NICE M3BAR barrier gate - without boom arm
| Product availability: | In stock | We normally dispatch goods within 24 hours. |
|---|
In stock
€1,349.99 including VAT
| Weight |
|---|
| 80 kg |
Description of NICE M3BAR barrier gate - without boom arm
NICE M3BAR is an electromechanical barrier for controlling vehicle access, supplied without an arm. It has a 24 V DC motor and a built-in control unit BCU1 R10 (XBA3 R10). The standard configuration is powered from a 230 V AC; 24 V is the motor voltage.
It is designed for an arm specified as 3 m. The steel housing, balancing spring and aluminium arm with an elliptical cross-section allow intensive use when operating limits are observed. Choose the arm, receiver and safety accessories to suit the specific configuration.
For an existing barrier, first check the control board marking. The following settings apply to the BCU1 R10 with display and rotary selector; the older XBA3 uses different controls and cannot be considered interchangeable based on a similar name alone.
When to choose NICE M3BAR
| What to check | Specification and meaning |
|---|---|
| Arm | XBA15 – 3,150 mm |
| Clear opening width | 2.32–2.82 m |
| Adjustable operating time | 1.5–4 s |
| Max. cycles at rated torque | 500 cycles/h |
| Manual release | With a key in the event of a power failure or during servicing |
| Two opposing barriers | Master–Slave synchronisation |
The arm length is not the clear opening width. When selecting, allow for the space taken up by the housing and bracket; verify the final clear opening on site. Operating time depends on the settings, the arm and its accessories. The maximum number of cycles does not guarantee unlimited operation under every load condition.
The barrier is designed for vehicles. The arm's movement must not endanger pedestrians; provide a separate pedestrian passage and select safety devices according to the risks at the specific entrance. Before installation, also check the clearance above the arm when it is in the open position.
Arm accessories and their limitations
| Accessory | Condition |
|---|---|
| Rubber and lights | Permitted when used with the correct arm and wiring and when properly balanced. |
| Under-barrier skirt WA13 | Not permitted for the M3BAR. |
| Mobile support WA12 | Not permitted for the M3BAR. |
| Folding joint XBA11 | Use only with the correct XBA15 arm and joint geometry; it is not a universal joint for any arm. |
After adding lights, rubber, a support or an under-barrier skirt, reselect the spring attachment and balance. Increasing the motor force is no substitute for correct mechanical adjustment.
Barrier kits with arm and accessories
For a complete configuration with an arm, choose from the available kits. The stated length refers to the arm, not the clear opening width. Kits from different product ranges have different control units and limits; see each kit's product page for its specific contents.
| NICE M3BAR barrier kits |
|---|
M3BAR – 3 m arm![]() |
Accessories compatible with the M3BAR barrier
Choose accessories to suit the arm and how it will be used. When installing several accessories, their combined mechanical and electrical limits must also be observed.
| What | Why | Type |
|---|---|---|
| The housing is supplied without an arm; choose the length according to the clear opening width. | ||
| Adjustable support for the end of the arm when closed; do not confuse it with a mobile support. | ||
| 24 red stickers for improved arm visibility. | ||
| XBA4: lights for arms up to 4 m long. Connection to LIGHT depending on the installed type. | ||
| 9 sections, 1 m each; mechanical protection for the arm edge, not a substitute for a safety edge. | ||
| Rechargeable battery, 24 V. Connect after setting up the barrier; the number of operating cycles depends on the charge level and equipment. | ||
| Signals movement and diagnostics; dedicated INTERNAL LIGHT connector. | ||
| Controls vehicle passage according to the programmed INTERNAL LIGHT mode. | ||
| Allows the arm to be manually folded to the side. Folding is manual; do not confuse it with the XBA11 folding joint. | ||
| For low ceilings with the correct XBA15 arm; application range 1 950–2 400 mm, depending on the accessory geometry. | ||
Photocells | Two-wire BlueBUS; after changing the wiring, repeat Set 1. | |
Remote control | Plug-in SM receiver and transmitter with supported coding. Check the kit contents when ordering. | |
Control board | Replacement board of the current generation; not an additional external control unit required for a standalone barrier. | |
Service and setup | BUS T4 for diagnostics and the service counter. | |
Solar power supply | Alternative power source instead of mains; do not connect 230 V at the same time in this configuration. |
Installing the cabinet and arm
Disconnect both the mains supply and backup battery before starting work. Check that the base is solid, drainage is adequate, there is space for the full arm, and the manual release is safely accessible.
