Simplified procedure for connecting and starting the MC824HR10 control unit (with MCA1R10)

If you don't feel like reading the entire manual for NICE Toona 24V operators with the NICE MC824HR10 control unit (with MCA1R10), you can get the operator up and running in just a few minutes using this simplified procedure.

We assume that the swing gate can be opened and closed manually and, of course, that its movement is limited by stops at the end positions – see Limiting swing gate movement with stops.

The easiest way is to get the motors running with the control unit alone, then connect any accessories one at a time later. But you can also connect the accessories straight away; it doesn't matter when you do it, as anything can be connected or disconnected at any time. The control unit can always be returned to factory settings.

Step 0. Wiring

Power supply cable
Terminal L – live wire from the power supply cable
Terminal N – neutral wire from the power supply cable
Terminal with the earth symbol – earth wire from the power supply cable

Motors
First determine which motor is the primary one and which is the secondary one. The primary motor is the one that closes first.
For outward opening, reverse the polarity (positive and negative) on both motors. If you have only one motor, connect it to M2.

Flashing light
Connect the two-core cable from the flashing light, from the terminal marked with the bulb symbol, to the FLASH terminal on the control unit. If you are not installing a flashing light, leave the FLASH terminal unconnected.

Antenna
If your control unit has a radio receiver with a terminal, connect the antenna to it. If not, connect the antenna to the control unit. If you don't have an antenna, connect the supplied short wire (a temporary antenna) to the first terminal on the receiver.

Photocells
Run a two-core cable from the BUS (BlueBUS) terminal on the control unit to each photocell, or run it from the control unit to the first photocell and from there to the second. The polarity does not matter. Do not interrupt any circuits on the circuit board.

Step 1. Procedure for getting the operator running:

  1. Disconnect the control unit from the power supply. The easiest way is to remove the power supply fuse.
  2. Unlock the operators and manually move the gate leaves to approximately halfway along their travel (so the gate is neither open nor closed), lock the operators, then pull the leaves slightly to engage the gearbox.
  3. Set the operator model selector to match your operator model.
    Operator model DIP switch settings
    MB4024, MB5024, HY7024, HY7124 all switches down, switch 1 up
    MFAB3024 all switches down, switch 2 up
    TO4024, XFAB2124, LFAB4024 all switches down, switch 3 up
    TO5024, TO5024I all switches down, switch 4 up
    TO7024, TO6024HS all switches down, switch 5 up
    BFAB5024 all switches down, switch 6 up
    METROELITE, MFAB3024HS, TO5024HS all switches down, switch 7 up
    WINGOELITE, WG3524HS, LFAB4024HS,
    TTN3724HS, TTN6024HS
    all switches down, switch 8 up
  4. Restore power to the operator.
  5. With the factory settings (or after a reset), the BlueBUS and L1+L2 LEDs on the control unit should be flashing.
  6. Detect the connected devices: Press and hold the OPEN+STOP/SET buttons together (the first and second buttons). When the L1+L2 LEDs start flashing faster (after approx. 3–4 seconds), release the buttons. The L1+L2 LEDs will continue flashing briefly, then L3+L4 will start flashing.
  7. Run the gate travel learning procedure: Press and hold the STOP/SET+CLOSE buttons together. When L3+L4 start flashing faster (after approximately 5 seconds) and the gate starts moving, release the buttons.
    Note: for the full leaf learning procedures, see the separate article on learning gate-leaf movement.
  8. The leaves will perform the following sequence (the gate-leaf movement learning procedure can be interrupted at any time by pressing STOP):
    1. Both leaves open slightly.
      Note: If they move in the opposite direction, i.e. close slightly, interrupt the manoeuvre by pressing STOP, disconnect the control unit from the power supply, and reverse the polarity on both motors. If one leaf starts opening and the other starts closing, reverse the polarity only on the motor that started closing. To reverse the polarity, swap the wires between the + (positive) and – (negative) terminals in the three-terminal motor connector for that motor. Also swap the wires on that motor's encoder.
    2. The lower leaf closes completely.
      Note: If the wrong leaf starts moving (i.e. the upper one), interrupt the manoeuvre by pressing STOP, disconnect the control unit from the power supply, and swap the complete M1 and M2 three-terminal motor connectors.
    3. The upper leaf closes completely.
    4. The upper leaf starts opening, followed shortly by the lower leaf.
    5. Both leaves open completely.
    6. The lower leaf starts closing, followed shortly by the upper leaf.
    7. Both leaves close completely, and the control unit saves their end positions to memory.
  9. L3+L4 turn off, and you should now be able to open and close the gate using the OPEN, STOP/SET and CLOSE buttons. The OPEN button opens the gate, the CLOSE button closes it, and the STOP/SET button stops it.
  10. Congratulations—great job getting the NICE MC824HR10 swing-gate control unit up and running!

If you haven't already, you can connect the photocells, flashing light, key switch or other accessories, insert the receiver, and pair the remote controls.