated-arm operator with an aluminium arm for swing gates that open inwards onto the property. It is also suitable for more intensive use, provided the gate meets the mechanical and operational limits. These operators are not suitable for gates that open outwards.
| Length of one gate leaf | Weight of one gate leaf |
|---|---|
| Up to 1.5 m | Up to 250 kg |
| Up to 2.4 m | Up to 160 kg |
The maximum limits of 2.4 m and 250 kg do not apply at the same time. For lengths between these values, follow the permissible-load curve. Two motors operate two gate leaves; they do not increase the capacity for a single leaf. Solid infill, wind, friction and the condition of the hinges affect suitability and service life.
Load and estimated service life
To estimate service life, add the relevant indices. Read the result from the original chart. This is an approximate estimate assuming regular maintenance, not a guarantee of the number of cycles.
| Factor and index | Service life chart |
|---|---|
If a value falls exactly on an interval boundary, use the higher index for the estimate. The estimated service life does not replace checking the permitted length and weight or testing the force on the completed gate.
Kits for one or two gate leaves
One leaf: HO7124 with control unit. Two leaves: HO7124 with control unit and HO7224 without control unit. Both motors are controlled by the control unit in the HO7124. All kits listed below include OXIBD and 1× ON2E. The photocell option includes one pair of EPMB; the accessories option also includes a flashing light ELDC.
| Kits for 1 leaf | Main operator HO7124 with control unit | Kits for 2 leaves |
|---|---|---|
HOPP for 1 leaf![]() Basic With photocells With accessories 1× HO7124 Control unit in the HO7124. The limit applies to one leaf. | NICE HO7124![]() 24 V DC The HO7124 has a built-in POA3R10, which also controls the HO7224 motor. | HOPP for 2 leaves![]() Basic With photocells With accessories HO7124 + HO7224 Control unit in the HO7124. The limit applies to one leaf. |
Installing the operator and articulated arm
Before installation, check that the gate is sturdy, the leaf is balanced, and it moves smoothly by hand throughout its full travel. The operator does not replace repairs to damaged hinges. Attach the arm bracket to a solid part of the leaf, such as the frame. The mounting surface must safely withstand the forces exerted by the operator.
| What to check | Requirement |
|---|---|
| Motor clearance | Minimum installation width: 170 mm; the operator body is 180 mm wide. Check the full outline and the arm's range of movement. |
| Arm movement clearance | Allow at least 400 mm at the location shown in the drawing. This is not the post cross-section dimension. |
| A/B geometry | This is determined by the hinge position and the required opening angle; use the chart below. |
| Access | Ensure safe access to the release key and cover. |
| Obstacles and pedestrian gate | The leaf or arm must not hit a wall or any other object. If the gate has an integrated pedestrian door, the operator must be disabled while it is open. |
How to determine installation distances A and B
- Measure distance A based on the hinge position and mounting surface shown in the drawing.
- Open the leaf by hand to the required position and determine its angle.
- Use the value of A and the required angle range on the chart to determine B, i.e. the position of the motor bracket. Dimensions are in millimetres.
Manufacturer's example: at A = 100 mm and an angle of 100°, B is approximately 180 mm. This example is not a universal installation dimension.
The chart shows the ranges 90–95°, 95–100°, 100–105° and 105–110°. A larger angle is not possible for every hinge offset; both A and B must remain within the corresponding range.
| Dimension A | Dimension B |
|---|---|
![]() | ![]() |
Anchoring the brackets and assembling the arm
- Hold the motor bracket level and mark the four holes. Choose the anchor bolts, washers and wall plugs to suit the substrate; these fixings are not included.
- Attach the motor to the bracket using the two supplied M4.8 × 13 screws.
- Connect the curved arm to the straight arm using the pin and retaining ring. Attach the gate-leaf bracket in the same way.
- Disengage the motor and, with the gate closed, determine where to position the gate-leaf bracket. Extend the arms as shown in the original drawing and position the bracket as far from the drive as possible.
- Attach the bracket horizontally to the sturdy gate-leaf frame. Reconnect the joint with the pin and retaining ring; then check the full travel and adjust the stops.
Adjusting the mechanical stops
The motor has mechanical stops with fine adjustment for opening and closing. The stops define the end positions for the subsequent learning procedure.
- Unlock the motor with the key and move the gate leaf manually to the desired open position.
- Turn plastic disc A on the underside until the notch is positioned beneath the arm as shown in the drawing.
- Insert stop B in the first available position, oriented correctly. Turn the disc to lock it in place and prevent it from falling out.
- Fine-adjust the position using screw C. If the closing stop is not on the ground, adjust the closing stop in the motor in the same way.