Foundation plate and anchoring
If the existing foundation surface is suitable, mark four holes to match the cabinet and choose anchors appropriate for the substrate. For a new foundation, prepare conduits, the four supplied anchor bolts, and a level foundation plate parallel to the arm.
| Substrate check | Requirement |
|---|---|
| Concrete foundation | Reinforced concrete, at least 0.15 m thick and with a volume greater than 0.2 m³. Determine the foundation dimensions according to local conditions. |
| Concrete anchors | 4 anchors with 12 MA (M12) bolts, each with a tensile resistance of at least approximately 3.9 kN. |
| Other load-bearing material | Verify the strength of the substrate and four anchoring points for a load of at least approximately 9.8 kN. |
| Installation | Position the plate level with the surface; secure the cabinet only after the concrete has fully cured. |
Mounting and assembling the arm
- Insert the two specified pins into the output shaft. Install the bracket in the position for the vertical arm, and secure it with bolts and spring washers.
- Fit the cover onto the bracket using the six bolts; leave them loose for now.
- Insert the supplied connector insert into the end of the correct aluminium arm and secure it with a bolt.
- Insert the protective rubber strip and the appropriate connectors into the grooves, then fit the end cap and rubber-strip caps.
- Slide the complete arm into the bracket as far as it will go and firmly tighten all six bolts.
- Install the selected accessories, then finish adjusting the spring, balancing the arm and running the learning procedure.
Left- or right-hand barrier installation
The spring-hinge side must match the direction switch position on the board. RH/DX is for the spring on the right-hand side of the balancing lever, LH/SX for a spring on the left side. A technician must change the mechanical configuration with the spring safely released; simply turning the switch while leaving the mechanics unchanged is not sufficient.
Spring attachment and boom balancing
Adjust the spring according to the actual length and weight of the fully equipped boom. For the standard configuration, select the exact model and length column in section A. The upper hole is marked with a letter A/B/C and the lower hole with a number 1/2/3. The position cannot be determined from the kit name alone.
For M3BAR, use section A: select its own column according to boom length and the row for the protective rubber, rubber with lights, or XBA11 joint.
| M3BAR assembly | Spring attachment |
|---|---|
| XBA15 shortened to 2.65 m, with protective rubber | A / 1 |
| XBA15 at a length of 3.15 m, with protective rubber | A / 3 |
| XBA11 folding joint | B / 3 for the joint configuration shown; check your own geometry. |
Use the table only if the bracket, spring, and hole layout match those shown. For a different mechanical design, follow the instructions supplied with the specific barrier.
The examples apply to the configuration specified. For additional accessories, follow the table rather than the standard example. Before repositioning or replacing the spring, a technician must safely release its preload and secure the boom.
Balance check at 45°, 20°, and 70°
- Disconnect the mains supply and backup battery, then release the gearmotor using the key. Carefully support the boom and set it to approximately 45°.
- If the boom rises, reduce the preload by turning the spring clockwise. If it drops, increase the preload by turning it counterclockwise.
- Repeat the check at approximately 20° and 70°. The boom must not move significantly on its own.
- Check that the spring is evenly arranged and secure it against rotation with nut B as shown. Check that it is securely fastened and lock the gearmotor.
With the motor released, the force required to move the M3BAR boom by hand, whether opening or closing it, must not exceed approximately 15 N. This is the maximum permitted imbalance. Measure the force perpendicular to the boom, 1 m from the pivot; this does not set the motor's impact force.
Mechanical stops
After releasing the gearmotor, manually move the boom through its full travel. Use the stop screws to set the horizontal closed and vertical open positions, then tighten the locknuts. Next, perform Set 2 position learning. Electronic learning does not replace correctly adjusted mechanical stops.
Wiring and power supply separation
Connect the 230 V mains cable to the L/N mains terminal block and the protective conductor, following the original installation. Secure the cable with a cable gland and strain relief. Do not apply 230 V to the command inputs or BlueBUS. Do not interchange the motor and accessory circuits.
| Cable | Cross-section and length |
|---|---|
| 230 V mains | 3 × 1.5 mm² up to 30 m; for longer runs, use 3 × 2.5 mm² and provide appropriate grounding. |
| BlueBUS | 2 × 0.5 mm² up to 20 m; use 2 × 1 mm² for runs up to 40 m. |
| Key switch | 2 cables, each 2 × 0.25 mm², up to 30 m; alternatively, use one 4 × 0.5 mm² cable. |
| OPEN / CLOSE | 2 × 0.25 mm² up to 30 m for each input. |
| Flashing light / indicator | 2 × 0.5 mm² up to 30 m; the device voltage must match the output setting. |
| Master–Slave | 2 × 1 mm² up to 20 m. |
| Antenna | RG58 coaxial cable, maximum 15 m; a length under 5 m is recommended. |
BCU1 R10 control unit: diagram and terminals
Disconnect the mains and battery before wiring. The terminal blocks are removable; connect the wires according to the markings on your own board. The following diagram is for a control unit with a display and rotary selector.
