NICE LBAR barrier - without boom arm
| Product availability: | within 3 days | We usually dispatch goods within 3 days. |
|---|
within 3 days
€1,963.33 including VAT
| Weight |
|---|
| 85 kg |
Description of NICE LBAR barrier - without boom arm
NICE LBAR is an electromechanical barrier for controlled motor vehicle access, supplied without an arm. It has a 24 V DC motor and a built-in control unit BCU1 R10 (XBA3 R10). The standard configuration is powered from the 230 V AC; 24 V is the motor voltage.
It is designed for an arm described as 7, 8 or 9 m. It has a heavy-duty steel housing and a balancing spring. Elliptical aluminium arms XBA15, XBA14 and XBA5 can be joined in permitted combinations using the XBA9. The exact assembled arm length and its accessories determine the spring setting.
In the event of a power failure, the arm can be released with a key or operated using the PS224 backup battery. The housing can be fitted with the XBA7 flashing light or XBA8 traffic light. Two opposing barriers can be synchronised in Master–Slave.
For an existing barrier, first check the board marking. The following settings apply to the BCU1 R10 with display and rotary selector; the older XBA3 has different controls and is not interchangeable based solely on the similar name.
When to choose NICE LBAR
| What to check | Specification and meaning |
|---|---|
| Clear opening width | 7–9 m |
| Adjustable operating time | 8–12 s with the stated BCU1 R10 configuration |
| Max. cycles at rated torque | 150 cycles/h |
| Arm | Supplied separately; component and connector combinations |
| Manual release | Using a key during a power failure or servicing |
| Two opposing barriers | Master–Slave synchronisation |
The arm length is not the clear passage width. When selecting, allow for the space taken up by the housing and bracket; check the final clear opening on site. Operating time depends on the settings, arm and its accessories. The maximum number of cycles does not guarantee unlimited operation under every load.
The barrier is intended for vehicles. Arm movement must not endanger pedestrians; provide a separate pedestrian passage and select safety devices based on the risks at the specific entrance. Before installation, also check the overhead clearance with the arm in the open position.
Arm accessories and their limitations
| Accessory | Condition |
|---|---|
| Rubber and lights | Permitted when the arm is the correct length and is properly wired and balanced. Choose the light strip to match the actual arm length. |
| Under-barrier skirt WA13 | Only for 7.33 or 8.33 m configurations, according to the spring table. The table does not list this accessory for a 9.33 m arm; do not fit it unless a solution has been confirmed. |
| Mobile support WA12 | Allow for this with 7.33 m and 8.33 m arms. Do not use it with a 9.33 m arm unless an individual solution has been confirmed. |
| XBA11 folding joint | Not permitted for LBAR. It is not a solution for low ceilings with this barrier. |
After adding lights, rubber, a support or an under-barrier skirt, select the spring attachment and balancing. Increasing the motor power does not replace correct mechanical adjustment.
What the boom is made up of
| Boom identification | Parts | What to check |
|---|---|---|
| 7 m | XBA15 + XBA14 + XBA9 | Spring table: 7.33 m; shorter section goes next to the housing. |
| 8 m | 2 × XBA14 + XBA9 | Spring table: 8.33 m. |
| 9 m | XBA14 + XBA5 + XBA9 | Spring table: 9.33 m; shorter section goes next to the housing. |
XBA15 is 3,150 mm, XBA14 is 4,150 mm and XBA5 is 5,150 mm long. Do not use the nominal 6, 7, 8 or 9 m designation as an exact installation dimension. Measure the assembled boom length and clear passage width before installation. The XBA9 connector does not allow the barrier limits to be exceeded.
Barrier kits with boom and accessories
To order a complete assembly with a boom, choose from the available kits. The stated length refers to the boom, not the clear passage width. Kits from different ranges have different control units and limits; open the kit listing to see its exact contents.
| NICE LBAR barrier kits | |
|---|---|
LBAR – 8 m boom![]() | LBAR – 9 m boom![]() |
Accessories compatible with the LBAR barrier
Choose accessories to suit the boom length and operating conditions. Even compatible accessories have mechanical and electrical limitations; not all accessories can necessarily be used at the same time.