- Tighten the disc's fastening nut D to prevent it from turning on its own. Manually check that both positions are reached, then lock the motor again.
| Position of disc A | Fine adjustment C and locking D |
|---|---|
![]() | ![]() |
Preparing the cabling
Cables must be suitable for the installation location. Route cable entries so that water or condensation cannot run into the electronics. Prepare the mains supply, grounding and power isolation according to the specific installation.
| Connection | Cable and length |
|---|---|
| 1 – Supply to HO7124 | 3 × 1.5 mm², up to 30 m. For longer runs, the manufacturer specifies 3 × 2.5 mm² and grounding at the automation unit; check that the supply cable is suitable for the specific installation. |
| 2 – Warning light | 2 × 1 mm², up to 20 m. |
| 3 – Antenna | RG58 coaxial cable, up to 20 m; recommended length less than 5 m. |
| 4 – BlueBUS | 2 × 0.5 mm², up to 20 m; for 20–40 m, use 2 × 1 mm². |
| 5 – Key switch | Two 2 × 0.5 mm² cables or one 4 × 0.5 mm² cable, up to 50 m. |
| 6 – Electric lock | 2 × 1 mm², up to 6 m. |
| 7 – Interconnection between drives | 3 × 1.5 mm², up to 10 m; depending on the terminal block and original wiring diagram. |
HOPP control unit and wiring
HO7124 has a built-in POA3R10 and a mains supply of 230 V AC. The motors in the assembly operate on 24 V DC. HO7224 must not be connected directly to 230 V.
The following wiring and setup instructions apply to the POA3R10. This board is not interchangeable with the older POA3. When carrying out repairs, check the markings on the board actually installed and its connectors; a similar drive name is not enough.
Disconnect both the mains supply and backup battery before opening the cover.
POA3R10 terminals
| Terminal | Function |
|---|---|
| M1 | Output for HO7224 without a control unit. |
| M2 | Output for the HO7124 motor with a control unit. When using a single motor unit, HO7124 remains connected. |
| FLASH | ELDC warning light or 12 V DC bulb warning light, maximum 21 W. |
| EL | 12 V AC electric lock, maximum 15 VA. |
| BlueBUS | Power supply and communication for compatible devices via two non-polarized wires. Maximum 12 BlueBUS units; the load is calculated according to the types of devices connected. |
| STOP | Safety input for an NO, NC or 8.2 kΩ resistive device; the type is learned during device recognition. |
| SbS | Voltage-free NO contact for step-by-step control. |
| OPEN | Voltage-free NO contact for partial opening; the function can be changed by programming. |
| Receiver antenna | Coaxial cable to the antenna connector on the OXIBD receiver; follow the markings on its terminals. |
Do not apply external voltage to the SbS and OPEN control inputs. Changing the function of FLASH or EL also changes the electrical characteristics of the output: for other auxiliary functions, it is intended for a 24 V DC lamp or relay, maximum 4 W. Do not use a load intended for the original function without checking it first.
Auxiliary power supply on the POA3R10
For a compatible reader or key-switch illumination, the right terminal of the STOP pair is = − and the left terminal of the SbS pair is = +, when the image below is oriented with the labels above the terminals: 24 V DC (−30% to +50%), maximum 200 mA. This pair remains powered in Stand-by mode. Connect the device's command relay separately as a voltage-free NO contact; do not apply external voltage to the command input. BlueBUS and voltage-free contacts have no +/− polarity. The EL output is 12 V AC/maximum 15 VA, with no fixed +/− polarity; FLASH for the warning light is 12 V DC/maximum 21 W; for a polarised warning light, check the markings on the board and the light. For a polarized warning light, check the markings on the board and the light.
BlueBUS photocells and STOP input
EPMB, EDSB and ETPB connect in parallel to BlueBUS. The TX and RX of each photocell pair must have the same jumper settings; each additional pair must have a different address. Set the addresses of keypads and readers according to their own instructions. After adding or removing a device, repeat device scanning and a functional test.
| Photocell address | HOPP response according to position |
|---|---|
| FOTO / FOTO II | External photocells: when closing, they stop movement and the leaves reopen. |
| FOTO 1 / FOTO 1 II | Internal photocells: when closing, they stop and reverse movement. When opening, they stop the leaves; once the beam is clear, opening resumes. |
| FOTO 2 / FOTO 2 II | Internal photocells: when opening, they stop and reverse movement. |
| FOTO 3 | This configuration is not supported by the HOPP control unit. |
EPMB jumper address table shows the TX/RX settings. The general photocell manual also includes configurations for other control units; for HOPP, use a supported address from the table above.
Standard relay photocells are not a substitute for BlueBUS photocells. For STOP, connect NO contacts in parallel and NC contacts in series. Wire combinations of contacts or multiple resistive safety edges according to the relevant devices’ diagrams; do not disable the safety input with a jumper.