| Terminal / connector | What connects here |
|---|---|
| FLASH | Flashing light, standard 12 V DC, max. 21 W. OU2 changes both the function and voltage; check the current setting before connecting. |
| LIGHT | Boom lights, standard circuit 24 V DC, max. 10 W; OU1 function. |
| OGI | Barrier indicator, 24 V DC, max. 10 W; its behavior is determined by OU3. |
| 24 V DC (+ / −) | Separate 24 V DC power supply for compatible accessories: exact terminal polarity, tolerance −30% / +10%, 500 mA maximum in total. |
| BlueBUS | Two-wire power supply and communication for compatible accessories; no polarity. |
| STOP | NO or NC contact, or 8.2 kΩ resistor, with no +/− polarity; the type is detected during learning. A subsequent change of state stops the operation. |
| SbS / OPEN / CLOSE | Voltage-free NO switching contacts, with no polarity, for step-by-step, open, or close commands. The In1–In3 assignment can be changed. |
| HP SbS | Voltage-free NO input with no polarity and high priority; In4 = 6 by default. |
| LOOP1 / LOOP2 | Voltage-free NO contact from the external detector output, with no polarity. The detector has a separate power supply, which must match its specifications; do not connect the loop itself to these inputs. |
| MASTER–SLAVE | Communication between two opposing barriers; maintain the 1–1 and 2–2 connections. |
| SAFETY | NC safety contact for the breakaway boom, depending on the equipment used. |
| INTERNAL LIGHT | Dedicated connector for XBA7 or XBA8, OU4 function. |
| ANTENNA / SM | Antenna: connect the center conductor and shield as shown in the diagram; these are not +/− power terminals. SM is a dedicated socket for a compatible receiver; do not connect an external 24 V power supply to it. |
24 V DC accessory power supply: positive and negative
To power a compatible external receiver or key-switch lighting, use a separate 24 V two-pole terminal block on HP SbS and LOOP1. It provides 24 V DC, tolerance −30% / +10%, maximum 500 mA total for all devices powered from this output. Check their voltage, polarity and combined current draw.
As viewed in the image below, minus (−) is on the left and plus (+) is on the right. This order applies to the 24 V terminal block shown; do not assume it applies to another connector.
| BCU1 R10 terminal | Connecting accessories |
|---|---|
| 24 V: minus (−) | Left pole in the image → device power terminal − / 0 V / GND according to the markings on its power input. |
| 24 V: plus (+) | Right pole in the image → power terminal + / +24 V of a device rated for this voltage range. |
| Command contact | If the device controls the barrier via a relay output, connect its COM and NO to the two terminals of the selected input SbS, OPEN or CLOSE. This is a polarity-free, voltage-free contact, isolated from the +/− power supply. Do not apply supply voltage to the input. |
BlueBUS has no +/− polarity: connect both BlueBUS terminals on the photocell TX and RX in parallel to the board’s two BlueBUS terminals. EPMB photocells must not be connected to a separate auxiliary 24 V output. Use the STOP, LOOP1/LOOP2 and command inputs according to their contact type; they are not accessory power outputs.
When testing, also check the behaviour of connected devices in the selected Stand-by mode. The board switches off some circuits in this mode; verify the availability of the required controls and safety functions in the complete system.
BlueBUS photocells and STOP input
EPMB photocells are connected in parallel to the two BlueBUS wires. The TX and RX units of one pair must have the same address; an additional pair requires a different one. For safety protection of the passage, use the FOTO, FOTO II, FOTO 1 or FOTO 1 II addresses according to position and function. FA1/FA2 are command addresses for opening and do not replace the photocells’ safety function.
After adding or removing photocells or changing the STOP configuration, perform Set 1 and retest the safety functions. Do not disable STOP by bridging a fault; the connection of multiple safety devices must take account of their type and monitoring.
Lights, warning light and traffic light
XBA4 is fitted into the boom slot according to its own instructions. XBA7 and XBA8 connect to INTERNAL LIGHT. Before changing any OU1–OU4 setting, check the output voltage and maximum power rating. Do not confuse the traffic-light connector with the terminal for a standard external warning light.