| What | Why | Type |
|---|---|---|
| The housing does not include a boom. Choose the sections and connector to suit the specific length. | ||
| Joins two boom sections; installation procedure. Use the connector only with the compatible sections specified for this barrier. | ||
| Height-adjustable support for the end of the lowered boom. This is not a support attached to the boom. | ||
| Fold-down support mounted on the boom. Check the permitted lengths and its load capacity in the spring table. | ||
| Aluminium barrier skirt, 2 m section. Only for permitted configurations; length-dependent limitations. | ||
| 24 red stickers to improve boom visibility. | ||
| XBA18 is an 8 m strip; it does not automatically cover the full 9 m boom. Check the number and wiring against the power consumption at the LIGHT output. | ||
| 9 sections, each 1 m long. Mechanical edge protection; does not replace a monitored safety edge. | ||
| 24 V rechargeable battery for operation during a power failure; the number of cycles depends on the charge level and equipment. | ||
| Indicates movement and diagnostics via INTERNAL LIGHT. | ||
| Controls traffic flow according to the INTERNAL LIGHT / OU4 setting. | ||
Photocells | Two-wire BlueBUS. After changing the wiring, carry out Set 1. | |
Remote control | SM receiver and remote control with matching coding; if using an existing receiver, check which remote-control family is already stored. | |
Control board | Replacement board for the generation with a display and selector. The barrier already has a control unit; no additional external controller is needed. | |
Service and setup | BUS T4 interface for diagnostics and the service counter. | |
Solar power supply | Alternative power source instead of mains electricity. Do not connect 230 V at the same time with this wiring. |
Installing the cabinet and boom
Disconnect both the mains supply and backup battery before starting work. Check that the base is stable, drainage is adequate, there is room for the full boom, and the release mechanism is safely accessible.
Foundation plate and anchoring
If the existing foundation is suitable, mark four holes to match the cabinet and select anchors appropriate for the substrate. For a new foundation, prepare conduits, the four supplied anchor bolts, and a level foundation plate positioned parallel to the boom.
| Substrate check | Requirement |
|---|---|
| Concrete foundation | Reinforced concrete, at least 0.15 m thick and with a volume greater than 0.2 m³. Determine the foundation dimensions according to local conditions. |
| Concrete anchors | 4 anchors with 12 MA (M12) bolts, each with a tensile load capacity of at least approximately 3.9 kN. |
| Other load-bearing material | Check that the substrate and all four anchoring points can withstand a load of at least approximately 9.8 kN. |
| Installation | Keep the plate level with the surface; secure the cabinet only after the concrete has fully cured. |
Attaching and assembling the boom
For a two-piece boom, the shorter section attaches to the barrier cabinet. Insert the specified reinforcing insert into its end at the bracket: 700 mm for LBAR. This insert is not the XBA9 connector that joins the two boom sections.
- Insert the two specified pins into the output shaft. Fit the bracket in the position for the vertical boom, and secure it with bolts and spring washers.
- Fit the cover onto the bracket using six screws; leave them loose for now.
- Insert the supplied connector insert into the end of the correct aluminium boom and secure it with a screw.
- Insert the protective rubber strip and corresponding connectors into the grooves, then fit the end cap and rubber-strip caps.
- Slide the complete boom fully into the bracket and tighten all six screws securely.
- Install the selected accessories, then complete the spring adjustment, balancing, and learning procedure.
Joining two sections with XBA9
- Insert the XBA9 connector into the open ends of both sections. The holes in the booms and connector must align.
- The connector's three expansion bolts should be loosened evenly as shown in the illustration. This expands the mechanism and locks the connector inside the booms; it is not tightened like a standard fastening bolt.
- Check that the joint is secure and free of play. Complete balancing and testing only after assembling the boom and fitting its accessories.
Left- or right-hand barrier installation
The spring side must match the direction switch setting on the board. RH/DX is for the spring on the right-hand side of the balancing lever, LH/SX for the spring on the left-hand side. A technician must change the mechanical configuration with the spring safely released; simply switching the direction setting without changing the mechanism is not sufficient.
Spring attachment and boom balancing
Select according to the exact model, actual length, and all fitted accessories. The upper attachment is marked with the letter A or B, and the lower one with the number 1, 2, or 3. Use the lever holes marked for LBAR. For the opposite closing direction, use the corresponding holes on the other side of the lever.
For the maximum-length boom with protective rubber, or with rubber and lights, use section A of the original table: L9BAR, 9.33 m = B / 1. For shorter booms and additional accessories, use section B. The L9BAR designation in the table applies to this LBAR family; also check the actual barrier's label before carrying out any work.
Accessory indexes for section B
| Boom accessory | Index |
|---|---|
| XBA13 protective rubber strip | 0 |
| Protective rubber strip with XBA4/XBA6/XBA18 lights | 1 |
| WA12 | 3 |
| WA13 | 2 at 7.33 and 8.33 m |
Add the corresponding index for each accessory used. The “rubber” and “rubber with lights” rows are alternatives and must not be added together. Each additional accessory increases the load; both the total and the number of pieces must remain within the permitted range for the configuration. A dash indicates an impermissible combination.
| Exact boom configuration | Mounting based on the sum of the indices |
|---|---|
| XBA15 + XBA14, 7.33 m | 0–2: A / 1 3–4: A / 2 5–6: A / 3 |
| 2 × XBA14, 8.33 m | 0–2: A / 3 3–6: B / 1 |
| XBA14 + XBA5, 9.33 m | Section A: B / 1, protective rubber or rubber with lights. Section B is not specified for this length. |
Use the positions shown only when the illustrated bracket and spring arrangement match. For a different mechanical version, follow the instructions supplied with the specific barrier; do not interchange hole positions between versions.
If the table does not cover the length, equipment, or resulting total, do not estimate the mounting position. Before moving the spring, a technician must secure the boom and safely release its preload. Do not remove the boom from its bracket while the spring is under load.
