Wiring the PH-42 magnetic switch
Wiring instructions PH-42 magnetic switch.
The magnetic switch must always be connected to the STOP input, and the gate must be closed (i.e. close the circuit by bringing the magnets together) and proceed as follows:
NICE Road
Connect it to terminals 3-4, then perform a RESET (hold OPEN and CLOSE until all the lights come on), then detect the devices again and program the entire motor.
NICE Robus, Run, and all models with BlueBUS (except MC800)
Connect it to the STOP terminal, then detect the connected devices: Press and hold the OPEN and STOP/SET buttons together until the L1+L2 LEDs start flashing faster together, then release them. Wait until L1+L2 finish flashing; the devices have then been detected.
MC424LR10 control unit
Connect it to terminals 8-9. If there is a jumper between terminals 8-9 (as supplied from the factory), remove it, but then move the wires that were connected to terminal 9 to terminal 8.
MC424L control unit
Connect it to terminals 11-12. If there is a jumper between terminals 11-12 (as supplied from the factory), remove it, but then move the wires that were connected to terminal 12 to terminal 11.
MC800 control unit
Connect it to terminals 4-12, then detect the connected devices: Press and hold the OPEN and STOP/SET buttons together until the L1+L2 LEDs start flashing faster together, then release them. Wait until L1+L2 finish flashing; the devices have then been detected.
NICE SHEL operator
Connect it to terminals 1-2, then perform a RESET and then detect the devices and program the entire motor.
NICE SPINBUS operator
Connect it to the STOP terminal, then detect the connected devices: Press and hold the OPEN and STOP/SET buttons together until the L1+L2 LEDs start flashing faster together, then release them. Wait until L1+L2 finish flashing; the devices have then been detected.