FLASH, LIGHT and OGI are separately controlled outputs. The +/− order of the 24 V terminal block shown above does not indicate their polarity. For LEDs or other polarity-sensitive devices, follow the markings on the specific board output and the wiring instructions for the accessory; the pole order is not shown in this diagram. Connect XBA7/XBA8 using the supplied INTERNAL LIGHT connector and PS224 using its own BATTERY connector, not to the auxiliary 24 V supply.
Initial start-up and setup
Before switching on, the boom must be installed with all accessories, balanced and secured. Check the end stops, direction switch, safety devices and clear passage. After connecting the mains, the display and photocell LEDs should light up; with the default settings, the warning light should remain off when the barrier is not moving.
1. Set → 1: BlueBUS and STOP setup
- Turn the selector to find Set.
- Briefly press the selector and choose the value 1 then press again to confirm.
- The control unit detects the connected devices and the type of STOP input. Perform the setup even when no accessories are connected.
If error E01 remains, check the wiring and compatibility; do not simply repeat setup without resolving the cause.
2. Set → 2: mechanical position setup
- Disengage the motor, manually position the boom at approximately 45° and re-engage the gearbox.
- On the selector, choose Set → 2 and confirm.
- Let the control unit complete the setup for the full travel. The balancing lever must reach the set mechanical stops.
- If it does not reach the stops, stop the setup by pressing the selector, adjust the mechanism and start again. After each interruption, the procedure restarts from the beginning.
Menu 8.8.8. starts the quick combined setup of devices and positions. With this option too, first manually position the boom at approximately 45° and re-engage the gearbox. Keep the movement area clear. Device and position setup does not program the remote-control buttons.
3. Movement and safety checks
Use the OPEN and CLOSE buttons to perform several complete cycles. The boom should slow down before reaching the stops; it must not catch, drop suddenly or vibrate excessively. Test each pair of photocells, STOP, manual release, power failure and any Master–Slave configuration.
Also check the risk of a person being lifted by the boom: the test uses a 20 kg load at the midpoint of the boom and, when opening, the boom must not rise more than 50 cm above the closed position. Measure impact force in accordance with the requirements for the specific installation; photocells or reducing the force alone do not replace a complete risk assessment.
Programming the BCU1 R10 using the rotary selector
The control unit is configured using the rotary selector and a three-digit display. Record the original value before changing it; changes to force, speed and safety functions require the barrier to be tested again.
- Turn the selector in either direction to choose the parameter code.
- Briefly press and release it. The saved value is displayed; the display remains steadily lit.
- Turn the selector to choose a new value. The display flashes while you make your selection.
- Press and release to confirm the value. The control unit returns to the parameter selection.
Select ESC exits without saving the change. Display --- indicates a configuration set via OVIEW; it is not another selectable value. In the tables, the confirmed factory setting is shown in bold; the actual control board may have values changed during installation.
Operating functions F01–F09
| Parameter and purpose | Values and operation |
|---|---|
| F01 – Automatic closing Applies after fully opening. | OFF – semi-automatic operation: close by command (factory setting) On – closes after time t01 |
| F02 – Closing after photocell activation After the selected safety device is cleared, it starts counting time t10. | OFF – disabled (factory setting) 1 – open only until the photocell is cleared: activation stops movement; once cleared, t10 starts and the gate closes 2 – open fully: activation causes the gate to open fully; a new open command during t10 cancels the subsequent closing 3 – open fully 2: same as value 2, but a new open command during t10 does not cancel the subsequent closing |
| F03 – Device for F02 | 1 – photocells and loops configured as photocells (factory setting) 2 – photocells only 3 – loops configured as photocells only |
| F04 – Close after power is restored Before enabling this function, assess the safety of automatic movement after a power failure. | OFF – disabled (factory setting) 1 – if the arm is not closed, the warning light flashes for t09 after power is restored, then the arm closes 2 – resumes automatic closing if the pause timer was running before the power failure |
| F05 – Standby Standby is entered after time t04; a new command restores operation. | OFF – disabled (factory setting) 1 – switches off the display, BlueBUS, outputs and some internal circuits 2 – switches off BlueBUS 4 – when powered by the battery, automatically enters full standby |
| F06 – Starting force | OFF – disabled (factory setting) On – when starting from the open or closed position, briefly applies maximum power to overcome static friction |