Balance check at 45°, 20°, and 70°
- Disconnect the mains power and battery. Support the boom securely, release the gear unit, and set it to approximately 45°.
- If the boom rises, reduce the preload by turning adjustment nut C clockwise. If it lowers, increase it by turning counterclockwise.
- Repeat the check at approximately 20° and 70°. The boom must not move significantly on its own or accelerate as it falls.
- When finished, engage the gear unit.
With the motor disengaged, the force required to move the boom manually in either the opening or closing direction must not exceed approximately 65 N. This is the maximum permitted imbalance, not the adjustment target. Measure the force perpendicular to the boom, 1 m from the pivot; it does not indicate the impact force of the powered boom.
Mechanical stops
After releasing the drive, move it manually through its full travel. Use the stop screws to set the horizontal closed and vertical open positions, then tighten the locknuts. Then perform Set 2 position learning. Electronic learning does not replace correctly adjusted mechanical stops.
Wiring and power supply separation
Connect the 230 V mains cable to the L/N mains terminal block and connect the protective conductor as shown in the original installation. Secure the cable with a cable gland and strain relief. Do not apply 230 V to the command inputs or BlueBUS. Do not interchange the motor and accessory circuits.
| Cable run | Cross-section and length |
|---|---|
| 230 V mains | 3 × 1.5 mm² up to 30 m; for longer runs, use 3 × 2.5 mm² and appropriate grounding. |
| BlueBUS | 2 × 0.5 mm² up to 20 m; use 2 × 1 mm² for runs up to 40 m. |
| Key switch | Two 2 × 0.25 mm² cables up to 30 m; alternatively, use one 4 × 0.5 mm² cable. |
| OPEN / CLOSE | 2 × 0.25 mm² up to 30 m per input. |
| Flasher / indicator | 2 × 0.5 mm² up to 30 m; the device voltage must match the output setting. |
| Master–Slave | 2 × 1 mm² up to 20 m. |
| Antenna | RG58 coaxial cable, max. 15 m; recommended length under 5 m. |
BCU1 R10 control unit: diagram and terminals
Disconnect the mains power and battery before wiring. The terminal blocks are removable; connect the wires according to the markings on the actual board. The following diagram is for the control unit with a display and rotary selector.
The mains supply must have protective earth (PE) and a suitable device for complete disconnection from the mains. Check the protective devices when connecting 230 V. Mains voltage must not reach the command or accessory terminals.
| Terminal / connector | What to connect |
|---|---|
| FLASH | Flasher, standard 12 V, max. 21 W. OU2 changes both the function and the voltage; check the current setting before connecting. |
| LIGHT | Boom lights, standard circuit 24 V, max. 10 W; OU1 function. |
| OGI | Barrier indicator, 24 V, max. 10 W; its operation is determined by OU3. |
| BlueBUS | Two-wire power supply and communication for compatible accessories, with no polarity requirement. |
| STOP | NO, NC, or 8.2 kΩ; the type is identified during learning. A subsequent change of state stops the maneuver. |
| SbS / OPEN / CLOSE | Voltage-free NO switching contacts for step-by-step, opening, or closing commands. The In1–In3 assignments can be changed. |
| HP SbS | High-priority NO command input, In4 = 6 by default. |
| LOOP1 / LOOP2 | Connection for the output of an induction loop detector. The loop itself must not be connected directly as a command contact. |
| MASTER–SLAVE | Communication between two opposing barriers; maintain connections 1–1 and 2–2. |
| SAFETY | NC safety contact for the breakaway boom, depending on the equipment used. |
| INTERNAL LIGHT | Dedicated connector for XBA7 or XBA8, OU4 function. |
| ANTENNA / SM | Coaxial antenna and a separate socket for a compatible receiver. |
BlueBUS photocells and STOP input
EPMB photocells are connected in parallel to the two BlueBUS wires. The TX and RX of one pair must have the same address; another pair requires a different one. For safety protection across the passage, use the FOTO, FOTO II, FOTO 1, or FOTO 1 II addresses according to their position and function. FA1/FA2 are command inputs for opening and do not replace the safety function of photocells.
After adding or removing photocells or changing the STOP input, perform Set 1 and a new safety function test. Do not disable STOP by bypassing a fault; wiring multiple safety devices must take their type and monitoring into account.
For the stated BCU1 R10 configuration, the BlueBUS load is no more than 10 BlueBUS units. Calculate the power consumption using the instructions for each device; the number of units is not necessarily the same as the number of physical devices.
Lights, warning beacon and traffic light
XBA6 / XBA18 are fitted into the boom slot according to their own instructions. XBA7 and XBA8 are connected to INTERNAL LIGHT. Before changing any of OU1–OU4, check the voltage and maximum output power. Do not confuse the traffic light connector with the terminal for a standard external warning beacon.