Receiver and remote controls
With the power disconnected, plug the receiver into the socket in the HO7124. Verified HOPP kits use OXIBD with ON2E. Pair and erase remote controls according to the receiver actually installed. The OXIBD manual and setup are available on its own page; resetting the POA3R10 does not erase the radio memory.
PS124 backup power supply
For the POA3R10, the PS124 is installed in the HO7124. Connect it only after installation and programming are complete, as it can move the gate even when mains power is off. It must be disconnected when working on the wiring. The battery in the HO7124 also provides backup power to the HO7224 connected to this control unit.
The PS124 is not included in the basic kits listed above. Once charged, test a full cycle both on mains power and on battery power alone. The speed and number of cycles depend on the battery condition and gate load. Do not assume that a battery connector from another generation is interchangeable.
Initial startup and gate testing
The arms of all installed operators must be fitted, the stops securely set, and the motors locked. Set the leaves approximately halfway along their travel so they have room to move in both directions during testing. For a two-leaf gate, check the sequence according to the overlap; the leaves must not collide when closing.
The HO7224 is configured from the POA3R10 in the HO7124. It has no programming buttons of its own. Learning is performed for the complete system: first the devices, then the stop positions, followed by a safety test. If the HO7224 is replaced or the stops are changed, the settings for the entire gate must be checked again.
1. Scanning devices in the HO7124
Once the accessories are connected, the HO7124 scans for BlueBUS devices and the STOP input. Repeat the scan after adding or removing devices. Scanning the accessories alone does not set the leaves’ end positions.
2. Learning the positions of the complete gate
After setting the mechanical stops, start automatic movement learning for both motors from the HO7124. The first movement should be closing; stop the process if the direction is reversed or the leaves move in the wrong sequence. After successful learning, check the slowdown, leaf overlap and safety functions.
Instructions for using the buttons and LEDs on the HO7124 control unit are in the preserved HOPP installation PDF.
Checks to make before regular use
- Several complete opening and closing cycles, with no points of excessive friction, arm collisions or leaf contact.
- Correct slowdown, leaf sequence and reliable end positions.
- The operation of every pair of photocells and the STOP device in the relevant directions of movement.
- Manual release, re-engagement and any backup power supply.
- Impact force measurement and protection at all crushing, trapping and shearing points.
The operator’s obstacle detection does not replace the required safety devices or force measurement.
Manual release during a power outage
Release the operator only when the leaf is stationary. Insert the key into the release mechanism and turn it 180° in the direction marked on the mechanism. You can open or close the leaf manually without forcing it. Before resuming automatic operation, relock the operator with the key and remove the key; on a two-leaf gate, check both motors.
Release from the outside
If there is no other access to the property, you can add a KIO with the KA1. For a two-leaf gate, the manufacturer specifies connecting it to the operator on the leaf that opens first from the closed position. The cable is fitted to the release mechanism; it does not change the gate’s opening direction.
Maintenance and safe use
Schedule servicing no later than 6 months or 20,000 cycles, whichever comes first. Disconnect the mains power and battery before carrying out any work. Check the anchors, corrosion, pins and retaining rings, and the condition of the arms, hinges, cables, stops and release mechanism. After servicing, repeat the functional and safety tests.
Do not operate the leaf while anyone is working in its path. Children must not use the gate as a toy, and remote controls must be kept out of their reach. If a safety device fails, use the manual release and arrange for repairs; do not disable the safety feature.
NICE HO7224 technical specifications
| Parameter | Value |
|---|---|
| Type | Articulated electromechanical operator, 24 V DC motor. |
| Control unit | Not built in; controlled by the HO7124. |
| Product power supply | 24 V DC ±25%, from the control unit. |
| Maximum torque | 250 Nm. |
| Rated torque | 100 Nm. |
| Speed at rated torque | 0.13 rad/s (1.2 rpm). |
| No-load speed | 0.17 rad/s (1.6 rpm); adjustable via the control unit. |
| Duty cycle at rated torque | Up to 35 cycles/hour; at the maximum temperature, up to 25 cycles/hour. |
| Continuous operation | Up to 10 minutes; at the maximum temperature, up to 8 minutes. |
| Power consumption at rated torque | 50 W. |
| Maximum power consumption | 100 W. |
| Rated current | 2 A. |
| Maximum current | 4 A, for up to 1 s. |
| Operating temperature | −20 to +55 °C; performance decreases at low temperatures. |
| Ingress protection rating | IP54 with the cover intact and properly closed. |
| Body dimensions | 180 × 252 × 290 mm (width × depth × height). |
| Operator weight | 6.5 kg. |
Parameters at rated load apply to ambient conditions of approximately 20 °C. The number of cycles depends on the gate leaf and resistance to movement; the following also apply: length and weight limits.
360°:
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]




