| F07 – Emergency opening Requires a connected, working battery. | OFF – disabled (factory setting) On – automatically opens the arm if mains power fails |
| F09 – Master / Slave | OFF – Master barrier (factory setting) On – Slave barrier; see Master–Slave procedure |
Times, speeds, force and input functions
| Parameter and purpose | Available values |
|---|---|
| 8.8.8. – Quick setup | Starts BlueBUS, STOP and position learning in a single sequence. First, meet the startup requirements. |
| Set – Learning | 1 – BlueBUS and STOP devices 2 – open and closed positions |
| Prn – Program | 000 – basic program (factory setting) 001 / 002 / 003 – reserved custom programs; not normally used |
| t01 – Pause before closing Effective when F01 = On. | 0–250 s Factory setting: 20 s |
| t02 – Pre-flashing before opening Time between the warning light turning on and opening starting. | 0–5.0 s Factory setting: 0 s |
| t03 – Pre-flashing before closing Time between the warning light turning on and closing starting. | 0–5.0 s Factory setting: 0 s |
| t04 – Standby delay Time from the end of a manoeuvre until enabled F05 activates. | 0–60 s Factory setting: 60 s |
| t06 – Electromagnet delay After the locking electromagnet is disconnected, the unit waits before opening. Set using parameter t06 on the specified BCU1 R10 control board. | 0–3.0 s Factory setting: 0.2 s |
| t07 – Auxiliary light duration How long the output configured as an auxiliary light remains on. | 0–250 s Factory setting: 60 s |
| t09 – Pre-flashing after power is restored Used by function F04. | 0–20 s Factory setting: 5 s |
| t10 – Closing after photocell activation Time after the device is cleared when F02 is enabled. | 0–250 s Factory setting: 5 s |
| SPO – Opening speed | 1 – lowest 2 – level 2 3 – level 3 4 – highest (factory setting) |
| SPC – Closing speed | 1 – lowest 2 – level 2 3 – level 3 4 – highest (factory setting) |
| SLO – Slowdown during opening | 1 – lowest speed 2 – medium speed (factory setting) 3 – highest speed |
| SLC – Slowdown during closing | 1 – lowest speed 2 – medium speed (factory setting) 3 – highest speed |
| PLO – Slowdown position during opening Distance between the end position and the start of slowdown. | 1 – 0° (factory setting) 2 – approximately 10° 3 – approximately 20° |
| PLC – Slowdown position during closing Distance between the end position and the start of slowdown. | 1 – 0° (factory setting) 2 – approximately 10° 3 – approximately 20° |
| FrO – Opening force Does not replace mechanical balancing. | 1 – lowest 2 – level 2 3 – medium (factory setting) 4 – level 4 5 – level 5 6 – maximum |
| FrC – Closing force Does not replace mechanical balancing. | 1 – minimum 2 – level 2 3 – medium (factory setting) 4 – level 4 5 – level 5 6 – maximum |
| tF – Force limit intervention time A higher value increases the time before an obstacle is detected. | 3–32, each unit = 30 ms Range: 90–960 ms Factory setting: 3 = 90 ms |
| In1 – SbS input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 1 Meaning of input codes; for In2, code 25 controls Master only. |
| In2 – OPEN input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 3 Meaning of input codes; for In2, code 25 controls Master only. |
| In3 – CLOSE input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 4 Meaning of input codes; for In2, code 25 controls Master only. |
| In4 – HP SbS input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 6 Meaning of input codes; for In2, code 25 controls Master only. |
| SE1 – Step-by-step sequence | 1 – industrial: semi-automatic opening, closing by holding the command 2 – open – stop – close – stop 3 – open – stop – close – open 5 – residential step-by-step mode (factory setting) 6 – hold-to-run control |
| SE3 – OPEN sequence | 1 – open – stop – open 2 – residential opening mode (factory setting) 3 – opening by holding the command |
| SE4 – CLOSE sequence | 1 – close – stop – close 2 – residential closing mode (factory setting) 3 – closing by holding the command |
| SE5 – Photocell function during closing | 1 – stop and reverse to open (factory setting) 4 – stop temporarily; open when the photocell is cleared 5 – stop temporarily; close when the photocell is cleared |
| SE6 – STOP during opening | 1 – stop immediately 2 – stop and briefly reverse to close (factory setting) |
| SE7 – STOP during closing | 1 – stop immediately 2 – stop and briefly reverse to open (factory setting) |
| SE8 – Obstacle during opening | 2 – stop and briefly reverse to close (factory setting) 3 – stop and fully reverse to close |
| SE9 – Obstacle during closing | 2 – stop and briefly reverse to open 3 – stop and fully reverse to open (factory setting) |
| LO1 – LOOP1 function | 1 – open – open, NO contact (factory setting) 2 – close – close, NO contact 4 – photocell, NC contact |
| LO2 – LOOP2 function | 1 – open – open, NO contact 2 – close – close, NO contact (factory setting) 4 – photocell, NC contact |
In hold-to-run mode, the arm moves only while the contact is active. Residential mode prevents opening from being interrupted by further commands; test its behavior in your own setup before use. F02 determines automatic closing after the safety device is cleared, while SE5 determines the arm's response when triggered during closing—these settings are not interchangeable.