24 V power supply for additional accessories
Separate output 24 V DC for auxiliary devices has a tolerance of −30% to +10% and a maximum available current of 500 mA total. Add up the current draw of all devices powered this way. On its two-pole terminal block marked − + 24 V when viewed as shown in the image below, the left terminal is minus (−) and the right terminal is plus (+).
| 24 V auxiliary output terminal | Accessory power supply wire |
|---|---|
| Left: − | Minus (−), marked 0 V or GND on the device. |
| Right: + | Plus (+), marked +24 V on the device. |
This marking applies to the separate 24 V output shown below. BlueBUS photocells are connected without regard to polarity to their dedicated BlueBUS terminals. The SbS, OPEN, CLOSE and HP SbS command inputs use volt-free contacts; do not apply an external power supply to them.
Initial startup and learning
Before switching on, the boom must be installed with all its accessories, balanced and secured. Check the limit stops, direction switch, safety devices and clear passage. After connecting the mains supply, the display and photocell LEDs should light up; with the default settings, the warning beacon should not be lit when no manoeuvre is in progress.
1. Set → 1: BlueBUS and STOP learning
- Turn the selector until you find Set.
- Briefly press the selector and choose value 1 then press again to confirm.
- The control unit detects the connected devices and the type of STOP input. Run the learning procedure even if no accessories are connected.
If error E01 persists, check the wiring and compatibility; simply repeating the learning procedure without fixing the cause is not enough.
2. Set → 2: learning the mechanical positions
- Disengage the motor, manually position the boom at approximately 45° and re-engage the gearbox.
- On the selector, choose Set → 2 and confirm.
- Let the control unit run the learning procedure over the full travel. The balancing lever must reach the set mechanical stops.
- If it does not reach the stops, stop the learning procedure by pressing the selector, adjust the mechanism and start again. After each interruption, the procedure starts again from the beginning.
Menu 8.8.8. starts a quick combined learning procedure for devices and positions. With this option too, first manually position the boom at approximately 45° and re-engage the gearbox. Keep the movement area clear. Learning the devices or positions does not program the remote-control buttons.
3. Movement and safety checks
Use the OPEN and CLOSE buttons to run several complete cycles. The boom should slow down before reaching the stops; it must not catch, drop suddenly or vibrate excessively. Test each pair of photocells, STOP, manual release, power failure and any Master–Slave setup.
Also check the risk of a person being lifted by the boom: the test uses a 20 kg load at the midpoint of the boom and, when opening, the boom must not rise more than 50 cm above the closed position. Measure impact force according to the requirements of the specific installation; photocells or reducing the force do not, by themselves, replace a full risk assessment.
Programming the BCU1 R10 using the rotary selector
The control unit is configured using a rotary selector and a three-digit display. Before making a change, record the original value; changes to force, speed and safety functions require the barrier to be tested again.
- Turn the selector in either direction to choose the parameter code.
- Press it briefly and release. The stored value is displayed; the display stays lit.
- Turn the selector to choose a new value. The display flashes while selecting.
- Press and release to confirm the value. The control unit returns to parameter selection.
The option ESC exits the change without saving. The display --- indicates a configuration set via OVIEW; it is not an additional selectable value. In the tables, the confirmed factory setting is shown in bold; the actual control board may have values changed during installation.
Operating functions F01–F09
| Parameter and purpose | Values and operation |
|---|---|
| F01 – Automatic closing Applies after the barrier is fully open. | OFF – semi-automatic operation: close by command (factory setting) On – closes after time t01 |
| F02 – Closing after photocell activation After the selected safety device is released, the t10 timer starts. | OFF – disabled (factory setting) 1 – open only until the photocell is cleared: activation stops movement; once cleared, t10 starts and the gate closes 2 – open fully: activation triggers full opening; a new opening command during t10 cancels the subsequent closing 3 – open fully 2: same as value 2, but a new opening command during t10 does not cancel the subsequent closing |
| F03 – Device for F02 | 1 – photocells and loops configured as photocells (factory setting) 2 – photocells only 3 – loops configured as photocells only |
| F04 – Close after power is restored Before enabling this function, assess the safety of automatic movement after a power failure. | OFF – disabled (factory setting) 1 – if the arm is not closed, it flashes for t09 after power is restored, then closes 2 – resumes automatic closing if the pause timer was running before the power failure |
| F05 – Standby Standby is entered after t04; a new command restores operation. | OFF – disabled (factory setting) 1 – switches off the display, BlueBUS, outputs, and some internal circuits 2 – switches off BlueBUS 4 – when powered by battery, automatically enables full standby |