Meaning of In1–In4 command codes
| Code | Command |
|---|---|
| 0 | No command. |
| 1 | Step-by-step operation according to SE1. |
| 3 | Opening according to SE3. |
| 4 | Closing according to SE4. |
| 6 | High-priority step-by-step operation, effective even when software-locked. |
| 7 | Open and software-lock. |
| 8 | Close and software-lock. |
| 11 | Switch on the timed auxiliary light; it switches off after the set time. |
| 12 | Switch the auxiliary light on/off; the set time also applies. |
| 16 | Photocell. |
| 19 | Software-unlock and open. |
| 20 | Software-unlock and close. |
| 21 | Enable opening via BlueBUS command photocells. |
| 22 | Disable opening via BlueBUS command photocells. |
| 25 | Master and Slave step-by-step operation; for In2, controls Master only. Verify the assignment by testing both arms before operation. |
| 26 | Open both Master and Slave. |
| 27 | Close both Master and Slave. |
| 28 | Step-by-step operation of Slave only. |
| 29 | Open Slave only. |
| 30 | Close Slave only. |
OU1–OU4 outputs and indicators
Changing the function may also change the output voltage. External 24 V functions are limited to 10 W at the relevant output; the 12 V warning light on FLASH is limited to 21 W. Always check the device, voltage and power consumption before connecting it. INTERNAL LIGHT is a connector for the XBA7/XBA8 accessory module.
| Output | Code and function |
|---|---|
| OU1 – LIGHT | 0 – 24 V flashing light 1 – OGI indicator 2 – barrier closed 3 – barrier open 4 – flashing boom light (factory setting) 5 – maintenance indicator 6 – courtesy light 8 – red traffic light 9 – green traffic light 10 – radio channel 1 11 – radio channel 2 12 – radio channel 3 13 – radio channel 4 14 – locking electromagnet |
| OU2 – FLASH | 0 – 24 V flashing light 1 – 12 V flashing light (factory setting) 2 – OGI indicator 3 – barrier closed 4 – barrier open 5 – flashing boom light 6 – maintenance indicator 7 – courtesy light 9 – red traffic light 10 – green traffic light 11 – radio channel 1 12 – radio channel 2 13 – radio channel 3 14 – radio channel 4 15 – locking electromagnet |
| OU3 – OGI | 0 – 24 V flashing light 1 – OGI indicator 2 – barrier closed (factory setting) 3 – barrier open 4 – flashing boom light 5 – maintenance indicator 6 – courtesy light 8 – red traffic light 9 – green traffic light 10 – radio channel 1 11 – radio channel 2 12 – radio channel 3 13 – radio channel 4 14 – locking electromagnet |
| OU4 – INTERNAL LIGHT | 0 – flashing light (factory setting) 1 – OGI indicator 2 – barrier closed 3 – barrier open 4 – courtesy light 5 – red traffic light 6 – green traffic light 7 – one-way traffic light 8 – alternating one-way traffic light 9 – pedestrian traffic light |
| Signalling mode | Description |
|---|---|
| Flashing light | Flashes during operation: 0.5 s on / 0.5 s off. |
| OGI | Closed: off; opening: slow flashing; closing: fast flashing; open: on. |
| Barrier closed / open | On only in the selected end position. |
| Flashing boom light | Flashes at 0.5 s intervals, even when the boom is stationary. |
| Maintenance | Below 80% of the set count: on for 2 s at the start of opening. From 80% to 100%: flashes during operation. Above 100%: flashes continuously. |
| Courtesy light | On while moving and afterwards until t07 has elapsed. |
| Red traffic light | Flashes slowly while closing, stays on when closed, and is off otherwise. |
| Green traffic light | Flashes slowly while opening, stays on when open, and is off otherwise. |
| Radio channels | A command on the corresponding channel activates the output; any command addressed to the control unit is ignored. |
| Locking electromagnet | Active when closed; switches off before opening, and the electromagnet delay time is applied (check whether your control board is marked t06 or t05). |
| OU4 = 7 | Green when the boom is open, red in all other states. |
| OU4 = 8 | For the inside, use In2 or LOOP1 set to open; for the outside, use In3 or LOOP2 set to open. Green is assigned to the side that issued the command; the opposite side shows red. When closed or closing, both sides show red. |
| OU4 = 9 | When closed, green on the inside and red on the outside; when open, the reverse. In intermediate positions, both sides show red. |
Counters, versions and service data
| Menu | Use |
|---|---|
| MnP – Set number of operations | Press to display the values in sequence: a = units, b = thousands, c = millions. Used for maintenance signalling. |
| MnE – Number of operations completed | Press to display the values in sequence: t = units, u = thousands, v = millions. |
| ErS – Reset | 1 – devices; 2 – positions; 3 – function values; 5 – everything. Procedure and subsequent learning. |
| Fir – Firmware version | Press twice to display the two three-digit parts of the identifier. |
| Hdr – Hardware version | Press three times to display the three three-digit parts of the identifier. |
| din – Input diagnostics | Input and display statuses. |
Resetting the control board does not reset the service counter. Reset it using OVIEW only after maintenance has been completed and recorded.
Two opposing barriers: Master–Slave
Two complete barriers can be synchronised. Each has its own motor, control unit and power supply; they are not connected as two motors on one control board. Connect the communication terminals 1–1 and 2–2 using a 2 × 1 mm² cable, up to 20 m long.
- Complete the installation, direction, balancing and electrical connections on both barriers.
- On the slave barrier, perform Set 1 and Set 2, set its speeds, deceleration and force, then set F09 = On.
- On the master barrier, perform Set 1 and Set 2. Until then, the Slave may report communication error E05.
- Send a command from the main unit and check the movement of both arms and the safety devices.
Shared BlueBUS devices and the receiver belong on the Master. The Slave's own SbS/OPEN/CLOSE commands can operate only its own arm. Speed, deceleration, deceleration position and force are set separately for each barrier. For backup power, each barrier needs its own PS224.
Remote control and backup power
Receiver and remote controls
The control board has an SM socket for a compatible receiver. Current selection OXIBD allows you to use compatible remote controls, such as ON2E. Connect the receiver with both mains power and the battery disconnected. Program and delete remote controls according to the specific receiver; resetting the control board does not replace the receiver's radio programming procedure.
PS224 in the event of a power failure
PS224 is connected only after installation and programming are complete: disconnect the mains, install the battery and connect the specified cable to the backup power connector; then restore the mains power. Mode F05 = 4 can limit power consumption when running on battery power. The function F07 = On commands the barrier to open during a mains failure if a battery is present; it is not enabled by default.
Solemyo SYKCE30 is a different power supply option. When connecting Solemyo, the barrier must not be connected to the 230 V mains at the same time. Assess the power supply capacity based on the number of operating cycles and the accessories installed.
Troubleshooting and fault resolution
First, identify the code on the display or count the short flashes. The diagnostic sequence repeats after a pause of about 1 s; normal flashing during movement is not a fault code.
| Code / signal | What to check |
|---|---|
| E01 / 1 flash | BlueBUS/STOP devices changed or not learned. Check the wiring, then Set 1. |
| E02 | Positions not learned; after checking the stops and balance, perform Set 2. |
| E03 | Limit switches swapped; check their direction and electrical wiring. |
| E04 | Encoder signal missing; check the sensor connector and cable. |
| E05 | Communication error Master–Slave; check the polarity and learning of both barriers. |
| E06 / 5 flashes | Parameter memory error. Disconnect and restore power to all power sources, then try again; if the problem persists, service is required, or perform a full reset and relearning. |
| E07 / 7 flashes | Internal electronics error. Disconnect all power sources; if the fault recurs, arrange for service. |
| E08 | Barrier type configuration; check the factory setting on the control board. |
| E09 / 9 flashes | Software lockout. Enter the specified unlock command, or HP SbS; this is not mechanical unlocking with a key. |
| E10 | Missing NC safety contact or limit switch; check SAFETY and the switches. |
| E11 | BlueBUS short circuit. Check the wiring and devices; once the cause has been rectified, repeat the command. |
| I02 / 2 flashes | Photocell active. Remove the obstruction, clean the optics and check the alignment. |
| I03 / 3 flashes | Force limit triggered. First, check the balance, friction and stops. Do not increase the force to compensate for a mechanical fault. |
| I04 / 4 flashes | STOP triggered. Find the cause in the connected device; do not bypass the safety input. |
LEDs and din mode
STOP is lit when the input is normally enabled; if it goes out, the input has been triggered. The SbS, OPEN, CLOSE and HP SbS LEDs are lit when a command is active. The FC1/FC2 status depends on the RH/LH switch: with RH, FC1 goes out in the closed position and FC2 in the open position; with LH, the reverse applies.