| F06 – Starting force | OFF – disabled (factory setting) On – when starting from the open or closed position, briefly applies maximum power to overcome static friction |
| F07 – Emergency opening Requires a connected, working battery. | OFF – disabled (factory setting) On – automatically opens the arm in the event of a mains power failure |
| F09 – Master / Slave | OFF – main barrier, Master (factory setting) On – secondary barrier, Slave; see Master–Slave procedure |
Times, speeds, force, and input functions
| Parameter and purpose | Available values |
|---|---|
| 8.8.8. – Quick setup | Runs BlueBUS, STOP, and position setup in a single sequence. First, meet the startup requirements. |
| Set – Setup | 1 – BlueBUS and STOP devices 2 – open and closed positions |
| Prn – Program | 000 – basic program (factory setting) 001 / 002 / 003 – reserved custom programs; not normally used |
| t01 – Pause before closing Active when F01 = On. | 0–250 s Factory setting: 20 s |
| t02 – Pre-flashing during opening Time between the warning light switching on and opening starting. | 0–5.0 s Factory setting: 0 s |
| t03 – Pre-flashing during closing Time between the warning light switching on and closing starting. | 0–5.0 s Factory setting: 0 s |
| t04 – Standby delay Time from the end of a cycle until enabled F05 activates. | 0–60 s Factory setting: 60 s |
| t06 – Electromagnet delay After the locking electromagnet is switched off, the system waits before opening. Used only when an electromagnet is installed and the output is configured accordingly. | 0–3.0 s Factory setting: 0.2 s |
| t07 – Auxiliary light duration How long the output configured as an auxiliary light stays on. | 0–250 s Factory setting: 60 s |
| t09 – Pre-flashing after power is restored Used by function F04. | 0–20 s Factory setting: 5 s |
| t10 – Closing after photocell activation Time after the device is cleared when F02 is enabled. | 0–250 s Factory setting: 5 s |
| SPO – Opening speed | 1 – slowest 2 – level 2 3 – level 3 4 – fastest (factory setting) |
| SPC – Closing speed | 1 – slowest 2 – level 2 3 – level 3 4 – fastest (factory setting) |
| SLO – Opening slowdown | 1 – slowest speed 2 – medium speed (factory setting) 3 – fastest speed |
| SLC – Closing slowdown | 1 – slowest speed 2 – medium speed (factory setting) 3 – fastest speed |
| PLO – Opening slowdown position Distance between the end position and the start of slowdown. | 1 – 0° (factory setting) 2 – approximately 10° 3 – approximately 20° |
| PLC – Closing slowdown position Distance between the end position and the start of slowdown. | 1 – 0° (factory setting) 2 – approximately 10° 3 – approximately 20° |
| FrO – Opening force Does not replace mechanical balancing. | 1 – lowest 2 – level 2 3 – medium (factory setting) 4 – level 4 5 – level 5 6 – highest |
| FrC – Closing force Does not replace mechanical balancing. | 1 – lowest 2 – level 2 3 – medium (factory setting) 4 – level 4 5 – level 5 6 – highest |
| tF – Force limit response time A higher value increases the time it takes to detect an obstacle. | 3–32, each unit = 30 ms Range: 90–960 ms Factory setting: 3 = 90 ms |
| In1 – SbS input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 1 Meaning of input codes; for In2, code 25 controls Master only. |
| In2 – OPEN input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 3 Meaning of input codes; for In2, code 25 controls Master only. |
| In3 – CLOSE input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 4 Meaning of input codes; for In2, code 25 controls Master only. |
| In4 – SbS HP input | Available codes: 0, 1, 3, 4, 6, 7, 8, 11, 12, 16, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30. Factory setting: 6 Meaning of input codes; for In2, code 25 controls Master only. |
| SE1 – Step-by-step sequence | 1 – industrial: semi-automatic opening, closing by holding the command 2 – open – stop – close – stop 3 – open – stop – close – open 5 – residential step-by-step mode (factory setting) 6 – hold-to-run control |
| SE3 – OPEN sequence | 1 – open – stop – open 2 – residential opening mode (factory setting) 3 – hold-to-run opening |
| SE4 – CLOSE sequence | 1 – close – stop – close 2 – residential closing mode (factory setting) 3 – hold-to-run closing |
| SE5 – Photocell function during closing | 1 – stop and reverse to open (factory setting) 4 – stop temporarily; open when the photocell is cleared 5 – stop temporarily; close when the photocell is cleared |
| SE6 – STOP during opening | 1 – stop immediately 2 – stop and briefly reverse to close (factory setting) |
| SE7 – STOP during closing | 1 – stop immediately 2 – stop and briefly reverse to open (factory setting) |
| SE8 – Obstacle during opening | 2 – stop and briefly reverse to close (factory setting) 3 – stop and fully reverse to close |
| SE9 – Obstacle during closing | 2 – stop and briefly reverse to open 3 – stop and fully reverse to open (factory setting) |
| LO1 – LOOP1 function | 1 – open – open, NO contact (factory setting) 2 – close – close, NO contact 4 – photocell, NC contact |
| LO2 – LOOP2 function | 1 – open – open, NO contact 2 – close – close, NO contact (factory setting) 4 – photocell, NC contact |
With hold-to-run control, the arm moves only while the contact is active. Residential mode limits interruption of opening by additional commands; check how it behaves in your setup before use. F02 determines whether the gate closes after the safety device is cleared; SE5 determines the arm's response when the safety device is triggered during closing—the settings are not interchangeable.
Meaning of In1–In4 command codes
| Code | Command |
|---|---|
| 0 | No command. |
| 1 | Step-by-step operation according to SE1. |
| 3 | Open according to SE3. |
| 4 | Close according to SE4. |
| 6 | High-priority step-by-step operation, active even when software-locked. |
| 7 | Open and software-lock. |
| 8 | Close and software-lock. |
| 11 | Switch on the timed auxiliary light; it switches off after the set time. |
| 12 | Switch the auxiliary light on/off; the set time also applies. |
| 16 | Photocell. |
| 19 | Software-unlock and open. |
| 20 | Software-unlock and close. |
| 21 | Enable opening by BlueBUS command photocells. |
| 22 | Disable opening by BlueBUS command photocells. |
| 25 | Step-by-step operation of Master and Slave; for In2, controls Master only. Verify the assignment by testing both arms before operation. |
| 26 | Open both Master and Slave. |
| 27 | Close both Master and Slave. |
| 28 | Step-by-step operation of Slave only. |
| 29 | Open Slave only. |
| 30 | Close Slave only. |
OU1–OU4 outputs and indicators
Changing the function may also change the output voltage. External 24 V functions have a 10 W limit on the relevant output; the 12 V FLASH beacon has a 21 W limit. Always check the device, voltage and power consumption before connecting. INTERNAL LIGHT is a connector for the dedicated XBA7/XBA8 module.
| Output | Code and function |
|---|---|
| OU1 – LIGHT | 0 – 24 V beacon 1 – OGI indicator 2 – gate closed 3 – gate open 4 – flashing arm light (factory setting) 5 – maintenance indicator 6 – auxiliary light 8 – red traffic light 9 – green traffic light 10 – radio channel 1 11 – radio channel 2 12 – radio channel 3 13 – radio channel 4 14 – locking electromagnet |
| OU2 – FLASH | 0 – 24 V beacon 1 – 12 V beacon (factory setting) 2 – OGI indicator 3 – barrier closed 4 – barrier open 5 – flashing boom light 6 – maintenance indicator 7 – auxiliary light 9 – red traffic light 10 – green traffic light 11 – radio channel 1 12 – radio channel 2 13 – radio channel 3 14 – radio channel 4 15 – locking electromagnet |
| OU3 – OGI | 0 – 24 V beacon 1 – OGI indicator 2 – barrier closed (factory setting) 3 – barrier open 4 – flashing boom light 5 – maintenance indicator 6 – auxiliary light 8 – red traffic light 9 – green traffic light 10 – radio channel 1 11 – radio channel 2 12 – radio channel 3 13 – radio channel 4 14 – locking electromagnet |
| OU4 – INTERNAL LIGHT | 0 – beacon (factory setting) 1 – OGI indicator 2 – barrier closed 3 – barrier open 4 – auxiliary light 5 – red traffic light 6 – green traffic light 7 – one-way traffic light 8 – alternating one-way traffic light 9 – pedestrian traffic light |
| Signal mode | Meaning |
|---|---|
| Beacon | Flashes during operation: 0.5 s on / 0.5 s off. |
| OGI | Closed: off; opening: flashes slowly; closing: flashes rapidly; open: on. |
| Barrier closed / open | On only at the selected end position. |
| Flashing boom light | Flashes every 0.5 s, even when the boom is stationary. |
| Maintenance | Below 80% of the set count: on for 2 s at the start of opening. From 80% to 100%: flashes during operation. Above 100%: flashes continuously. |
| Auxiliary light | On while moving and afterward until t07 expires. |
| Red traffic light | Flashes slowly while closing, stays on when closed, and is off otherwise. |
| Green traffic light | Flashes slowly while opening, stays on when open, and is off otherwise. |
| Radio channels | A command on the corresponding channel activates the output; any command assigned to the control unit is ignored. |
| Locking electromagnet | Active when closed; switches off before opening, and the unit waits for time t06. |
| OU4 = 7 | Green when the boom is open, red in all other states. |
| OU4 = 8 | For the inside, use In2 or LOOP1 set to open; for the outside, use In3 or LOOP2 set to open. Green is assigned to the side that issued the command; the opposite side lights red. When closed or closing, both sides are red. |
| OU4 = 9 | When closed, green on the inside and red on the outside; when open, the reverse. In intermediate positions, both sides are red. |
Counters, versions and service data
| Menu | Use |
|---|---|
| MnP – Set number of operations | Press to display, in sequence: a = units, b = thousands, c = millions. Used for maintenance signalling. |
| MnE – Number of operations performed | Press to display, in sequence: t = units, u = thousands, v = millions. |
| ErS – Clear | 1 – devices; 2 – positions; 3 – function values; 5 – all. Procedure and subsequent learning. |
| Fir – Firmware version | Press twice to display the two three-digit identification sections. |
| Hdr – Hardware version | Press three times to display the three three-digit identification sections. |
| din – Input diagnostics | Input and display statuses. |
The service counter is not reset when the control board is reset. Reset it using OVIEW only after maintenance has been completed and recorded.