Menu din displays inputs using display segments. First digit: A1 = Loop1, B1 = Close, C1 = HP SbS, D1 = Loop2, E1 = Open, F1 = SbS; dp1 flashes once per second while the control board is running. The second digit shows the limit switches, buttons, selected direction and battery power status; the third shows the photocells and connected Slave. Correct the direction using the mechanism and switch, not by randomly swapping wires.
Clearing settings and starting over
Select ErS, press the button, select the required value and confirm. 1 deletes learned devices, 2 positions, 3 function values, 5 all control unit data. After a full erase, repeat Set 1, Set 2, configuration and safety tests.
Control board reset does not reset the number of operating cycles performed. Reset the service counter after maintenance has actually been performed using OVIEW. Deleting transmitters is covered in the procedure for the specific receiver.
Manual release of the boom
In the event of a power failure, malfunction, or installation, stop operation, disconnect the power supply, and secure the area. Hold the boom; an improperly balanced boom may move by itself.
- Insert the release key and turn it by 180° to the left or right.
- Move the boom manually to the required position.
- To restore motorized operation, return the key to its original position and remove it. Check that the system is secured and that control has been safely restored.
Maintenance and service life
For an existing installation with BCU1 R10, schedule a professional inspection no later than 6 months or 20,000 maneuvers, whichever comes first. In intensive use, the cycle limit may be reached much sooner. Also check the balance after changing the boom equipment.
Disconnect all power sources and check for corrosion, the anchoring, bolts and spring attachment, shaft play, the condition of the boom, and the operation of the manual release. After restoring the power supply, repeat the safety-device and force tests. Record servicing and any spring replacement in the maintenance log.
Factors affecting estimated service life
| Characteristics of the entire automation system | Index | Service-life graph |
|---|---|---|
| XBA11 folding joint | 20% | |
| Speed, level 2 | 0% | |
| Speed, level 3 | 15% | |
| Speed, level 4 | No index is specified for calculating from this graph. | |
| Photocell interventions in more than 10% of maneuvers | 15% | |
| STOP interventions in more than 10% of maneuvers | 10% | |
| WA12 mobile support | Not permitted | |
| Salt in the environment | 10% | |
| Dust / sand | 5% | |
| Under-railing | Not permitted | |
| Temperature above 40 °C or below 0 °C | 5% | |
| Set force FrO / FrC | Level 4: 5% Level 6: 10% At level 5, do not use this graph to calculate the number of cycles. |
The table and graph must correspond to the specific barrier configuration. Add the indices for the applicable factors, find the total on the horizontal axis, and read the estimated number of cycles from the vertical axis. If there is no clearly defined index for the selected setting, or the total falls outside the graph’s range, do not estimate the number of cycles from it. The estimate assumes correct installation and regular maintenance; it does not guarantee a number of cycles or justify postponing servicing.
Technical specifications of the NICE M3BAR barrier
| Parameter | Value |
|---|---|
| Model | NICE M3BAR – without boom |
| Type | Electromechanical barrier with a 24 V DC motor and built-in control unit |
| Control unit | BCU1 R10 (XBA3 R10) |
| Mains supply | 230 V AC, 50/60 Hz |
| Motor voltage | 24 V DC |
| Current draw | 1.3 A |
| Maximum power consumption during start-up | 150 W |
| Power consumption at rated torque | 40 W |
| Operating time | 1.5–4 s |
| Starting torque | 100 Nm |
| Rated torque | 30 Nm |
| Max. frequency at rated torque | 500 cycles/h |
| Clear passage width | 2.32–2.82 m |
| Ingress protection rating | IP54 |
| Operating temperature | −20 to +55 °C |
| Cabinet dimensions | 400 × 299 × 1,215 mm (width × depth × height) |
| Weight | 80 kg |
| Insulation class | I |
| Backup power supply | PS224 |
Specifications apply at a reference temperature of approximately 20 °C. Assess the requirements of the specific installation in conjunction with the boom length, accessories, balancing, and safety tests.
The dimensional drawing also includes external protruding parts and provides detailed installation dimensions. Do not use only the rounded cabinet dimensions in the table to determine the placement.
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]


