Two opposing barriers: Master–Slave
Two complete barriers can be synchronized. Each has its own motor, control unit and power supply; they are not connected as two motors on a single board. Connect the communication terminals 1–1 and 2–2 using 2 × 1 mm² cable, up to 20 m long.
- Complete the installation, direction setting, balancing and electrical wiring on both barriers.
- On the Slave barrier, perform Set 1 and Set 2, set its speeds, slowdown and force, then set F09 = On.
- On the Master barrier, perform Set 1 and Set 2. Until then, the Slave may report communication error E05.
- Issue a command from the Master unit and check the movement of both booms and the safety devices.
Shared BlueBUS devices and the receiver belong on the Master. The Slave's own SbS/OPEN/CLOSE commands can operate only its own boom. Speed, slowdown, slowdown position and force are set separately for each barrier. For backup power, each barrier needs its own PS224.
Remote controls and backup power
Receiver and transmitters
The board has an SM socket for a compatible receiver. Current selection OXIBD allows the use of compatible remotes, for example ON2E. Connect the receiver with both the mains power and battery disconnected. Store and delete remotes according to the specific receiver; resetting the control board does not replace the receiver’s radio programming procedure.
PS224 during a power outage
PS224 is connected only after installation and programming are complete: disconnect the mains, fit the battery, and connect the designated cable to the backup connector; then restore mains power. Mode F05 = 4 can reduce power consumption when running on battery power. The function F07 = On commands the gate to open during a mains failure if a battery is present; it is not enabled by default.
Solemyo SYKCE30 is a different power supply option. When using Solemyo, the barrier must not be connected to the 230 V mains at the same time. Assess the power source capacity based on the number of operating cycles and the accessories installed.
Troubleshooting
First, identify the code shown on the display or count the short flashes. The diagnostic sequence repeats after a pause of about 1 s; normal flashing during movement is not a fault code.
When the barrier does not respond or moves incorrectly
| Symptom | What to check |
|---|---|
| The remote does not respond and its LED does not light up | Check the remote’s battery. |
| The remote’s LED lights up, but the barrier does not respond | Check that the remote is programmed and compatible with the installed receiver; receiver and remote control. |
| The display is off and no command works | Check the power supply and fuses F1/F2. Replace a fuse only after identifying the cause, and use the same type and rating; never bypass the fuse. |
| A command is issued, but the operating cycle does not start | For a wired command, check the LED for the relevant input. If the warning light signals a fault, use the code table below. |
| The arm immediately reverses direction or moves unusually slowly | First check the balance, free movement, stops and limit switches. If the control board does not detect the end position, check the switches and position learning. |
| The arm moves in the opposite direction | Check the spring side and direction switch. Do not swap the wires blindly. |
| Code / signal | What to check |
|---|---|
| E01 / 1 flash | BlueBUS/STOP devices changed or not learned. Check the wiring, then run Set 1. |
| E02 | Positions not learned; after checking the stops and balance, run Set 2. |
| E03 | Limit switches reversed; check their direction and electrical connections. |
| E04 | Encoder signal missing; check the sensor connector and cable. |
| E05 | Communication error Master–Slave; check the polarity and learning of both barriers. |
| E06 / 5 flashes | Parameter memory error. Disconnect and restore all power sources, then try again; if the problem persists, servicing is required, possibly including a full reset and relearning. |
| E07 / 7 flashes | Internal electronics error. Disconnect all power sources; if the fault recurs, arrange servicing. |
| E08 | Barrier type configuration; check the control board’s factory settings. |
| E09 / 9 flashes | Software lockout. Enter the designated unlock command, or HP SbS if applicable; this is not mechanical release using a key. |
| E10 | NC safety contact or limit switch missing; check SAFETY and the switches. |
| E11 | BlueBUS short circuit. With the power disconnected, check the wiring and devices. After correcting the cause, restore power, issue a command, and wait 40 s. If the fault recurs, servicing is required. |
| I02 / 2 flashes | Photocell active. Remove the obstruction, clean the optics, and check the alignment. |
| I03 / 3 flashes | Force limit triggered. First check the balance, friction, and stops. Do not increase the force to compensate for a mechanical fault. |
| I04 / 4 flashes | STOP triggered. Find the cause in the connected device; do not bypass the safety input. |
LEDs and din mode
STOP is lit when the input is normally enabled; if it goes out, the input has been triggered. The SbS, OPEN, CLOSE, and HP SbS LEDs light up when a command is active. The FC1/FC2 status depends on the RH/LH switch: with RH, FC1 goes out when closed and FC2 when open; with LH, the reverse applies.
Display codes and warning-light flash counts are numbered differently. For example, E06 means five flashes; sequences of six and eight flashes have no assigned function in this configuration.
The din menu displays the inputs using segments of the three display digits. Labels A to G and the dp decimal point are shown in the diagram. For FC1/FC2, the open and closed positions are determined by the RH/LH setting described above.
| Digit | Segment and meaning |
|---|---|
| First | A1 – LOOP1 B1 – CLOSE C1 – HP SbS D1 – LOOP2 E1 – OPEN F1 – SbS G1 – not used dp1 – flashes once per second while the control board is running |
| Second | A2 – FC1 B2 – CLOSE button on the control board C2 – RH direction D2 – battery power E2 – LH direction F2 – OPEN button on the control board G2 – FC2 dp2 – motor sensor input A |
| Third | A3 – FA1 opening photocell B3 – PHOTO active C3 – PHOTO II active D3 – FA2 opening photocell E3 – PHOTO 1 active F3 – PHOTO 1 II active G3 – Master detected Slave dp3 – motor sensor input B |
The dp2/dp3 indicators may be lit or unlit when the motor is stopped, depending on the sensor position; they flash while it is moving. Correct the direction in the mechanism and switch, not by randomly swapping wires.
Clearing settings and starting again
Select ErS, press the button, select the desired value and confirm. 1 deletes learned devices, 2 positions, 3 function values, 5 all control unit data. After a full reset, repeat Set 1, Set 2, configuration and safety tests.
Control board reset does not reset the number of manoeuvres performed. Reset the service counter after maintenance has actually been carried out using OVIEW. Erase transmitters using the procedure for the specific receiver.
Manual arm release
In the event of a power failure, fault or installation work, stop operation, disconnect the power supply and ensure the area is clear. Hold the arm in place; an incorrectly balanced arm may move on its own.
- Insert the release key and turn it 180° to the left or right.
- Move the arm manually to the required position.
- To resume motorised operation, return the key to its original position and remove it. Check that the arm is secured and that control has been safely restored.
Maintenance and service life
For an existing installation with BCU1 R10, schedule a professional inspection no later than after 6 months or 20,000 manoeuvres, whichever comes first. With intensive use, the cycle limit may be reached much sooner. Check the balance again after changing the arm accessories.
Disconnect all power sources. Also check that the two arm sections are firmly connected, as well as the XBA9 coupling expansion bolts, corrosion, anchoring, bolts and spring attachment, shaft play, arm condition and release mechanism operation. After restoring the power supply, repeat the safety device and force tests. Record servicing and any spring replacement in the maintenance log.
Factors affecting the estimated service life
| Characteristics of the entire automation system | Index | Service life graph |
|---|---|---|
| Speed, level 3 | 15% | |
| Speed, level 2 | 10% | |
| Photocell activations in more than 10% of manoeuvres | 15% | |
| STOP activations in more than 10% of manoeuvres | 15% | |
| WA12 mobile support | 10% in an approved configuration | |
| Salt in the environment | 10% | |
| Dust / sand | 5% | |
| Under-skirt | 5% in an approved configuration | |
| Temperature above 40 °C or below 0 °C | 5% | |
| Set force FrO / FrC | Level 4: 5% Level 5: range 5–10% Level 6: 10% |
Speed levels 2 and 3 are alternatives; add only the level in use. No index is specified for level 4, so do not estimate the cycle count for it. Add the indices for all other applicable factors. Find the total on the graph's horizontal axis and read the estimated number of cycles from the vertical axis. At force level 5, the estimate is a range; do not estimate the cycle count beyond the graph's range. The estimate assumes correct installation and regular maintenance; it does not guarantee a cycle count or justify postponing service.
Technical specifications of the NICE LBAR barrier
| Parameter | Value |
|---|---|
| Model | NICE LBAR – without boom |
| Type | Electromechanical barrier with a 24 V DC motor and built-in control unit |
| Control unit | BCU1 R10 (XBA3 R10) |
| Mains power supply | 230 V AC, 50/60 Hz |
| Motor voltage | 24 V DC |
| Current draw | 1.3 A |
| Maximum power consumption at startup | 160 W |
| Power consumption at rated torque | 50 W |
| Operating time | 8–12 s for the specified BCU1 R10 assembly |
| Starting torque | 400 Nm |
| Rated torque | 130 Nm |
| Max. frequency at rated torque | 150 cycles/h |
| Clear passage width | 7–9 m |
| Protection rating | IP54 |
| Operating temperature | −20 to +55 °C |
| Cabinet dimensions | 500 × 299 × 1 215 mm (width × depth × height) |
| Weight | 98 kg |
| Insulation class | I |
| Backup power supply | PS224 |
| Solar power supply | Solemyo SYKCE30 |
The specifications apply at a reference temperature of approximately 20 °C. Consider them together with the arm length, equipment, and balance. For a different operator or control unit version, check the movement time and available settings against the markings on the device.
The drawing also shows protruding parts and the precise dimensions 298.5 and 1 219.5 mm. Use the drawing, not just the rounded cabinet dimensions in the table, when anchoring and positioning.
How can I order this item?
Choose the option that suits you:
- order online: use the buy button to add the goods to your shopping cart (you will find the buy button here in the product variants table).
- order by email: place your order at [email protected]






























